{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,25]],"date-time":"2026-03-25T17:19:26Z","timestamp":1774459166141,"version":"3.50.1"},"publisher-location":"New York, NY, USA","reference-count":19,"publisher":"ACM","license":[{"start":{"date-parts":[[2020,6,16]],"date-time":"2020-06-16T00:00:00Z","timestamp":1592265600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2020,6,16]]},"DOI":"10.1145\/3400934.3400968","type":"proceedings-article","created":{"date-parts":[[2020,8,25]],"date-time":"2020-08-25T14:54:42Z","timestamp":1598367282000},"page":"180-186","source":"Crossref","is-referenced-by-count":4,"title":["Green Warehouse Performance Measurement Model for 3PL Warehousing"],"prefix":"10.1145","author":[{"given":"Whendy","family":"Margareta","sequence":"first","affiliation":[{"name":"School of Industrial and System Engineering, Telkom University, Bandung, Indonesia"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ari Yanuar","family":"Ridwan","sequence":"additional","affiliation":[{"name":"School of Industrial and System Engineering, Telkom University, Bandung, Indonesia"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Prafajar Suksessanno","family":"Muttaqin","sequence":"additional","affiliation":[{"name":"School of Industrial and System Engineering, Telkom University, Bandung, Indonesia"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2020,8,25]]},"reference":[{"key":"e_1_3_2_1_1_1","first-page":"1","article-title":"Environmentally Sustainable Logistics Performance Management Process Integration between Buyers and","volume":"11","author":"Isaksson M. P.","journal-title":"Sustainability"},{"key":"e_1_3_2_1_2_1","unstructured":"S. Chopra Supply Chain Management Sixth Edit. United States of America: Pearson 2016.  S. Chopra Supply Chain Management Sixth Edit. United States of America: Pearson 2016."},{"key":"e_1_3_2_1_3_1","unstructured":"Parji \"Model Peningkatan Kinerja Warehouse 5 Services And Warehousing (S&W)-Procurement Pt. Pertamina (Persero) Refinery Unit V Balikpapan \" Wareh. Perform. 2018.  Parji \"Model Peningkatan Kinerja Warehouse 5 Services And Warehousing (S&W)-Procurement Pt. Pertamina (Persero) Refinery Unit V Balikpapan \" Wareh. Perform. 2018."},{"key":"e_1_3_2_1_4_1","first-page":"105","article-title":"Pengukuran Kinerja Gudang Dengan Menggunakan Metode Balanced Scorecard - Studi Kasus Pada PT. GMS - Jakarta","volume":"15","author":"Chandra A.","year":"2014","journal-title":"J. Metris"},{"key":"e_1_3_2_1_5_1","volume-title":"Second Edi. New York: Congress Cataloging-in-Publication Data Names","author":"Frazelle E. H.","year":"2015"},{"key":"e_1_3_2_1_6_1","doi-asserted-by":"publisher","DOI":"10.1051\/matecconf\/201815401058"},{"key":"e_1_3_2_1_7_1","unstructured":"Republik Indonesia \"Undang-Undang Republik Indonesia No. 3 Tahun 2014 Tentang Perindustrian \" 2020. [Online]. Available: http:\/\/www.jdih.kemenkeu.go.id\/fullText\/2014\/3TAHUN2014UU.HTM.  Republik Indonesia \"Undang-Undang Republik Indonesia No. 3 Tahun 2014 Tentang Perindustrian \" 2020. [Online]. Available: http:\/\/www.jdih.kemenkeu.go.id\/fullText\/2014\/3TAHUN2014UU.HTM."},{"key":"e_1_3_2_1_8_1","unstructured":"Green Building Council Indonesia \"Greenship Homes Version 1.0 \" pp. 1--22 2014.  Green Building Council Indonesia \"Greenship Homes Version 1.0 \" pp. 1--22 2014."},{"key":"e_1_3_2_1_9_1","doi-asserted-by":"crossref","unstructured":"S. Rahayu A. Y. Ridwan and M. Saputra \"Designing Green Warehouse Systems Based on Enterprise Resource Planning for The Leather Tanning Industry \" pp. 1--6 2019.  