{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:21:30Z","timestamp":1750220490633,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":18,"publisher":"ACM","license":[{"start":{"date-parts":[[2021,10,23]],"date-time":"2021-10-23T00:00:00Z","timestamp":1634947200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2021,10,23]]},"DOI":"10.1145\/3495018.3495072","type":"proceedings-article","created":{"date-parts":[[2022,3,14]],"date-time":"2022-03-14T17:33:51Z","timestamp":1647279231000},"page":"317-322","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Intelligent Drought Early Warning System for Water Supply of Reservoir Group under the Background of Interconnection and Integration"],"prefix":"10.1145","author":[{"given":"Yunfei","family":"Guan","sequence":"first","affiliation":[{"name":"Zhejiang Design Institute of Water Conservancy and Hydro-Electric Power, China"}]},{"given":"Furong","family":"Zheng","sequence":"additional","affiliation":[{"name":"Zhejiang Design Institute of Water Conservancy and Hydro-Electric Power, China"}]},{"given":"Yong","family":"Xia","sequence":"additional","affiliation":[{"name":"Zhejiang Design Institute of Water Conservancy and Hydro-Electric Power, China"}]}],"member":"320","published-online":{"date-parts":[[2022,3,14]]},"reference":[{"volume-title":"protection, development and utilization in Zhejiang Province","year":"2020","key":"e_1_3_2_1_1_1","unstructured":"Master plan of water resources conservation , protection, development and utilization in Zhejiang Province . Zhejiang Design Institute of Water Conservancy and Hydroelectric Power , 2020 . Master plan of water resources conservation, protection, development and utilization in Zhejiang Province. Zhejiang Design Institute of Water Conservancy and Hydroelectric Power, 2020."},{"key":"e_1_3_2_1_2_1","volume-title":"The Central Committee of the Communist Party of China and the State Council","author":"Central CPC","year":"2021","unstructured":"Opinions of the CPC Central Committee and the State Council on supporting Zhejiang's high-quality development and building a demonstration area of common prosperity . The Central Committee of the Communist Party of China and the State Council , 2021 . Opinions of the CPC Central Committee and the State Council on supporting Zhejiang's high-quality development and building a demonstration area of common prosperity. The Central Committee of the Communist Party of China and the State Council, 2021."},{"key":"e_1_3_2_1_3_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9496(1994)120:5(613)"},{"issue":"6","key":"e_1_3_2_1_4_1","first-page":"639","article-title":"Multi-objective planning method for reservoir water supply risk analysis during drought periods","volume":"57","author":"Fang H. Y.","year":"2002","unstructured":"H. Y. Fang , S. W. Gan , J. X. Hua . Multi-objective planning method for reservoir water supply risk analysis during drought periods . J. Hydroelectr. Eng. , vol. 57 , no. 6 , pp. 639 - 647 , 2002 . H. Y. Fang, S. W. Gan, J. X. Hua. Multi-objective planning method for reservoir water supply risk analysis during drought periods. J. Hydroelectr. Eng., vol. 57, no.6, pp. 639-647, 2002.","journal-title":"J. Hydroelectr. Eng."},{"issue":"3","key":"e_1_3_2_1_5_1","first-page":"444","article-title":"Studies on hydrologic drought warning","volume":"25","author":"Liu N.","year":"2014","unstructured":"N. Liu . Studies on hydrologic drought warning in China. Adv. Water Sci. , vol. 25 , no. 3 , pp. 444 - 450 , 2014 . N. Liu. Studies on hydrologic drought warning in China. Adv. Water Sci., vol. 25, no. 3, pp. 444-450, 2014.","journal-title":"China. Adv. Water Sci."},{"key":"e_1_3_2_1_6_1","doi-asserted-by":"publisher","DOI":"10.1175\/1520-0477-83.8.1149"},{"issue":"10","key":"e_1_3_2_1_7_1","first-page":"1161","article-title":"Early warning system of reservoirs for water supply dispatching and its application","volume":"42","author":"Huang Q.","year":"2011","unstructured":"Q. Huang , F. Wan , L. Qiu , W. C. Huang . Early warning system of reservoirs for water supply dispatching and its application . J. Hydraul. Eng. , vol. 42 , no. 10 , pp. 1161 - 1167 , 2011 . Q. Huang, F. Wan, L. Qiu, W. C. Huang. Early warning system of reservoirs for water supply dispatching and its application. J. Hydraul. Eng., vol. 42, no. 10, pp. 1161-1167, 2011.","journal-title":"J. Hydraul. Eng."