{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:23:00Z","timestamp":1750220580422,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":12,"publisher":"ACM","license":[{"start":{"date-parts":[[2020,1,17]],"date-time":"2020-01-17T00:00:00Z","timestamp":1579219200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"funder":[{"name":"Jiangsu Government Scholarship for Overseas Studies Program"},{"name":"Jiangsu Province ?Double-Creation Project? Program","award":["FZ20180090"],"award-info":[{"award-number":["FZ20180090"]}]}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2020,1,17]]},"DOI":"10.1145\/3380625.3380627","type":"proceedings-article","created":{"date-parts":[[2020,5,25]],"date-time":"2020-05-25T18:33:06Z","timestamp":1590431586000},"page":"265-270","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":1,"title":["Reliability Analysis of Non-repairable Phased-mission System by Proposed Sequence-enforcing Fault Tree Combined with Monte Carlo Simulation"],"prefix":"10.1145","author":[{"given":"Chenxi","family":"Liu","sequence":"first","affiliation":[{"name":"School of Mechanical Engineering, Jiangsu University, Zhenjiang, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jianzhong","family":"Zhou","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering, Jiangsu University, Zhenjiang, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hongyu","family":"Wang","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering, Jiangsu University, Zhenjiang, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2020,5,19]]},"reference":[{"key":"e_1_3_2_1_1_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2018.03.008"},{"key":"e_1_3_2_1_2_1","first-page":"1375","volume-title":"Dec. 4-7","author":"Mu H. N.","year":"2016","unstructured":"H. N. Mu , J. W. Liu , M. C. Lu , J. F. Chen , and X. J. Yi , \" Reliability analysis method of Phased-Mission Nuclear Power Equipment based on goal oriented methodology,\" in Proc. of the int. Con. on Industrial Engineering and Engineering Management (IEEM) , Dec. 4-7 , 2016 , Bali , Indonesia , pp. 1375 -- 1379 73. H. N. Mu, J. W. Liu, M. C. Lu, J. F. Chen, and X. J. Yi, \"Reliability analysis method of Phased-Mission Nuclear Power Equipment based on goal oriented methodology,\" in Proc. of the int. Con. on Industrial Engineering and Engineering Management (IEEM), Dec. 4-7, 2016, Bali, Indonesia, pp. 1375--1379 73."},{"key":"e_1_3_2_1_3_1","doi-asserted-by":"publisher","DOI":"10.1177\/1748006X18757074"},{"key":"e_1_3_2_1_4_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2018.08.002"},{"key":"e_1_3_2_1_5_1","doi-asserted-by":"publisher","DOI":"10.1109\/TR.2014.2299497"},{"key":"e_1_3_2_1_6_1","doi-asserted-by":"publisher","DOI":"10.1109\/TR.2006.874941"},{"key":"e_1_3_2_1_7_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2017.02.006"},{"key":"e_1_3_2_1_8_1","doi-asserted-by":"publisher","DOI":"10.1109\/TR.2006.890900"},{"key":"e_1_3_2_1_9_1","doi-asserted-by":"publisher","DOI":"10.1109\/24.159800"},{"key":"e_1_3_2_1_10_1","doi-asserted-by":"publisher","DOI":"10.1002\/qre.1728"},{"key":"e_1_3_2_1_11_1","doi-asserted-by":"publisher","DOI":"10.1177\/1748006X15582129"},{"key":"e_1_3_2_1_12_1","doi-asserted-by":"publisher","DOI":"10.1051\/jnwpu\/20183650995"}],"event":{"name":"ICMSS 2020: 2020 4th International Conference on Management Engineering, Software Engineering and Service Sciences","sponsor":["China University of Geosciences"],"location":"Wuhan China","acronym":"ICMSS 2020"},"container-title":["Proceedings of the 2020 4th International Conference on Management Engineering, Software Engineering and Service Sciences"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3380625.3380627","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3380625.3380627","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T21:31:32Z","timestamp":1750195892000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3380625.3380627"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,1,17]]},"references-count":12,"alternative-id":["10.1145\/3380625.3380627","10.1145\/3380625"],"URL":"https:\/\/doi.org\/10.1145\/3380625.3380627","relation":{},"subject":[],"published":{"date-parts":[[2020,1,17]]},"assertion":[{"value":"2020-05-19","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}