{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:25:09Z","timestamp":1750220709601,"version":"3.41.0"},"reference-count":14,"publisher":"Association for Computing Machinery (ACM)","issue":"2","license":[{"start":{"date-parts":[[2019,12,4]],"date-time":"2019-12-04T00:00:00Z","timestamp":1575417600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":["SIGMETRICS Perform. Eval. Rev."],"published-print":{"date-parts":[[2019,12,4]]},"abstract":"<jats:p>We consider the problem of preemptively scheduling jobs to minimize mean response time of an M\/G\/1 queue. When the scheduler knows each job's size, the shortest remaining processing time (SRPT) policy is optimal. Unfortunately, in many settings we do not have access to each job's size. Instead, we know only the job size distribution. In this setting, the Gittins policy is known to minimize mean response time, but its complex priority structure can be computationally intractable. A much simpler alternative to Gittins is the shortest expected remaining processing time (SERPT) policy. While SERPT is a natural extension of SRPT to unknown job sizes, it is unknown how close SERPT is to optimal.<\/jats:p>","DOI":"10.1145\/3374888.3374898","type":"journal-article","created":{"date-parts":[[2019,12,5]],"date-time":"2019-12-05T14:07:24Z","timestamp":1575554844000},"page":"24-26","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":1,"title":["Simple Near-Optimal Scheduling for the M\/G\/1"],"prefix":"10.1145","volume":"47","author":[{"given":"Ziv","family":"Scully","sequence":"first","affiliation":[{"name":"Carnegie Mellon University, Pittsburgh, PA, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mor","family":"Harchol-Balter","sequence":"additional","affiliation":[{"name":"Carnegie Mellon University, Pittsburgh, PA, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Alan","family":"Scheller-Wolf","sequence":"additional","affiliation":[{"name":"Carnegie Mellon University, Pittsburgh, PA, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2019,12,4]]},"reference":[{"key":"e_1_2_1_1_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11134-009-9141-x"},{"key":"e_1_2_1_2_1","doi-asserted-by":"publisher","DOI":"10.1287\/moor.2017.0890"},{"key":"e_1_2_1_3_1","volume-title":"Nonclairvoyant scheduling to minimize the total flow time on single and parallel machines. Journal of the ACM (JACM), 51(4):517--539","author":"Becchetti L.","year":"2004","unstructured":"L. Becchetti and S. Leonardi . Nonclairvoyant scheduling to minimize the total flow time on single and parallel machines. Journal of the ACM (JACM), 51(4):517--539 , 2004 . L. Becchetti and S. Leonardi. Nonclairvoyant scheduling to minimize the total flow time on single and parallel machines. Journal of the ACM (JACM), 51(4):517--539, 2004."},{"key":"e_1_2_1_4_1","doi-asserted-by":"publisher","DOI":"10.1145\/959143.959165"},{"key":"e_1_2_1_5_1","doi-asserted-by":"publisher","DOI":"10.1002\/9780470980033"},{"key":"e_1_2_1_6_1","doi-asserted-by":"publisher","DOI":"10.1109\/SFCS.1997.646123"},{"key":"e_1_2_1_7_1","volume-title":"Heavy-traffic analysis of sojourn time under the foreground-background scheduling policy. arXiv preprint arXiv:1712.03853","author":"Kamphorst B.","year":"2017","unstructured":"B. Kamphorst and B. Zwart . Heavy-traffic analysis of sojourn time under the foreground-background scheduling policy. arXiv preprint arXiv:1712.03853 , 2017 . B. Kamphorst and B. Zwart. Heavy-traffic analysis of sojourn time under the foreground-background scheduling policy. arXiv preprint arXiv:1712.03853, 2017."},{"key":"e_1_2_1_8_1","doi-asserted-by":"publisher","DOI":"10.1016\/0304-3975(94)90151-1"},{"key":"e_1_2_1_9_1","doi-asserted-by":"publisher","DOI":"10.1017\/S0269964800001194"},{"key":"e_1_2_1_10_1","doi-asserted-by":"publisher","DOI":"10.2307\/3214660"},{"key":"e_1_2_1_11_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.16.3.687"},{"key":"e_1_2_1_12_1","doi-asserted-by":"publisher","DOI":"10.1145\/3179419"},{"key":"e_1_2_1_13_1","volume-title":"Simple near-optimal scheduling for the M\/G\/1. arXiv preprint arXiv:1907.10792","author":"Scully Z.","year":"2019","unstructured":"Z. Scully , M. Harchol-Balter , and A. Scheller-Wolf . Simple near-optimal scheduling for the M\/G\/1. arXiv preprint arXiv:1907.10792 , 2019 . Z. Scully, M. Harchol-Balter, and A. Scheller-Wolf. Simple near-optimal scheduling for the M\/G\/1. arXiv preprint arXiv:1907.10792, 2019."},{"key":"e_1_2_1_14_1","doi-asserted-by":"publisher","DOI":"10.1145\/1071690.1064236"}],"container-title":["ACM SIGMETRICS Performance Evaluation Review"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3374888.3374898","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3374888.3374898","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T22:33:08Z","timestamp":1750199588000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3374888.3374898"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,12,4]]},"references-count":14,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2019,12,4]]}},"alternative-id":["10.1145\/3374888.3374898"],"URL":"https:\/\/doi.org\/10.1145\/3374888.3374898","relation":{},"ISSN":["0163-5999"],"issn-type":[{"type":"print","value":"0163-5999"}],"subject":[],"published":{"date-parts":[[2019,12,4]]},"assertion":[{"value":"2019-12-04","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}