},{"issue":"5","key":"e_1_3_2_1_8_1","first-page":"48","article-title":"Study on risk estimation and its accuracy in early warning system system of reservoir water-supply dispatching","volume":"33","author":"Wan F.","year":"2014","unstructured":"F. Wan , W. L. Yuan , W. C. Huang , L. Qiu . Study on risk estimation and its accuracy in early warning system system of reservoir water-supply dispatching . J. Hydroelectr. Eng. , vol. 33 , no. 5 , pp. 48 - 55 , 2014 . F. Wan, W. L. Yuan, W. C. Huang, L. Qiu. Study on risk estimation and its accuracy in early warning system system of reservoir water-supply dispatching. J. Hydroelectr. Eng., vol. 33, no. 5, pp. 48-55, 2014.","journal-title":"J. Hydroelectr. Eng."},{"key":"e_1_3_2_1_9_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.rama.2019.01.002"},{"key":"e_1_3_2_1_10_1","doi-asserted-by":"publisher","DOI":"10.1155\/2019\/9461513"},{"issue":"6","key":"e_1_3_2_1_11_1","first-page":"1","article-title":"Intelligent early warning system for construction safety of excavations adjacent to existing metro tunnels","author":"Tian W.","year":"2021","unstructured":"W. Tian , J. Meng , X. J. Zhong , X. Tan . Intelligent early warning system for construction safety of excavations adjacent to existing metro tunnels . Adv. Civ. Eng. , no. 6 , pp. 1 - 12 , 2021 . W. Tian, J. Meng, X. J. Zhong, X. Tan. Intelligent early warning system for construction safety of excavations adjacent to existing metro tunnels. Adv. Civ. Eng., no. 6, pp. 1-12, 2021.","journal-title":"Adv. Civ. Eng."},{"key":"e_1_3_2_1_12_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11269-009-9430-5"},{"key":"e_1_3_2_1_13_1","doi-asserted-by":"publisher","DOI":"10.1029\/2003WR002910"},{"key":"e_1_3_2_1_14_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.advwatres.2007.12.004"},{"volume-title":"Department of Water Resources of Zhejiang Province","year":"2021","key":"e_1_3_2_1_15_1","unstructured":"Drought early warning management approach of Zhejiang Province . Department of Water Resources of Zhejiang Province , 2021 . Drought early warning management approach of Zhejiang Province. Department of Water Resources of Zhejiang Province, 2021."},{"key":"e_1_3_2_1_16_1","volume-title":"Method of long-term hydrological forecasting and optimal operation of reservoirs and its integration","author":"Peng Y.","year":"2007","unstructured":"Y. Peng . Method of long-term hydrological forecasting and optimal operation of reservoirs and its integration . Dalian University of Technology , 2007 . Y. Peng. Method of long-term hydrological forecasting and optimal operation of reservoirs and its integration. Dalian University of Technology, 2007."},{"key":"e_1_3_2_1_17_1","volume-title":"Article ID 698071, 6 pages","author":"Terzi O.","year":"2012","unstructured":"O. Terzi . Monthly rainfall estimation using data-mining process. Applied Computational Intelligence and Soft Computing , Article ID 698071, 6 pages , 2012 . O. Terzi. Monthly rainfall estimation using data-mining process. Applied Computational Intelligence and Soft Computing, Article ID 698071, 6 pages, 2012."},{"issue":"3","key":"e_1_3_2_1_18_1","first-page":"3982","article-title":"Exploiting data mining technique for rainfall prediction","volume":"5","author":"Sethi N.","year":"2014","unstructured":"N. Sethi , K. Garg . Exploiting data mining technique for rainfall prediction . International Journal of Computer Science and Information Technologies , vol. 5 , no. 3 , pp. 3982 - 3984 , 2014 . N. Sethi, K. Garg. Exploiting data mining technique for rainfall prediction. International Journal of Computer Science and Information Technologies, vol. 5, no. 3, pp. 3982-3984, 2014.","journal-title":"International Journal of Computer Science and Information Technologies"}],"event":{"name":"AIAM2021: 2021 3rd International Conference on Artificial Intelligence and Advanced Manufacture","acronym":"AIAM2021","location":"Manchester United Kingdom"},"container-title":["2021 3rd International Conference on Artificial Intelligence and Advanced Manufacture"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3495018.3495072","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3495018.3495072","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T20:49:20Z","timestamp":1750193360000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3495018.3495072"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,10,23]]},"references-count":18,"alternative-id":["10.1145\/3495018.3495072","10.1145\/3495018"],"URL":"https:\/\/doi.org\/10.1145\/3495018.3495072","relation":{},"subject":[],"published":{"date-parts":[[2021,10,23]]},"assertion":[{"value":"2022-03-14","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}