{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:19:57Z","timestamp":1750220397729,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":8,"publisher":"ACM","license":[{"start":{"date-parts":[[2021,10,23]],"date-time":"2021-10-23T00:00:00Z","timestamp":1634947200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2021,10,23]]},"DOI":"10.1145\/3495018.3495369","type":"proceedings-article","created":{"date-parts":[[2022,3,14]],"date-time":"2022-03-14T17:33:51Z","timestamp":1647279231000},"page":"1219-1224","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Study on Risk Identification Method of Prefabricated PC Structure Building Construction Project"],"prefix":"10.1145","author":[{"given":"Qin","family":"Tao","sequence":"first","affiliation":[{"name":"Chongqing College of Architecture and Technology, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Changnan","family":"Tao","sequence":"additional","affiliation":[{"name":"Chongqing College of Architecture and Technology, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yao","family":"Wang","sequence":"additional","affiliation":[{"name":"Chongqing College of Architecture and Technology, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2022,3,14]]},"reference":[{"key":"e_1_3_2_1_1_1","volume-title":"No.6","author":"Sun Xiaoliang","year":"2017","unstructured":"Xiaoliang Sun . Construction Project Risk Management. Sichuan Cement , No.6 , 2017 . Xiaoliang Sun. Construction Project Risk Management. Sichuan Cement, No.6, 2017."},{"key":"e_1_3_2_1_2_1","volume-title":"Engineering Project Risk Management","author":"Yu Jianxing","year":"2006","unstructured":"Jianxing Yu . Engineering Project Risk Management . Tianjin University Press , 2006 . Jianxing Yu. Engineering Project Risk Management. Tianjin University Press ,2006."},{"key":"e_1_3_2_1_3_1","volume-title":"No.7, PP.101-103+107-1","author":"Jia Junfeng","year":"2005","unstructured":"Junfeng Jia , Qinghuai Liang . The Application of WBS-RBS and AHP Methods in Safety Risk Assessment of Civil Engineering Construction. China Safety Sciecnce Journal , No.7, PP.101-103+107-1 , 2005 . Junfeng Jia, Qinghuai Liang. The Application of WBS-RBS and AHP Methods in Safety Risk Assessment of Civil Engineering Construction. China Safety Sciecnce Journal, No.7, PP.101-103+107-1, 2005."},{"key":"e_1_3_2_1_4_1","volume-title":"Studyon Construction Technology of Concrete Assembly Housing.Beijing: Beijing University of Technology","author":"Wang Zhaoxin","year":"2012","unstructured":"Zhaoxin Wang . Studyon Construction Technology of Concrete Assembly Housing.Beijing: Beijing University of Technology , 2012 . Zhaoxin Wang. Studyon Construction Technology of Concrete Assembly Housing.Beijing: Beijing University of Technology, 2012."},{"key":"e_1_3_2_1_5_1","volume-title":"No.10, PP.119","author":"Sun Xiao","year":"2014","unstructured":"Xiao Sun , Wei Yang . A Preliminary Study on the Advantages of Construction Technology of Concrete Assembly Residential Building . Sichuan Cement , No.10, PP.119 , 2014 . Xiao Sun, Wei Yang. A Preliminary Study on the Advantages of Construction Technology of Concrete Assembly Residential Building . Sichuan Cement, No.10, PP.119, 2014."},{"key":"e_1_3_2_1_6_1","volume-title":"Identification Method for Life Cycle Risk Factors of Assembly Building","author":"Qi Baoku","year":"2016","unstructured":"Baoku Qi , Ya Zhu , Weiyang Fan . Identification Method for Life Cycle Risk Factors of Assembly Building . Journal of Shenyang Jianzhu University (Social Sciences ) , Vol .18, No.3, PP.257-261, 2016 . Baoku Qi, Ya Zhu, Weiyang Fan. Identification Method for Life Cycle Risk Factors of Assembly Building . Journal of Shenyang Jianzhu University (Social Sciences ), Vol.18, No.3, PP.257-261, 2016."},{"key":"e_1_3_2_1_7_1","volume-title":"No.4, PP.171-176","author":"Li Haoran","year":"2019","unstructured":"Haoran Li , Qiming Li , Ying Lu . Key Risk Analysis of Construction Safety of Assembly Construction Based on SEM. China Safety Sciecnce Journal , No.4, PP.171-176 , 2019 . Haoran Li, Qiming Li, Ying Lu. Key Risk Analysis of Construction Safety of Assembly Construction Based on SEM. China Safety Sciecnce Journal, No.4, PP.171-176, 2019."},{"key":"e_1_3_2_1_8_1","volume-title":"No.19","author":"Liu Xiaoyu","year":"2017","unstructured":"Xiaoyu Liu , Ming Lu . Discussion on Risk Types and Countermeasures of Construction Project Risk Management in China. Jiangxi Building Materials , No.19 , 2017 . Xiaoyu Liu, Ming Lu. Discussion on Risk Types and Countermeasures of Construction Project Risk Management in China. Jiangxi Building Materials, No.19, 2017."}],"event":{"name":"AIAM2021: 2021 3rd International Conference on Artificial Intelligence and Advanced Manufacture","acronym":"AIAM2021","location":"Manchester United Kingdom"},"container-title":["2021 3rd International Conference on Artificial Intelligence and Advanced Manufacture"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3495018.3495369","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3495018.3495369","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T20:18:46Z","timestamp":1750191526000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3495018.3495369"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,10,23]]},"references-count":8,"alternative-id":["10.1145\/3495018.3495369","10.1145\/3495018"],"URL":"https:\/\/doi.org\/10.1145\/3495018.3495369","relation":{},"subject":[],"published":{"date-parts":[[2021,10,23]]},"assertion":[{"value":"2022-03-14","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}