{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:22:10Z","timestamp":1750220530552,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":33,"publisher":"ACM","license":[{"start":{"date-parts":[[2021,1,8]],"date-time":"2021-01-08T00:00:00Z","timestamp":1610064000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"funder":[{"name":"National Key R&D Program of China","award":["2016YFB1200602-02"],"award-info":[{"award-number":["2016YFB1200602-02"]}]},{"name":"Science Research Project of Shanghai Science and Technology Committee","award":["18DZ1205803"],"award-info":[{"award-number":["18DZ1205803"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021,1,8]]},"DOI":"10.1145\/3459012.3459036","type":"proceedings-article","created":{"date-parts":[[2021,7,24]],"date-time":"2021-07-24T22:06:47Z","timestamp":1627164407000},"page":"148-155","source":"Crossref","is-referenced-by-count":0,"title":["A Survey on Operating Scenarios of Rail Transits"],"prefix":"10.1145","author":[{"given":"Zhixiang","family":"Deng","sequence":"first","affiliation":[{"name":"China Railway Siyuan Survey and Design Group Co.,Ltd, China"}]},{"given":"Pengzi","family":"Chu","sequence":"additional","affiliation":[{"name":"Tongji University, China"}]},{"given":"Yi","family":"Yu","sequence":"additional","affiliation":[{"name":"Tongji University, China"}]},{"given":"Hui","family":"Lin","sequence":"additional","affiliation":[{"name":"Tongji University, China"}]},{"given":"Xi","family":"Jiang","sequence":"additional","affiliation":[{"name":"China Railway Siyuan Survey and Design Group Co.,Ltd., China"}]},{"given":"Danyang","family":"Dong","sequence":"additional","affiliation":[{"name":"Tongji University, China"}]}],"member":"320","published-online":{"date-parts":[[2021,7,24]]},"reference":[{"issue":"8","key":"e_1_3_2_1_1_1","first-page":"4","article-title":"Study and Application of UML Based CTCS-3 Operating scenarios Analysis Approach","volume":"46","author":"Zhao X.","year":"2010","journal-title":"Railway Signaling & Communication"},{"issue":"4","key":"e_1_3_2_1_2_1","first-page":"112","article-title":"Overview of Urban Rail Transport Full Automatic Operation System and Typical Scenario","volume":"48","author":"Tan W.","year":"2019","journal-title":"Electric Drive for Locomotives"},{"issue":"1","key":"e_1_3_2_1_3_1","first-page":"1","article-title":"Technology and application of fully automatic operation system for urban rail transit in China","volume":"43","author":"Ning B.","year":"2019","journal-title":"Journal of Beijing Jiaotong University"},{"issue":"2","key":"e_1_3_2_1_4_1","first-page":"204","article-title":"A Survey of Software Requirements Analysis","volume":"31","author":"Li C.","year":"2013","journal-title":"Journal of Hubei University for Nationalities (Natural Sciences Edition)"},{"volume-title":"Functional verification of train control system under complicated scenario. Master Thesis","author":"Ren P.","key":"e_1_3_2_1_5_1"},{"issue":"3","key":"e_1_3_2_1_6_1","first-page":"65","article-title":"Scheme of Equipment Test in Basic Condition Assessment of Transit Commissioning based on Scene","volume":"12","author":"Zhang L.","year":"2015","journal-title":"Modern Urban Transit"},{"issue":"4","key":"e_1_3_2_1_7_1","first-page":"14","article-title":"CTCS-3 Train Control System Joint Commissioning and Test of Zhengzhou-Xi'an Passenger Railway","volume":"8","author":"He C.","year":"2011","journal-title":"Railway Signalling & Communication Engineering"},{"volume-title":"CTCS-3 Train Control Simulation and Training System. Master Thesis","author":"Sha X.","key":"e_1_3_2_1_8_1"},{"issue":"2","key":"e_1_3_2_1_9_1","first-page":"1","article-title":"Technology and Application of Train Operation Control System for China Rail Transit System","volume":"39","author":"Ning B.","year":"2017","journal-title":"Journal of the China Railway Society"},{"volume-title":"Research on System-level Fault Diagnosis Based on High-speed Railway Operating scenarios. Master Thesis","author":"Liu Y.","key":"e_1_3_2_1_10_1"},{"volume-title":"Technology and Research of CTCS-2 Train Control System in Intercity Railway. Master Thesis","author":"Yang W.","key":"e_1_3_2_1_11_1"},{"issue":"5","key":"e_1_3_2_1_12_1","first-page":"5","article-title":"Function modeling analysis for on-board equipment ATP of CTCS-1 based on UML","volume":"26","author":"Zhang Z.","year":"2017","journal-title":"Railway Computer Application"},{"issue":"4","key":"e_1_3_2_1_13_1","first-page":"73","article-title":"Research on Fully Automatic Integrated Intelligent Operation System of Urban Rail Transit","volume":"56","author":"Yang Z.","year":"2020","journal-title":"Railway Signalling & Communication"},{"issue":"1","key":"e_1_3_2_1_14_1","first-page":"51","article-title":"Development Trend and Suggestion of Fully Automatic Operation