{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,4]],"date-time":"2025-11-04T10:46:33Z","timestamp":1762253193315,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":11,"publisher":"ACM","license":[{"start":{"date-parts":[[2019,9,27]],"date-time":"2019-09-27T00:00:00Z","timestamp":1569542400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2019,9,27]]},"DOI":"10.1145\/3364335.3364383","type":"proceedings-article","created":{"date-parts":[[2019,11,21]],"date-time":"2019-11-21T13:35:31Z","timestamp":1574343331000},"page":"261-265","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":9,"title":["Process Optimization Using Lean Manufacturing to Reduce Downtime"],"prefix":"10.1145","author":[{"given":"Francisco","family":"Henr\u00edquez-Alvarado","sequence":"first","affiliation":[{"name":"Ingenier\u00eda Industrial, Universidad Peruana de Ciencias Aplicadas (UPC), Lima, Peru"}]},{"given":"Victor","family":"Luque-Ojeda","sequence":"additional","affiliation":[{"name":"Ingenier\u00eda Industrial, Universidad Peruana de Ciencias Aplicadas (UPC), Lima, Peru"}]},{"given":"Iliana","family":"Macassi-Jauregui","sequence":"additional","affiliation":[{"name":"Ingenier\u00eda Industrial, Universidad Peruana de Ciencias Aplicadas (UPC), Lima, Peru"}]},{"given":"Jose Maria","family":"Alvarez","sequence":"additional","affiliation":[{"name":"Department of Computer Science and Engineering, Universidad Carlos III, Madrid, Spain"}]},{"given":"Carlos","family":"Raymundo-Iba\u00f1ez","sequence":"additional","affiliation":[{"name":"Direcci\u00f3n de Investigaci\u00f3n, Universidad Peruana de Ciencias Aplicadas (UPC), Lima, Peru"}]}],"member":"320","published-online":{"date-parts":[[2019,9,27]]},"reference":[{"key":"e_1_3_2_1_1_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJPPM-06-2017-0149"},{"key":"e_1_3_2_1_2_1","first-page":"694","volume-title":"Case study: Optimization of end-of-line packaging in fishery industry,\" in SII 2016-2016 IEEE\/SICE International Symposium on System Integration","author":"Kerezovic T.","year":"2017","unstructured":"T. Kerezovic and G. Sziebig , \" Case study: Optimization of end-of-line packaging in fishery industry,\" in SII 2016-2016 IEEE\/SICE International Symposium on System Integration , 2017 , pp. 694 -- 699 . T. Kerezovic and G. Sziebig, \"Case study: Optimization of end-of-line packaging in fishery industry,\" in SII 2016-2016 IEEE\/SICE International Symposium on System Integration, 2017, pp. 694--699."},{"key":"e_1_3_2_1_3_1","unstructured":"R. Pereira R. Cardoso I. Pedrosa and P. Gomes \"Gest\u00e3o de Risco na Rece\u00e7\u00e3o de Mercadorias e a otimiza\u00e7\u00e3o do Sistema ERP-Estudo caso de uma PME do setor autom\u00f3vel Risk Management in the Reception of Goods and optimization of the ERP System-Case study of SMEs in the car sector.\"  R. Pereira R. Cardoso I. Pedrosa and P. Gomes \"Gest\u00e3o de Risco na Rece\u00e7\u00e3o de Mercadorias e a otimiza\u00e7\u00e3o do Sistema ERP-Estudo caso de uma PME do setor autom\u00f3vel Risk Management in the Reception of Goods and optimization of the ERP System-Case study of SMEs in the car sector.\""},{"key":"e_1_3_2_1_4_1","volume-title":"Proceeding","author":"Samanta S.","year":"2015","unstructured":"Onkar, S. Samanta , and D. Philip , \" Material Optimization and process improvement using simulation for makeshift auto chassis manufacturing of an Indian SME,\" in IEOM 2015 5th International Conference on Industrial Engineering and Operations Management , Proceeding , 2015 . Onkar, S. Samanta, and D. Philip, \"Material Optimization and process improvement using simulation for makeshift auto chassis manufacturing of an Indian SME,\" in IEOM 2015 5th International Conference on Industrial Engineering and Operations Management, Proceeding, 2015."