{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:28:09Z","timestamp":1750220889656,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":24,"publisher":"ACM","license":[{"start":{"date-parts":[[2019,9,27]],"date-time":"2019-09-27T00:00:00Z","timestamp":1569542400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"funder":[{"name":"Directorate of Research and Community Engagement (DRPM), Universitas Indonesia","award":["NKB-0073\/UN2.R3.1\/HKP.05.00\/2019"],"award-info":[{"award-number":["NKB-0073\/UN2.R3.1\/HKP.05.00\/2019"]}]}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2019,9,27]]},"DOI":"10.1145\/3364335.3364342","type":"proceedings-article","created":{"date-parts":[[2019,11,21]],"date-time":"2019-11-21T13:35:31Z","timestamp":1574343331000},"page":"148-152","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Development of Performance Measurement Model using Balance Scorecard Method and Analytic Network Process in Construction Consultant Services Industry"],"prefix":"10.1145","author":[{"given":"Romadhani","family":"Ardi","sequence":"first","affiliation":[{"name":"Departement of Industrial Engineering, Universitas, Indonesia, Depok, Indonesia"}]},{"given":"Zulkarnain","family":"Zulkarnain","sequence":"additional","affiliation":[{"name":"Departement of Industrial Engineering, Universitas, Indonesia, Depok, Indonesia"}]},{"given":"Budi","family":"Sudarwanto","sequence":"additional","affiliation":[{"name":"Departement of Industrial Engineering, Universitas, Indonesia, Depok, Indonesia"}]},{"given":"Laksmi","family":"Ambarwati","sequence":"additional","affiliation":[{"name":"Departement of Industrial Engineering, Universitas, Indonesia, Depok, Indonesia"}]}],"member":"320","published-online":{"date-parts":[[2019,9,27]]},"reference":[{"key":"e_1_3_2_1_1_1","unstructured":"Minidstry of Public Works. 2014. Buku Informasi Statistik: Infrastruktur Pekerjaan Umum (Statistic Information Book: Public Works Infrastructure).  Minidstry of Public Works. 2014. Buku Informasi Statistik: Infrastruktur Pekerjaan Umum (Statistic Information Book: Public Works Infrastructure)."},{"key":"e_1_3_2_1_2_1","unstructured":"Ministry of Public Works. 2015. Peran Jasa Konsultan dalam Pekerjaan Konstruksi Terintegrasi Design and Build dan PBC (The Role of Consultant Services in Integrated Design and Build and PBC Construction Works). Retrieved from link: https:\/\/www.pu.go.id\/berita\/view\/9270\/peran-jasa-konsultan-dalam-pekerjaan-konstruksi-terintegrasi-design-and-build-dan-pbc  Ministry of Public Works. 2015. Peran Jasa Konsultan dalam Pekerjaan Konstruksi Terintegrasi Design and Build dan PBC (The Role of Consultant Services in Integrated Design and Build and PBC Construction Works). Retrieved from link: https:\/\/www.pu.go.id\/berita\/view\/9270\/peran-jasa-konsultan-dalam-pekerjaan-konstruksi-terintegrasi-design-and-build-dan-pbc"},{"key":"e_1_3_2_1_3_1","unstructured":"Government of Indonesia. 2017. Law of Indonesian Republic No. 2: Construction Services  Government of Indonesia. 2017. Law of Indonesian Republic No. 2: Construction Services"},{"issue":"6","key":"e_1_3_2_1_4_1","first-page":"256","article-title":"Performance of consultants on government projects in ghana: Client and contractor pespective","volume":"2","author":"Dadzie J.","year":"2012","journal-title":"International Journal of Business and Social Research"},{"key":"e_1_3_2_1_5_1","doi-asserted-by":"publisher","DOI":"10.1108\/09699980510627135"},{"key":"e_1_3_2_1_6_1","doi-asserted-by":"publisher","DOI":"10.1108\/00251740010311807"},{"key":"e_1_3_2_1_7_1","doi-asserted-by":"crossref","unstructured":"Amaratunga D. Baldry D. & Sarshar M. 2001. Process improvement through performance measurement: the balanced scorecard methodology. Work study 50(5) 179--189.  Amaratunga D. Baldry D. & Sarshar M. 2001. Process improvement through performance measurement: the balanced scorecard methodology. Work study 50(5) 179--189.","DOI":"10.1108\/EUM0000000005677"},{"key":"e_1_3_2_1_8_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2013.04.017"},{"key":"e_1_3_2_1_9_1","unstructured":"Kaplan R. S. & Norton D. P. 1992. The balanced scorecard: measures that drive performance.  Kaplan R. S. & Norton D. P. 1992. The balanced scorecard: measures that drive performance."},{"key":"e_1_3_2_1_10_1","unstructured":"Cobbold I. & Lawrie G. 2002. The development of the balanced scorecard as a strategic management tool. Performance measurement association.  Cobbold I. & Lawrie G. 2002. The development of the balanced scorecard as a strategic management tool. Performance measurement association."