S. Rahayu A. Y. Ridwan and M. Saputra \"Designing Green Warehouse Systems Based on Enterprise Resource Planning for The Leather Tanning Industry \" pp. 1--6 2019.","DOI":"10.1109\/ICEEI47359.2019.8988819"},{"issue":"11","key":"e_1_3_2_1_10_1","first-page":"1","article-title":"Evaluation Of Consumer Goods Warehouse's Performance With Supply Chain Operation Reference and Scoring System","volume":"3","author":"Rachmaniar D. N.","year":"2016","journal-title":"REKAYASA DAN Manaj. Sist. Ind."},{"key":"e_1_3_2_1_11_1","doi-asserted-by":"publisher","DOI":"10.3182\/20130619-3-RU-3018.00174"},{"key":"e_1_3_2_1_12_1","unstructured":"A. S. C. Council Supply Chain Operations Reference Model 11th ed. vol. 10 no. 2. 2012.  A. S. C. Council Supply Chain Operations Reference Model 11th ed. vol. 10 no. 2. 2012."},{"key":"e_1_3_2_1_13_1","volume-title":"Central Jakarta: PPM","author":"Paul J.","year":"2014"},{"issue":"3","key":"e_1_3_2_1_14_1","first-page":"215","article-title":"Analisis Produktivitas Menggunakan Metode Objective Matrix (OMAX): Studi Kasus Pada Bagian Produksi Sari Roti PT NIPPON INDOSARI CORPINDO, TBK Pasuruan","volume":"14","year":"2013","journal-title":"J. Teknol. Pertan. Anal. Produkt."},{"key":"e_1_3_2_1_15_1","unstructured":"B. Yosan Modul Elearning 13 Metode Omax. Jakarta: Universitas Mercubuana 2015.  B. Yosan Modul Elearning 13 Metode Omax. Jakarta: Universitas Mercubuana 2015."},{"key":"e_1_3_2_1_16_1","unstructured":"H. M. K. Ahmad Mubin \"Analysis Of Fish Processing Productivity Using Objective Matrix (OMAX) and Traffic Light System (TLS) Methods \" Malang 2019.  H. M. K. Ahmad Mubin \"Analysis Of Fish Processing Productivity Using Objective Matrix (OMAX) and Traffic Light System (TLS) Methods \" Malang 2019."},{"key":"e_1_3_2_1_17_1","unstructured":"N. K. Siregar \"Identification of Opportunities for Failure and Reliability by the FMEA RCA and RBD Methods and Analysis of the Effectiveness of OEE on Steam Turbines of PT. Perkebunan Nusantara IV Adolina \" North Sumatra 2018.  N. K. Siregar \"Identification of Opportunities for Failure and Reliability by the FMEA RCA and RBD Methods and Analysis of the Effectiveness of OEE on Steam Turbines of PT. Perkebunan Nusantara IV Adolina \" North Sumatra 2018."},{"key":"e_1_3_2_1_18_1","unstructured":"D. Darnotoputri D. Arleni and Pujotomo \"Analisis Produktivitas Pada Produksi Normal Noodle Menggunakan Metode Root Cause Analysis (RCA) \" 2017.  D. Darnotoputri D. Arleni and Pujotomo \"Analisis Produktivitas Pada Produksi Normal Noodle Menggunakan Metode Root Cause Analysis (RCA) \" 2017."},{"key":"e_1_3_2_1_19_1","volume-title":"Manag.","author":"Kou G.","year":"2013"}],"event":{"name":"APCORISE 2020: 3rd Asia Pacific Conference on Research in Industrial and Systems Engineering 2020","location":"Depok Indonesia","acronym":"APCORISE 2020"},"container-title":["Proceedings of the 3rd Asia Pacific Conference on Research in Industrial and Systems Engineering 2020"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3400934.3400968","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T22:41:18Z","timestamp":1750200078000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3400934.3400968"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,6,16]]},"references-count":19,"alternative-id":["10.1145\/3400934.3400968","10.1145\/3400934"],"URL":"https:\/\/doi.org\/10.1145\/3400934.3400968","relation":{},"subject":[],"published":{"date-parts":[[2020,6,16]]}}}