{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,18]],"date-time":"2025-10-18T09:58:27Z","timestamp":1760781507680,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":19,"publisher":"ACM","license":[{"start":{"date-parts":[[2006,7,8]],"date-time":"2006-07-08T00:00:00Z","timestamp":1152316800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2006,7,8]]},"DOI":"10.1145\/1143997.1144293","type":"proceedings-article","created":{"date-parts":[[2006,7,24]],"date-time":"2006-07-24T16:53:01Z","timestamp":1153759981000},"page":"1841-1848","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":20,"title":["Effective genetic approach for optimizing advanced planning and scheduling in flexible manufacturing system"],"prefix":"10.1145","author":[{"given":"Haipeng","family":"Zhang","sequence":"first","affiliation":[{"name":"Waseda University, Kitakyushu, JAPAN"}]},{"given":"Mitsuo","family":"Gen","sequence":"additional","affiliation":[{"name":"Waseda University, Kitakyushu, JAPAN"}]}],"member":"320","published-online":{"date-parts":[[2006,7,8]]},"reference":[{"key":"e_1_3_2_1_1_1","volume-title":"Computational Integrated in Design & Manufacturing","author":"Kusiak A.","year":"2000","unstructured":"Kusiak , A. Computational Integrated in Design & Manufacturing . John Wiley & Sons , New York , 2000 . Kusiak, A. Computational Integrated in Design & Manufacturing. John Wiley & Sons, New York, 2000."},{"key":"e_1_3_2_1_2_1","volume-title":"Midrange ERP Magazine","author":"Turbide D.","year":"1998","unstructured":"Turbide , D. Advanced Planning and Scheduling (APS) Systems . Midrange ERP Magazine , 1998 . Turbide, D. Advanced Planning and Scheduling (APS) Systems. Midrange ERP Magazine, 1998."},{"key":"e_1_3_2_1_3_1","volume-title":"Advanced Planning and Scheduling: Is logistic everything? A research on the use (fullness) of advanced planning and scheduling systems. Technique report","author":"Eck M.","year":"2003","unstructured":"Eck , M. Advanced Planning and Scheduling: Is logistic everything? A research on the use (fullness) of advanced planning and scheduling systems. Technique report , Vrije University , Amsterdam, Holland . 2003 . Eck, M. Advanced Planning and Scheduling: Is logistic everything? A research on the use (fullness) of advanced planning and scheduling systems. Technique report, Vrije University, Amsterdam, Holland. 2003."},{"doi-asserted-by":"publisher","key":"e_1_3_2_1_4_1","DOI":"10.1023\/A:1008952024606"},{"doi-asserted-by":"publisher","key":"e_1_3_2_1_5_1","DOI":"10.1023\/B:JIMS.0000037710.80847.b6"},{"doi-asserted-by":"publisher","key":"e_1_3_2_1_6_1","DOI":"10.1080\/002075400189653"},{"doi-asserted-by":"publisher","key":"e_1_3_2_1_7_1","DOI":"10.1016\/S0925-5273(00)00084-0"},{"key":"e_1_3_2_1_8_1","volume-title":"Proc. of 15th International Conference on Production Research","author":"Chung D.","year":"2000","unstructured":"Chung , D. , Lee , K. , Shin , K. , and Park , J . An algorithm for job shop scheduling problem with due date constraints considering operation subcontract . In Proc. of 15th International Conference on Production Research , 2000 . Chung, D., Lee, K., Shin, K., and Park, J. An algorithm for job shop scheduling problem with due date constraints considering operation subcontract. In Proc. of 15th International Conference on Production Research, 2000."},{"doi-asserted-by":"publisher","key":"e_1_3_2_1_9_1","DOI":"10.1016\/j.cie.2004.12.012"},{"doi-asserted-by":"publisher","key":"e_1_3_2_1_10_1","DOI":"10.1109\/TSMCC.2002.1009117"},{"doi-asserted-by":"publisher","key":"e_1_3_2_1_11_1","DOI":"10.1109\/ICSMC.2002.1176334"},{"key":"e_1_3_2_1_12_1","first-page":"3","article-title":"A STEP-based manufacturing information system to share flexible manufacturing resources data","volume":"16","author":"Lopez O.","year":"2005","unstructured":"Lopez , O. , and Ramirez , M . A STEP-based manufacturing information system to share flexible manufacturing resources data . Journal of Intelligent Manufacturing , 16 , 3 , 2005 , 287--301. Lopez, O., and Ramirez, M. A STEP-based manufacturing information system to share flexible manufacturing resources data. Journal of Intelligent Manufacturing, 16, 3, 2005, 287--301.","journal-title":"Journal of Intelligent Manufacturing"},{"doi-asserted-by":"publisher","key":"e_1_3_2_1_13_1","DOI":"10.1080\/00207540410001691956"},{"doi-asserted-by":"publisher","key":"e_1_3_2_1_14_1","DOI":"10.1016\/j.cie.2005.01.016"},{"key":"e_1_3_2_1_16_1","volume-title":"Genetic Algorithms and Engineering Design","author":"Gen M.","year":"1997","unstructured":"Gen , M. , and Cheng R . Genetic Algorithms and Engineering Design , John Wiley & Sons , New York , 1997 . Gen, M., and Cheng R. Genetic Algorithms and Engineering Design, John Wiley & Sons, New York, 1997."},{"doi-asserted-by":"publisher","key":"e_1_3_2_1_17_1","DOI":"10.1016\/S0305-0548(96)00061-5"},{"doi-asserted-by":"publisher","key":"e_1_3_2_1_18_1","DOI":"10.1016\/j.ejor.2004.03.012"},{"key":"e_1_3_2_1_19_1","volume-title":"Genetic Algorithms & Engineering Optimization","author":"Gen M.","year":"2000","unstructured":"Gen , M. , and Cheng , R . Genetic Algorithms & Engineering Optimization . John Wiley & Sons , New York , 2000 . Gen, M., and Cheng, R. Genetic Algorithms & Engineering Optimization. John Wiley & Sons, New York, 2000."},{"key":"e_1_3_2_1_20_1","first-page":"223","article-title":"Multistage-based genetic algorithm for flexible job-shop scheduling problem","volume":"11","author":"Zhang H.","year":"2005","unstructured":"Zhang , H. , and Gen , M . Multistage-based genetic algorithm for flexible job-shop scheduling problem . Journal of Complexity International , 11 , 2005 , 223 -- 232 . Zhang, H., and Gen, M. Multistage-based genetic algorithm for flexible job-shop scheduling problem. Journal of Complexity International, 11, 2005, 223--232.","journal-title":"Journal of Complexity International"}],"event":{"sponsor":["SIGEVO ACM Special Interest Group on Genetic and Evolutionary Computation","ACM Association for Computing Machinery"],"acronym":"GECCO06","name":"GECCO06: Genetic and Evolutionary Computation Conference","location":"Seattle Washington USA"},"container-title":["Proceedings of the 8th annual conference on Genetic and evolutionary computation"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/1143997.1144293","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/1143997.1144293","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T16:08:29Z","timestamp":1750262909000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/1143997.1144293"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,7,8]]},"references-count":19,"alternative-id":["10.1145\/1143997.1144293","10.1145\/1143997"],"URL":"https:\/\/doi.org\/10.1145\/1143997.1144293","relation":{},"subject":[],"published":{"date-parts":[[2006,7,8]]},"assertion":[{"value":"2006-07-08","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}