{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,19]],"date-time":"2025-06-19T04:50:00Z","timestamp":1750308600643,"version":"3.41.0"},"reference-count":7,"publisher":"Association for Computing Machinery (ACM)","issue":"2","license":[{"start":{"date-parts":[[2016,5,11]],"date-time":"2016-05-11T00:00:00Z","timestamp":1462924800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":["SIGSOFT Softw. Eng. Notes"],"published-print":{"date-parts":[[2016,5,11]]},"abstract":"<jats:p>As the software features and technology advances, delivering quality embedded software for consumer products become more important and challenging than ever within organizations. This is particularly vital when these products are delivered as part of chips. These chips or better known as system-on-chip (SoC) are embedded as part of today's gadgets. They are used by consumers for their everyday use, namely mobile phones and tablets. In this case study, I will share several significant changes which have taken place in the testing embedded software industries when the transition takes place from V-model methodology to Agile Scrum in the organization. These changes are particularly related to software testing perspectives. Apart from that, I will share the challenges that have been faced and how we have managed them since the organization fully adopted Agile Scrum within the first 18 months. Finally, I will describe the way Agile Scrum has evolved and keys for QA successes in ensuring business wins with our major players of embedded software original equipment manufacturers (OEMs).<\/jats:p>","DOI":"10.1145\/2894784.2894793","type":"journal-article","created":{"date-parts":[[2016,5,13]],"date-time":"2016-05-13T14:30:58Z","timestamp":1463149858000},"page":"1-3","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":1,"title":["Industrial Case Study of Transition from V-Model into Agile SCRUM in Embedded Software Testing Industries"],"prefix":"10.1145","volume":"41","author":[{"given":"Jason Lee Hua","family":"Jie","sequence":"first","affiliation":[{"name":"Dolby Laboratories, Inc. Sydney, Australia"}]}],"member":"320","published-online":{"date-parts":[[2016,5,11]]},"reference":[{"key":"e_1_2_1_1_1","unstructured":"\"Dictionary of ibm and computing terminology.\" www-03. ibm.com\/ibm\/history\/documents\/pdf\/glossary.pdf. Accessed: 2014-09-27.  \"Dictionary of ibm and computing terminology.\" www-03. ibm.com\/ibm\/history\/documents\/pdf\/glossary.pdf. Accessed: 2014-09-27."},{"volume-title":"INCOSE International Symposium","year":"1991","author":"Forsberg K.","key":"e_1_2_1_2_1"},{"volume-title":"Dymax","year":"2011","author":"Johnson Hillary Louise","key":"e_1_2_1_3_1"},{"key":"e_1_2_1_4_1","unstructured":"Atlassian JIRA: \"System dashboard.\" https:\/\/jira.atlassian.com\/. Accessed: 2015-07-01.  Atlassian JIRA: \"System dashboard.\" https:\/\/jira.atlassian.com\/. Accessed: 2015-07-01."},{"key":"e_1_2_1_5_1","unstructured":"A. Cockburn and L. Williams. \"The costs and benefits of pair programming.\" In Proceedings of the First International Conference on Extreme Programming and Flexible Processes in Software Engineering (XP 2000) 2000.  A. Cockburn and L. Williams. \"The costs and benefits of pair programming.\" In Proceedings of the First International Conference on Extreme Programming and Flexible Processes in Software Engineering (XP 2000) 2000."},{"key":"e_1_2_1_6_1","unstructured":"S. B. Furber. \"Arm system-on-chip architecture.\" Addison-Wesley 2000.   S. B. Furber. \"Arm system-on-chip architecture.\" Addison-Wesley 2000."},{"key":"e_1_2_1_7_1","unstructured":"Loukides Mike. What is DevOps?. \" O'Reilly Media Inc.\" 2012.  Loukides Mike. What is DevOps?. \" O'Reilly Media Inc.\" 2012."}],"container-title":["ACM SIGSOFT Software Engineering Notes"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/2894784.2894793","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/2894784.2894793","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T19:05:41Z","timestamp":1750273541000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/2894784.2894793"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,5,11]]},"references-count":7,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2016,5,11]]}},"alternative-id":["10.1145\/2894784.2894793"],"URL":"https:\/\/doi.org\/10.1145\/2894784.2894793","relation":{},"ISSN":["0163-5948"],"issn-type":[{"type":"print","value":"0163-5948"}],"subject":[],"published":{"date-parts":[[2016,5,11]]},"assertion":[{"value":"2016-05-11","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}