{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,6]],"date-time":"2026-06-06T01:18:39Z","timestamp":1780708719140,"version":"3.54.1"},"publisher-location":"New York, NY, USA","reference-count":10,"publisher":"ACM","license":[{"start":{"date-parts":[[2021,9,27]],"date-time":"2021-09-27T00:00:00Z","timestamp":1632700800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2021,9,27]]},"DOI":"10.1145\/3494583.3494646","type":"proceedings-article","created":{"date-parts":[[2022,1,10]],"date-time":"2022-01-10T00:43:47Z","timestamp":1641775427000},"page":"27-31","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":3,"title":["Research on Sustainability Evaluation of Prefabricated Construction Supply Chain based on AHP"],"prefix":"10.1145","author":[{"given":"Aimin","family":"Li","sequence":"first","affiliation":[{"name":"School of Management Engineering, Zheng zhou University, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Jing","family":"Lu","sequence":"additional","affiliation":[{"name":"Zheng zhou University, China"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"320","published-online":{"date-parts":[[2022,1,9]]},"reference":[{"key":"e_1_3_2_1_1_1","volume-title":"Sustainability, 2017","author":"HAN Y. SKIBNIEWSKI M, WANG","year":"2069","unstructured":"HAN Y. SKIBNIEWSKI M, WANG L. A Market Equilibrium Supply Chain Model for Supporting Self-Manufacturing or Outsourcing Decisions in Prefabricated Construction[J]. Sustainability, 2017.9(11):2069."},{"key":"e_1_3_2_1_2_1","first-page":"146","volume":"2017","author":"ARASHPOUR M, BAI Y, ARANDA-MENA","unstructured":"ARASHPOUR M, BAI Y, ARANDA-MENA G,et al.Optimizing decisions in advanced manufacturing of prefabricated products:Theorizing supply chain configurations in off-site construction[J].Automation in Construction.2017,84:146-153.","journal-title":"Automation in Construction"},{"key":"e_1_3_2_1_3_1","first-page":"312","volume":"2017","author":"HERMAWAN, MARZUKI P F, ABDUH","unstructured":"HERMAWAN, MARZUKI P F, ABDUH M,et al.The Sustainable Infrastructure through the Construction Supply Chain Carbon Footprint Approach[J].Procedia Engineering,2017,171:312-322.","journal-title":"Procedia Engineering"},{"key":"e_1_3_2_1_4_1","first-page":"863","volume":"2019","author":"AKINADE O O, OYEDELE L","unstructured":"AKINADE O O, OYEDELE L O.Integrating construction supply chains within a circular economy:An ANFIS-based waste analytics system(A-WAS)[J].Joernal of Cleaner Production,2019,229:863-873.","journal-title":"Joernal of Cleaner Production"},{"key":"e_1_3_2_1_5_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2019.03.258"},{"key":"e_1_3_2_1_6_1","volume-title":"Research on sustainable development of prefabricated buildings in China [D]","author":"Yumeng Xu","year":"2015","unstructured":"Xu Yumeng. Research on sustainable development of prefabricated buildings in China [D]. Wuhan: Wuhan University of engineering, 2015."},{"key":"e_1_3_2_1_7_1","volume-title":"Xia song. Research on integrated supply chain management in FDC stage of prefabricated buildings based on JIT [J]","author":"Aimin Qin","year":"2017","unstructured":"Qin Aimin, Xia song. Research on integrated supply chain management in FDC stage of prefabricated buildings based on JIT [J]. Journal of Xinyang Normal University (NATURAL SCIENCE EDITION), 2017,30 (03): 489-493."},{"key":"e_1_3_2_1_8_1","first-page":"130","volume":"2017","author":"Ping Liu","unstructured":"Liu Ping, Li Qiming. Research on the application of BIM in the information flow of the prefabricated building supply chain[J]. Construction Technology,2017,46(12):130-133.","journal-title":"Construction Technology"},{"key":"e_1_3_2_1_9_1","volume-title":"Research on sustainable development evaluation system of assembled buildings from the perspective of whole life cycle [J]. Construction economy","author":"Xiaoyu Ren","year":"2019","unstructured":"Ren Xiaoyu, Zhou Yaping, Research on sustainable development evaluation system of assembled buildings from the perspective of whole life cycle [J]. Construction economy, 2019 (9): 95-99."},{"key":"e_1_3_2_1_10_1","volume-title":"Analysis on sustainable development of assembled buildings from the perspective of supply chain management [J]. Journal of engineering management","author":"Desheng Gao","year":"2019","unstructured":"Gao Desheng, Zhang yunning, Analysis on sustainable development of assembled buildings from the perspective of supply chain management [J]. Journal of engineering management, 2019, 33 (4): 15-20."}],"event":{"name":"ICIBE 2021: 2021 the 7th International Conference on Industrial and Business Engineering","location":"Macau China","acronym":"ICIBE 2021"},"container-title":["Proceedings of the 7th International Conference on Industrial and Business Engineering"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3494583.3494646","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3494583.3494646","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,5,17]],"date-time":"2026-05-17T02:02:49Z","timestamp":1778983369000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3494583.3494646"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,9,27]]},"references-count":10,"alternative-id":["10.1145\/3494583.3494646","10.1145\/3494583"],"URL":"https:\/\/doi.org\/10.1145\/3494583.3494646","relation":{},"subject":[],"published":{"date-parts":[[2021,9,27]]},"assertion":[{"value":"2022-01-09","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}