},{"key":"e_1_3_2_1_11_1","unstructured":"Neely A. D. Adams C. & Kennerley M. 2002. The performance prism: The scorecard for measuring and managing business success. London: Prentice Hall Financial Times.  Neely A. D. Adams C. & Kennerley M. 2002. The performance prism: The scorecard for measuring and managing business success. London: Prentice Hall Financial Times."},{"key":"e_1_3_2_1_12_1","doi-asserted-by":"crossref","unstructured":"Bititci U. S. Carrie A. S. & McDevitt L. 1997. Integrated performance measurement systems: a development guide. International journal of operations & production management 17(5) 522--534.  Bititci U. S. Carrie A. S. & McDevitt L. 1997. Integrated performance measurement systems: a development guide. International journal of operations & production management 17(5) 522--534.","DOI":"10.1108\/01443579710167230"},{"key":"e_1_3_2_1_13_1","doi-asserted-by":"publisher","DOI":"10.1108\/00251740010311807"},{"key":"e_1_3_2_1_14_1","doi-asserted-by":"publisher","DOI":"10.1108\/13683041011027418"},{"key":"e_1_3_2_1_15_1","doi-asserted-by":"publisher","DOI":"10.2308\/jmar.2000.12.1.1"},{"key":"e_1_3_2_1_16_1","doi-asserted-by":"publisher","DOI":"10.2308\/jmar.2001.13.1.47"},{"key":"e_1_3_2_1_17_1","unstructured":"Simons R. Russ-Eft D. Preskill H. Tejada R. A. Delgado Negrini S. Montero Corrales M. ... & Rom\u00e1n I. 2000. Performance measurement and control systems for implementing strategy (No. D10-276). IICA Tegucigalpa (Honduras) Instituto Nacional Agrario Tegucigalpa (Honduras) Federaci\u00f3n de Organizaciones Privadas de Desarrollo de Honduras Tegucigalpa (Honduras) Secretaria de Recursos Naturales Tegucigalpa (Honduras).  Simons R. Russ-Eft D. Preskill H. Tejada R. A. Delgado Negrini S. Montero Corrales M. ... & Rom\u00e1n I. 2000. Performance measurement and control systems for implementing strategy (No. D10-276). IICA Tegucigalpa (Honduras) Instituto Nacional Agrario Tegucigalpa (Honduras) Federaci\u00f3n de Organizaciones Privadas de Desarrollo de Honduras Tegucigalpa (Honduras) Secretaria de Recursos Naturales Tegucigalpa (Honduras)."},{"key":"e_1_3_2_1_18_1","unstructured":"Kairu E. W. 2013. Effects of balanced Scorecard On Performance of Firms In The Service Sector.  Kairu E. W. 2013. Effects of balanced Scorecard On Performance of Firms In The Service Sector."},{"key":"e_1_3_2_1_19_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijhm.2015.09.004"},{"key":"e_1_3_2_1_20_1","unstructured":"Young S. M. Atkinson A. A. & Kaplan R. S. (1998). Management accounting. Prentice Hall New Jersey.  Young S. M. Atkinson A. A. & Kaplan R. S. (1998). Management accounting. Prentice Hall New Jersey."},{"key":"e_1_3_2_1_21_1","doi-asserted-by":"crossref","unstructured":"Saaty T. L. 2008. Decision making with the analytic hierarchy process. International journal of services sciences 1(1) 83--98.  Saaty T. L. 2008. Decision making with the analytic hierarchy process. International journal of services sciences 1(1) 83--98.","DOI":"10.1504\/IJSSCI.2008.017590"},{"key":"e_1_3_2_1_22_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2013.04.017"},{"key":"e_1_3_2_1_23_1","unstructured":"Herlina Santosa B. Ciptomulyono U. 2014. Pemodelan Prediksi Financial Distress Menggunakan Metode Support Vector Machine. Prosiding Seminar Nasional Manajemen Teknologi XXI Program Studi MMT-ITS.  Herlina Santosa B. Ciptomulyono U. 2014. Pemodelan Prediksi Financial Distress Menggunakan Metode Support Vector Machine. Prosiding Seminar Nasional Manajemen Teknologi XXI Program Studi MMT-ITS."},{"key":"e_1_3_2_1_24_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2014.08.029"}],"event":{"name":"ICIBE 2019: 2019 The 5th International Conference on Industrial and Business Engineering","sponsor":["The Hong Kong Polytechnic The Hong Kong Polytechnic University"],"location":"Hong Kong Hong Kong","acronym":"ICIBE 2019"},"container-title":["Proceedings of the 2019 5th International Conference on Industrial and Business Engineering"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3364335.3364342","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3364335.3364342","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T23:44:27Z","timestamp":1750203867000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3364335.3364342"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,9,27]]},"references-count":24,"alternative-id":["10.1145\/3364335.3364342","10.1145\/3364335"],"URL":"https:\/\/doi.org\/10.1145\/3364335.3364342","relation":{},"subject":[],"published":{"date-parts":[[2019,9,27]]},"assertion":[{"value":"2019-09-27","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}