{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:20:50Z","timestamp":1750220450624,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":10,"publisher":"ACM","license":[{"start":{"date-parts":[[2021,1,28]],"date-time":"2021-01-28T00:00:00Z","timestamp":1611792000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2021,1,28]]},"DOI":"10.1145\/3448734.3450935","type":"proceedings-article","created":{"date-parts":[[2021,5,17]],"date-time":"2021-05-17T15:48:37Z","timestamp":1621266517000},"page":"1-5","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Quality Assessment of High-Voltage Transmission Lines Based on Multi-modal Data Fusion"],"prefix":"10.1145","author":[{"given":"Changqing","family":"Du","sequence":"first","affiliation":[{"name":"Power Engineering Consulting Co"}]},{"given":"Bing","family":"Chen","sequence":"additional","affiliation":[{"name":"Power Engineering Consulting Co"}]},{"given":"Yuezhong","family":"Yu","sequence":"additional","affiliation":[{"name":"Power Engineering Consulting Co"}]},{"given":"Mingze","family":"Sun","sequence":"additional","affiliation":[{"name":"Power Engineering Consulting Co"}]},{"given":"Xing","family":"Yuan","sequence":"additional","affiliation":[{"name":"Power Engineering Consulting Co"}]},{"given":"Zihan","family":"Wang","sequence":"additional","affiliation":[{"name":"Xi An Jiaotong University"}]},{"given":"Jinhang","family":"Zhong","sequence":"additional","affiliation":[{"name":"Xi An Jiaotong University"}]}],"member":"320","published-online":{"date-parts":[[2021,5,17]]},"reference":[{"key":"e_1_3_2_1_1_1","first-page":"124","article-title":"Explaining the Issues of the Completion and Acceptance of Transmission Line Projects and Reasonable Solutions","volume":"33","author":"Tao Long","year":"2017","journal-title":"China Venture Capital"},{"key":"e_1_3_2_1_2_1","first-page":"288","article-title":"The main content of the on-site inspection for the completion acceptance of the transmission line project and the key points of the measurement technology","volume":"8","author":"Hongnan Zhang","year":"2011","journal-title":"Time Report"},{"key":"e_1_3_2_1_3_1","first-page":"69","article-title":"Application of BIM Technology in 500 kV Substation Project","volume":"39","author":"Xin LU","year":"2020","journal-title":"Hongshui River"},{"key":"e_1_3_2_1_4_1","first-page":"105","article-title":"Design of overhead transmission lines based on digital three-dimensional model","volume":"57","author":"Lan Guan","year":"2020","journal-title":"Electrical Measurement and Instrumentation"},{"key":"e_1_3_2_1_5_1","first-page":"32","article-title":"Realization and Prospect of 3D Simulation Model of Substation Based on Point Cloud Data","volume":"41","author":"Xiaozhuang Tian","year":"2018","journal-title":"Sichuan Electric Power Technology"},{"key":"e_1_3_2_1_6_1","first-page":"44","article-title":"Design of night inspection system for overhead transmission Line based on laser point cloud technology","volume":"44","author":"Biao Zou","year":"2020","journal-title":"Information Technology"},{"key":"e_1_3_2_1_7_1","first-page":"2078","article-title":"Application of 3D Scanning Combined with BIM Technology to Building Structure Review","volume":"41","author":"Zhengli Chen","year":"2019","journal-title":"Building Construction"},{"key":"e_1_3_2_1_8_1","first-page":"119","article-title":"Engineering Quality Control of Bridge Steel Components Based on BIM+3D Laser Scanning Technology","volume":"36","author":"Yawei Qin","year":"2019","journal-title":"Journal of Civil Engineering and Management"},{"key":"e_1_3_2_1_9_1","first-page":"107","article-title":"Construction Progress Monitoring Based on the Integration of Indoor 3D Point Cloud and BIM","volume":"26","author":"Shasha Liu","year":"2019","journal-title":"Geomatics World"},{"key":"e_1_3_2_1_10_1","doi-asserted-by":"publisher","DOI":"10.1109\/34.121791"}],"event":{"name":"CONF-CDS 2021: The 2nd International Conference on Computing and Data Science","acronym":"CONF-CDS 2021","location":"Stanford CA USA"},"container-title":["The 2nd International Conference on Computing and Data Science"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3448734.3450935","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3448734.3450935","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T20:47:52Z","timestamp":1750193272000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3448734.3450935"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,1,28]]},"references-count":10,"alternative-id":["10.1145\/3448734.3450935","10.1145\/3448734"],"URL":"https:\/\/doi.org\/10.1145\/3448734.3450935","relation":{},"subject":[],"published":{"date-parts":[[2021,1,28]]},"assertion":[{"value":"2021-05-17","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}