},{"key":"e_1_3_2_1_5_1","unstructured":"M. Noman T. Tahir and G. Rasool \"A Systematic Mapping Study on Success Factors of Implementing Measurement Processes in SMEs.\"  M. Noman T. Tahir and G. Rasool \"A Systematic Mapping Study on Success Factors of Implementing Measurement Processes in SMEs.\""},{"key":"e_1_3_2_1_6_1","volume-title":"Proceeding","author":"Ebrahim Z.","year":"2015","unstructured":"Z. Ebrahim , M. R. Muhamad , and P. D. Truong , \" Fit manufacturing: Production Waste Index and its effect on Production Profitability,\" in IEOM 2015 5th International Conference on Industrial Engineering and Operations Management , Proceeding , 2015 . Z. Ebrahim, M. R. Muhamad, and P. D. Truong, \"Fit manufacturing: Production Waste Index and its effect on Production Profitability,\" in IEOM 2015 5th International Conference on Industrial Engineering and Operations Management, Proceeding, 2015."},{"key":"e_1_3_2_1_7_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-030-20444-0_39"},{"key":"e_1_3_2_1_8_1","first-page":"71","volume-title":"ICIEA 2017","author":"Amrina E.","year":"2017","unstructured":"E. Amrina and A. A. A. Lubis , \"Minimizing waste using lean manufacturing: A case in cement production,\" in 2017 4th International Conference on Industrial Engineering and Applications , ICIEA 2017 , 2017 , pp. 71 -- 75 . E. Amrina and A. A. A. Lubis, \"Minimizing waste using lean manufacturing: A case in cement production,\" in 2017 4th International Conference on Industrial Engineering and Applications, ICIEA 2017, 2017, pp. 71--75."},{"key":"e_1_3_2_1_9_1","volume-title":"POMS 2018","author":"Haresankar J.","year":"2019","unstructured":"J. Haresankar , U. I. K. Galappaththi , and R. L. Perera , \" Factors Affecting the Sustainability of SME Industries: A Case Study in the Southern Province of Sri Lanka,\" in 2018 International Conference on Production and Operations Management Society , POMS 2018 , 2019 . J. Haresankar, U. I. K. Galappaththi, and R. L. Perera, \"Factors Affecting the Sustainability of SME Industries: A Case Study in the Southern Province of Sri Lanka,\" in 2018 International Conference on Production and Operations Management Society, POMS 2018, 2019."},{"key":"e_1_3_2_1_10_1","doi-asserted-by":"publisher","DOI":"10.1108\/AA-05-2014-035"},{"key":"e_1_3_2_1_11_1","doi-asserted-by":"publisher","DOI":"10.1108\/97279810880001268"}],"event":{"name":"ICIBE 2019: 2019 The 5th International Conference on Industrial and Business Engineering","sponsor":["The Hong Kong Polytechnic The Hong Kong Polytechnic University"],"location":"Hong Kong Hong Kong","acronym":"ICIBE 2019"},"container-title":["Proceedings of the 2019 5th International Conference on Industrial and Business Engineering"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3364335.3364383","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3364335.3364383","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T23:23:29Z","timestamp":1750202609000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3364335.3364383"}},"subtitle":["Case Study of A Manufacturing SME in Peru"],"short-title":[],"issued":{"date-parts":[[2019,9,27]]},"references-count":11,"alternative-id":["10.1145\/3364335.3364383","10.1145\/3364335"],"URL":"https:\/\/doi.org\/10.1145\/3364335.3364383","relation":{},"subject":[],"published":{"date-parts":[[2019,9,27]]},"assertion":[{"value":"2019-09-27","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}