System","volume":"31","author":"Gao C.","year":"2018","journal-title":"Urban Rapid Rail Transit"},{"issue":"5","key":"e_1_3_2_1_15_1","first-page":"22","article-title":"Analysis and discussion on the difference between FAO system and the traditional CBTC system of urban rail transit","volume":"17","author":"Wang X.","year":"2019","journal-title":"Railway Technical Innovation"},{"volume-title":"Operational safety analysis and train running simulation of Fully Automated Operation urban rail transit. Master Thesis","author":"Liu P.","key":"e_1_3_2_1_16_1"},{"issue":"12","key":"e_1_3_2_1_17_1","first-page":"61","article-title":"Research on adaptability of tram based on its service characteristics","volume":"16","author":"Li D.","year":"2019","journal-title":"Modern Urban Transit"},{"key":"e_1_3_2_1_18_1","first-page":"77","article-title":"Discussion on the key technology of modern tram signal system","author":"Lv H.","year":"2019","journal-title":". Mechanical and Electrical Information, (12)"},{"issue":"4","key":"e_1_3_2_1_19_1","first-page":"96","article-title":"TIDS and Its Application in Suzhou Tram Line 2","volume":"30","author":"Li S.","year":"2017","journal-title":"Urban Rapid Rail Transit"},{"issue":"7","key":"e_1_3_2_1_20_1","first-page":"23","article-title":"Research on TIAS System Design Scheme of Modern Tram","volume":"38","author":"Liu N.","year":"2019","journal-title":"Techniques of Automation and Applications"},{"volume-title":"Research and Implementation of Modern Tram Driving Simulation System. Master Thesis","author":"Ba J.","key":"e_1_3_2_1_21_1"},{"volume-title":"Simulation Research on the Vehicle Subsystem of City Tram. Master Thesis","author":"Xin F.","key":"e_1_3_2_1_22_1"},{"issue":"7","key":"e_1_3_2_1_23_1","first-page":"199","article-title":"Research on the Design of Urban Tram Signal Control System","volume":"23","author":"Qi Z.","year":"2020","journal-title":"Urban Mass Transit"},{"volume-title":"Design and implementation for the simulation system of modern tram operation control system. Master Thesis","author":"Ma L.","key":"e_1_3_2_1_24_1"},{"volume-title":"Maglev Train","year":"2013","author":"Wu X.","key":"e_1_3_2_1_25_1"},{"issue":"3","key":"e_1_3_2_1_26_1","first-page":"40","article-title":"Study on Key Technologies and Whole Speed Range Application of Maglev Rail Transport","volume":"41","author":"Xu F.","year":"2019","journal-title":"Journal of the China Railway Society"},{"issue":"3","key":"e_1_3_2_1_27_1","first-page":"74","article-title":"The test High-speed Maglev train rolled off the production line in Qingdao","volume":"48","author":"Zhu Y.","year":"2019","journal-title":"Electric Drive for Locomotives"},{"issue":"2","key":"e_1_3_2_1_28_1","first-page":"109","article-title":"Research on Development and Prospects of Maglev Transportation and Suggestions to China","volume":"41","author":"Sun Y.","year":"2019","journal-title":"World Sci-Tech R & D"},{"volume-title":"The Design and Verification of High-speed Maglev Train Control System's Operation Scenarios. Master Thesis","author":"Qu Y.","key":"e_1_3_2_1_29_1"},{"volume-title":"Research and Practice on Testing Methods of On-board Equipment for High-speed Maglev. Master Thesis","year":"2012","author":"Wu J.","key":"e_1_3_2_1_30_1"},{"volume-title":"RSL modeling and verification of high-speed maglev transportation control system. Master Thesis","author":"Zhang Z.","key":"e_1_3_2_1_31_1"},{"issue":"9","key":"e_1_3_2_1_32_1","first-page":"1310","article-title":"Setting Method of Auxiliary Stopping Area for High-Speed Maglev Based on Protection Speed","volume":"47","author":"Yu Y.","year":"2019","journal-title":"Journal of Tongji University (Natural Science)"},{"issue":"9","key":"e_1_3_2_1_33_1","first-page":"41","article-title":"A safety verification method of compositional states based on graph transformation","volume":"49","author":"Du J.","year":"2014","journal-title":"Journal of Shandong University (Natural Science)"}],"event":{"acronym":"ICMSS 2021","name":"ICMSS 2021: 2021 the 5the International Conference on Management Engineering, Software Engineering and Service Sciences","location":"Chengdu China"},"container-title":["2021 the 5the International Conference on Management Engineering, Software Engineering and Service Sciences"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3459012.3459036","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3459012.3459036","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T21:24:55Z","timestamp":1750195495000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3459012.3459036"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,1,8]]},"references-count":33,"alternative-id":["10.1145\/3459012.3459036","10.1145\/3459012"],"URL":"https:\/\/doi.org\/10.1145\/3459012.3459036","relation":{},"subject":[],"published":{"date-parts":[[2021,1,8]]}}}