{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:21:23Z","timestamp":1750220483971,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":12,"publisher":"ACM","license":[{"start":{"date-parts":[[2021,10,22]],"date-time":"2021-10-22T00:00:00Z","timestamp":1634860800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2021,10,22]]},"DOI":"10.1145\/3501409.3501618","type":"proceedings-article","created":{"date-parts":[[2022,1,2]],"date-time":"2022-01-02T06:18:12Z","timestamp":1641104292000},"page":"1183-1188","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Research on multi-objective flow shop scheduling problem based on improved NSGA-III algorithm"],"prefix":"10.1145","author":[{"given":"Zhang","family":"Xi","sequence":"first","affiliation":[{"name":"School of Mechatronics Engineering and Automation, Shanghai University, Shanghai, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wang","family":"Yuxing","sequence":"additional","affiliation":[{"name":"School of Mechatronics Engineering and Automation, Shanghai University, Shanghai, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2021,12,31]]},"reference":[{"key":"e_1_3_2_1_1_1","volume-title":"Multi-objective scheduling method for dual-resource batch production flexible job shop [J]. Computer engineering and applications","author":"Qiang Zeng","year":"2015","unstructured":"Zeng Qiang, Shen Ling, Ren Hua, Wu Liyun. Multi-objective scheduling method for dual-resource batch production flexible job shop [J]. Computer engineering and applications, 2015, 51(01):250--256"},{"issue":"02","key":"e_1_3_2_1_2_1","first-page":"15","article-title":"Research on Flexible job-shop Scheduling Problem under Low-carbon Objective [J]","volume":"21","author":"Shijie Dang","year":"2016","unstructured":"Dang Shijie, Zhang Guohui, Chao Yufei. Research on Flexible job-shop Scheduling Problem under Low-carbon Objective [J]. Management engineer, 2016, 21(02):15--17.","journal-title":"Management engineer"},{"key":"e_1_3_2_1_3_1","volume-title":"Optimal two and three-stage production schedules with set up times included[J]. Naval research logistics quarterly","author":"SM.","year":"1954","unstructured":"ohnson SM. Optimal two and three-stage production schedules with set up times included[J]. Naval research logistics quarterly, 1954, 1(1): 61--68."},{"key":"e_1_3_2_1_4_1","volume-title":"Research on Multi-Objective Flexible job-shop Scheduling Technology [D]. Xi 'an: Northwestern Polytechnical University","author":"Xiuli Wu","year":"2006","unstructured":"Wu Xiuli. Research on Multi-Objective Flexible job-shop Scheduling Technology [D]. Xi 'an: Northwestern Polytechnical University, 2006"},{"issue":"01","key":"e_1_3_2_1_5_1","first-page":"38","volume":"33","author":"Ming Huang","year":"2012","unstructured":"Huang Ming, LIU Peng-fei, LIANG Xu. Journal of dalian jiaotong university, 2012, 33(01):38--42.","journal-title":"Journal of dalian jiaotong university"},{"issue":"12","key":"e_1_3_2_1_6_1","first-page":"3623","article-title":"Hybrid Mutation Weed Optimization Algorithm for Multi-objective Job-shop Scheduling Problem [J]","volume":"34","author":"Xia Huang","year":"2017","unstructured":"Huang Xia, YE Chunming, CAO Lei. Hybrid Mutation Weed Optimization Algorithm for Multi-objective Job-shop Scheduling Problem [J]. Application Research of Computers, 2017, 34(12):3623--3627.","journal-title":"Application Research of Computers"},{"key":"e_1_3_2_1_7_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-014-6177-9"},{"key":"e_1_3_2_1_8_1","volume-title":"Group intelligence optimization algorithm and its appli-cation research in flow shop scheduling problem [D]. Changchun","author":"WANG P","year":"2019","unstructured":"WANG P F. Group intelligence optimization algorithm and its appli-cation research in flow shop scheduling problem [D]. Changchun, Ji-lin University, 2019."},{"key":"e_1_3_2_1_9_1","volume-title":"China Pulp & Paper","author":"YANG C","year":"2005","unstructured":"YANG C J. Research on Optimal Scheduling Methods of Paper En-terprises Based on Genetic Algorithms [J] China Pulp & Paper, 2005, 24(10): 32."},{"key":"e_1_3_2_1_10_1","unstructured":"Wang HF Fu Y P Huang M et al. A NSGA - II based memetic al-gorithm for multiobjective parallel flow shop scheduling problem[J]. Computers & Industrial Engineering."},{"key":"e_1_3_2_1_11_1","doi-asserted-by":"publisher","DOI":"10.1109\/TEVC.2013.2281535"},{"key":"e_1_3_2_1_12_1","volume-title":"Yanyang. Research on Multi-objective Workshop Production Scheduling Based on Carbon Emissions [D]. China University of Mining and Technology","author":"Chen","year":"2020","unstructured":"Chen Yanyang. Research on Multi-objective Workshop Production Scheduling Based on Carbon Emissions [D]. China University of Mining and Technology, 2020."}],"event":{"name":"EITCE 2021: 2021 5th International Conference on Electronic Information Technology and Computer Engineering","acronym":"EITCE 2021","location":"Xiamen China"},"container-title":["Proceedings of the 2021 5th International Conference on Electronic Information Technology and Computer Engineering"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3501409.3501618","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3501409.3501618","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T20:49:02Z","timestamp":1750193342000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3501409.3501618"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,10,22]]},"references-count":12,"alternative-id":["10.1145\/3501409.3501618","10.1145\/3501409"],"URL":"https:\/\/doi.org\/10.1145\/3501409.3501618","relation":{},"subject":[],"published":{"date-parts":[[2021,10,22]]},"assertion":[{"value":"2021-12-31","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}