{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,13]],"date-time":"2025-10-13T15:32:02Z","timestamp":1760369522991,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":15,"publisher":"ACM","license":[{"start":{"date-parts":[[2019,4,12]],"date-time":"2019-04-12T00:00:00Z","timestamp":1555027200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2019,4,12]]},"DOI":"10.1145\/3325730.3325741","type":"proceedings-article","created":{"date-parts":[[2019,6,21]],"date-time":"2019-06-21T12:45:07Z","timestamp":1561121107000},"page":"128-132","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":1,"title":["A Metaheuristic to Solve a Robotic Cell Job-shop Scheduling Problem with Time Window Constraints"],"prefix":"10.1145","author":[{"given":"Xiaohui","family":"Li","sequence":"first","affiliation":[{"name":"School of Electronics and Control Engineering, Chang'An University, Xi'an, China"}]},{"given":"Yi","family":"Zhao","sequence":"additional","affiliation":[{"name":"School of Electronics and Control Engineering, Chang'An University, Xi'an, China"}]},{"given":"Xi","family":"Yang","sequence":"additional","affiliation":[{"name":"School of Electronics and Control Engineering, Chang'An University, Xi'an, China"}]},{"given":"Yuan","family":"Dong","sequence":"additional","affiliation":[{"name":"School of Electronics and Control Engineering, Chang'An University, Xi'an, China"}]}],"member":"320","published-online":{"date-parts":[[2019,4,12]]},"reference":[{"key":"e_1_3_2_1_1_1","unstructured":"Dawande M. Geismar H Sethi S and Sriskandarajah C. 2007. Throughput Optimization in Robotic Cells. Springer US.  Dawande M. Geismar H Sethi S and Sriskandarajah C. 2007. Throughput Optimization in Robotic Cells. Springer US."},{"key":"e_1_3_2_1_2_1","doi-asserted-by":"publisher","DOI":"10.1007\/BF01324886"},{"key":"e_1_3_2_1_3_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.robot.2015.05.002"},{"key":"e_1_3_2_1_4_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2017.09.018"},{"key":"e_1_3_2_1_5_1","volume-title":"Multi-degree cyclic flow shop robotic cell scheduling problem: Ant colony optimization. Computers & Operations Research. 73 (Sept","author":"Elmi A.","year":"2016","unstructured":"Elmi , A. , Topaloglu , S. 2016. Multi-degree cyclic flow shop robotic cell scheduling problem: Ant colony optimization. Computers & Operations Research. 73 (Sept . 2016 ), 67--83. Elmi, A., Topaloglu, S. 2016. Multi-degree cyclic flow shop robotic cell scheduling problem: Ant colony optimization. Computers & Operations Research. 73 (Sept. 2016), 67--83."},{"key":"e_1_3_2_1_6_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2016.08.006"},{"key":"e_1_3_2_1_7_1","volume-title":"Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times. Applied Mathematical Modelling. 40 (Mar","author":"Shabtay D.","year":"2016","unstructured":"Shabtay , D. , Arviv , K , 2015. Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times. Applied Mathematical Modelling. 40 (Mar . 2016 ), 4231--4247. Shabtay, D., Arviv, K, 2015. Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times. Applied Mathematical Modelling. 40 (Mar. 2016), 4231--4247."},{"key":"e_1_3_2_1_8_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2010.03.002"},{"key":"e_1_3_2_1_9_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2014.04.002"},{"key":"e_1_3_2_1_10_1","volume-title":"A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints. Applied Mathematical Modelling, 36(Aug","author":"Zhou Z.","year":"2012","unstructured":"Zhou , Z. , Che , A. D and Yan , P. Y . A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints. Applied Mathematical Modelling, 36(Aug . 2012 ), 3621--3629. Zhou, Z., Che, A. D and Yan, P. Y. A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints. Applied Mathematical Modelling, 36(Aug. 2012), 3621--3629."},{"key":"e_1_3_2_1_11_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2011.07.008"},{"key":"e_1_3_2_1_12_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2008.03.051"},{"key":"e_1_3_2_1_13_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2011.02.050"},{"key":"e_1_3_2_1_14_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-25944-9_7"},{"key":"e_1_3_2_1_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2006.12.030"}],"event":{"name":"ICMAI 2019: 2019 4th International Conference on Mathematics and Artificial Intelligence","sponsor":["Southwest Jiaotong University","Xihua University Xihua University"],"location":"Chegndu China","acronym":"ICMAI 2019"},"container-title":["Proceedings of the 2019 4th International Conference on Mathematics and Artificial Intelligence"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3325730.3325741","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3325730.3325741","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T23:54:22Z","timestamp":1750204462000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3325730.3325741"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,4,12]]},"references-count":15,"alternative-id":["10.1145\/3325730.3325741","10.1145\/3325730"],"URL":"https:\/\/doi.org\/10.1145\/3325730.3325741","relation":{},"subject":[],"published":{"date-parts":[[2019,4,12]]},"assertion":[{"value":"2019-04-12","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}