{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,10]],"date-time":"2026-04-10T19:31:00Z","timestamp":1775849460932,"version":"3.50.1"},"publisher-location":"New York, NY, USA","reference-count":21,"publisher":"ACM","license":[{"start":{"date-parts":[[2013,5,18]],"date-time":"2013-05-18T00:00:00Z","timestamp":1368835200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2013,5,18]]},"DOI":"10.1145\/2486046.2486073","type":"proceedings-article","created":{"date-parts":[[2013,5,16]],"date-time":"2013-05-16T18:04:44Z","timestamp":1368727484000},"page":"146-155","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":6,"title":["Search based risk mitigation planning in project portfolio management"],"prefix":"10.1145","author":[{"given":"Junchao","family":"Xiao","sequence":"first","affiliation":[{"name":"ISCAS, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Leon J.","family":"Osterweil","sequence":"additional","affiliation":[{"name":"University of Massachusetts at Amherst, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jie","family":"Chen","sequence":"additional","affiliation":[{"name":"ISCAS, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qing","family":"Wang","sequence":"additional","affiliation":[{"name":"ISCAS, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mingshu","family":"Li","sequence":"additional","affiliation":[{"name":"ISCAS, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2013,5,18]]},"reference":[{"key":"e_1_3_2_1_1_1","volume-title":"Carnegie Mellon University","author":"I\u00ae","year":"2006","unstructured":"CMMI\u00ae for Development, Version 1.2, CMU\/SEI-2006-TR- 008, ESC-TR-2006-008. Carnegie Mellon University, Software Engineering Institute, Pittsburgh, Pa., 2006."},{"key":"e_1_3_2_1_2_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2006.12.020"},{"key":"e_1_3_2_1_3_1","volume-title":"City","author":"Antoniol G.","year":"2005","unstructured":"Antoniol, G., Penta, M. D. and Harman, M. Search\u2013Based Techniques Applied to Optimization of Project Planning for a Massive Maintenance Project. City, 2005."},{"key":"e_1_3_2_1_4_1","doi-asserted-by":"publisher","DOI":"10.1109\/52.62930"},{"key":"e_1_3_2_1_5_1","volume-title":"International Conference on Computational Intelligence and Software Engineering (CiSE)2009)","author":"Cao P.","unstructured":"Cao, P. and Chen, F. A Risk Control Optimization Model for Software Project. International Conference on Computational Intelligence and Software Engineering (CiSE)2009)."},{"key":"e_1_3_2_1_6_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.infsof.2008.03.002"},{"key":"e_1_3_2_1_7_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jss.2003.12.032"},{"key":"e_1_3_2_1_8_1","volume-title":"City","author":"Freimut B.","year":"2001","unstructured":"Freimut, B., Hartkopf, S., Kontio, J. and Kobitzsch, W. An Industrial Case Study of Implementing Software Risk Management. City, 2001."},{"key":"e_1_3_2_1_9_1","volume-title":"City","author":"Gueorguiev S.","year":"2009","unstructured":"Gueorguiev, S., Harman, M. and Antoniol, G. Software Project Planning for Robustness and Completion Time in the Presence of Uncertainty using Multi Objective Search Based Software Engineering. City, 2009."},{"key":"e_1_3_2_1_10_1","volume-title":"City","author":"Harman M.","year":"2010","unstructured":"Harman, M. The Relationship between Search Based Software Engineering and Predictive Modeling. City, 2010."},{"key":"e_1_3_2_1_11_1","doi-asserted-by":"publisher","DOI":"10.5555\/129194"},{"key":"e_1_3_2_1_12_1","volume-title":"Risks analysis of software development using bayesian belief network and non-linear programming methods","author":"Hui A. K. T.","year":"2009","unstructured":"Hui, A. K. T. Risks analysis of software development using bayesian belief network and non-linear programming methods. The Claremont Graduate University and California State University, Long Beach, 2009."},{"key":"e_1_3_2_1_13_1","author":"K\u0131l\u0131c M.","unstructured":"K\u0131l\u0131c, M., Ulusoy, G. n. z. and lu, F. S. S.-e. A bi-objective genetic algorithm approach to risk mitigation in project scheduling. International Journal of Production Economics, 1122008), 202-216.","journal-title":"International Journal of Production Economics, 112"},{"key":"e_1_3_2_1_14_1","volume-title":"Laboratory for Advanced Software Engineering Research","author":"Little","year":"2006","unstructured":"LASER. Little-JIL 1.5 Language Report. UM-CS-2006-51, Laboratory for Advanced Software Engineering Research, University of Massachusetts, 2006."},{"key":"e_1_3_2_1_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2011.09.040"},{"key":"e_1_3_2_1_16_1","doi-asserted-by":"publisher","unstructured":"Melo A. C. V. d. and Sanchez A. J. Software maintenance project delays prediction using Bayesian Networks. Expert Systems with Applications 342008) 908\u2013919. 10.1016\/j.eswa.2006.10.040","DOI":"10.1016\/j.eswa.2006.10.040"},{"key":"e_1_3_2_1_17_1","volume-title":"PMI A Guide to the Project Management Body of Knowledge (PMBOK\u00ae Guide)\u2014","year":"2008","unstructured":"PMI A Guide to the Project Management Body of Knowledge (PMBOK\u00ae Guide)\u2014Fourth Edition. Project Management Institute, Inc., 2008."},{"key":"e_1_3_2_1_18_1","doi-asserted-by":"publisher","DOI":"10.5555\/1884224.1884250"},{"key":"e_1_3_2_1_19_1","volume-title":"City","author":"Xiao J.","year":"2009","unstructured":"Xiao, J., Wang, Q., Li, M., Yang, Q., Xie, L. and Liu, D. Value-based Multiple Software Projects Scheduling with Genetic Algorithm. City, 2009."},{"key":"e_1_3_2_1_20_1","doi-asserted-by":"publisher","DOI":"10.1109\/CIT.2005.151"},{"key":"e_1_3_2_1_21_1","first-page":"708","author":"Zafra-Cabeza A.","year":"1902","unstructured":"Zafra-Cabeza, A., Ridao, M. A. and Camacho, E. F. Using A Risk-Based Approach to Project Scheduling: A Case Illustration from Semiconductor Manufacturing. European Journal of Operation Research, 1902008), 708-723.","journal-title":"Semiconductor Manufacturing. European Journal of Operation Research"}],"event":{"name":"ICSSP '13: International Conference on Software and System Process","location":"San Francisco CA USA","acronym":"ICSSP '13"},"container-title":["Proceedings of the 2013 International Conference on Software and System Process"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/2486046.2486073","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/2486046.2486073","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T07:28:52Z","timestamp":1750231732000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/2486046.2486073"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,5,18]]},"references-count":21,"alternative-id":["10.1145\/2486046.2486073","10.1145\/2486046"],"URL":"https:\/\/doi.org\/10.1145\/2486046.2486073","relation":{},"subject":[],"published":{"date-parts":[[2013,5,18]]},"assertion":[{"value":"2013-05-18","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}