{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:25:18Z","timestamp":1750220718291,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":9,"publisher":"ACM","license":[{"start":{"date-parts":[[2020,3,13]],"date-time":"2020-03-13T00:00:00Z","timestamp":1584057600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2020,3,13]]},"DOI":"10.1145\/3386762.3386771","type":"proceedings-article","created":{"date-parts":[[2020,5,30]],"date-time":"2020-05-30T04:36:58Z","timestamp":1590813418000},"page":"27-31","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Analysis of Fuzzy Comprehensive Evaluation of Punched Pile Foundation Detection in Karst Area"],"prefix":"10.1145","author":[{"given":"Liu","family":"Yuancheng","sequence":"first","affiliation":[{"name":"Southwest Jiaotong University, Chengdu, Sichuan, China"}]},{"given":"Deng","family":"Ronggui","sequence":"additional","affiliation":[{"name":"Southwest Jiaotong University, Chengdu, Sichuan, China"}]},{"given":"Yang","family":"Ming","sequence":"additional","affiliation":[{"name":"Southwest Jiaotong University, Chengdu, Sichuan, China"}]},{"given":"Liu","family":"Yugang","sequence":"additional","affiliation":[{"name":"Southwest Jiaotong University, Chengdu, Sichuan, China"}]}],"member":"320","published-online":{"date-parts":[[2020,5,29]]},"reference":[{"key":"e_1_3_2_1_1_1","volume-title":"Risk Assessment of Bored Pile Collapse Based on Fuzzy Theory[J]","author":"Feng M Y","year":"2017","unstructured":"Feng M Y , Heng Z D , Ling L F , Risk Assessment of Bored Pile Collapse Based on Fuzzy Theory[J] . Journal of Anhui University of Science and Technology(Natural Science) , 2017 . Feng M Y, Heng Z D, Ling L F, et al. Risk Assessment of Bored Pile Collapse Based on Fuzzy Theory[J]. Journal of Anhui University of Science and Technology(Natural Science), 2017."},{"key":"e_1_3_2_1_2_1","volume-title":"Science Technology and Engineering","author":"Ziping W","year":"2006","unstructured":"Ziping W , Jianzu G U , Ying L , Fuzzy Evaluation on Quality of Concrete Filling Pile[J] . Science Technology and Engineering , 2006 . Ziping W, Jianzu G U, Ying L, et al. Fuzzy Evaluation on Quality of Concrete Filling Pile[J]. Science Technology and Engineering, 2006."},{"key":"e_1_3_2_1_3_1","volume-title":"Sichuan Building Materials","author":"Feng Fan","year":"2017","unstructured":"Feng Fan , Li Nan. Construction Risk Evaluation of Bored Piles Based on Fuzzy Mathematics [J] . Sichuan Building Materials , 2017 (6). Feng Fan, Li Nan. Construction Risk Evaluation of Bored Piles Based on Fuzzy Mathematics [J]. Sichuan Building Materials, 2017 (6)."},{"key":"e_1_3_2_1_4_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jlp.2014.08.002"},{"key":"e_1_3_2_1_5_1","volume-title":"Research on fuzzy comprehensive evaluation method of pile foundation[J]","author":"Yun Y U","year":"2002","unstructured":"Yun yan Y U , Chen R P , Chen Y M , Research on fuzzy comprehensive evaluation method of pile foundation[J] . 2002 , 15(2):68--71. Yun yan Y U, Chen R P, Chen Y M, et al. Research on fuzzy comprehensive evaluation method of pile foundation[J]. 2002, 15(2):68--71."},{"issue":"2","key":"e_1_3_2_1_6_1","first-page":"252","article-title":"Application of fuzzy analytic hierarchy process model on determination of optimized pile-type[J]","volume":"4","author":"Lei MA","year":"2010","unstructured":"Lei MA , Shuilong SHEN , Jinhui ZHANG . Application of fuzzy analytic hierarchy process model on determination of optimized pile-type[J] . Frontiers of Structural and Civil Engineering , 2010 , 4 ( 2 ): 252 -- 257 . Lei MA, Shuilong SHEN, Jinhui ZHANG. Application of fuzzy analytic hierarchy process model on determination of optimized pile-type[J]. Frontiers of Structural and Civil Engineering, 2010, 4(2):252--257.","journal-title":"Frontiers of Structural and Civil Engineering"},{"key":"e_1_3_2_1_7_1","unstructured":"Zhang P Shen X Jiang S. Variable fuzzy set model for evaluation of intergrity of pile foundation based on SPA[C]\/\/2011.  Zhang P Shen X Jiang S. Variable fuzzy set model for evaluation of intergrity of pile foundation based on SPA[C]\/\/2011."},{"key":"e_1_3_2_1_8_1","volume-title":"Rock & Soil Mechanics","author":"Yang H.-Z. Xu.","year":"2006","unstructured":"L. Yang , H.-Z. Xu. Predicting model of vertical ultimate bearing capacity of single pile using adaptive neuro-fuzzy inference system[J] . Rock & Soil Mechanics , 2006 . L. Yang, H.-Z. Xu. Predicting model of vertical ultimate bearing capacity of single pile using adaptive neuro-fuzzy inference system[J]. Rock & Soil Mechanics, 2006."},{"key":"e_1_3_2_1_9_1","doi-asserted-by":"crossref","unstructured":"Wen-gui Cao Yong-jie Zhang Ming-hua Zhao. Non-probabilistic fuzzy reliability analysis of pile foundation stability by interval theory[J]. 14(6):864--869.  Wen-gui Cao Yong-jie Zhang Ming-hua Zhao. Non-probabilistic fuzzy reliability analysis of pile foundation stability by interval theory[J]. 14(6):864--869.","DOI":"10.1007\/s11771-007-0164-3"}],"event":{"name":"IEEA 2020: 2020 The 9th International Conference on Informatics, Environment, Energy and Applications","acronym":"IEEA 2020","location":"Amsterdam Netherlands"},"container-title":["Proceedings of the 2020 The 9th International Conference on Informatics, Environment, Energy and Applications"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3386762.3386771","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3386762.3386771","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T22:33:25Z","timestamp":1750199605000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3386762.3386771"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,3,13]]},"references-count":9,"alternative-id":["10.1145\/3386762.3386771","10.1145\/3386762"],"URL":"https:\/\/doi.org\/10.1145\/3386762.3386771","relation":{},"subject":[],"published":{"date-parts":[[2020,3,13]]},"assertion":[{"value":"2020-05-29","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}