{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:17:49Z","timestamp":1750220269070,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":8,"publisher":"ACM","license":[{"start":{"date-parts":[[2022,4,14]],"date-time":"2022-04-14T00:00:00Z","timestamp":1649894400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2022,4,14]]},"DOI":"10.1145\/3544109.3544141","type":"proceedings-article","created":{"date-parts":[[2022,7,18]],"date-time":"2022-07-18T21:49:24Z","timestamp":1658180964000},"page":"177-182","source":"Crossref","is-referenced-by-count":0,"title":["Research and Application of BIM + GIS Information Technology for Land Acquisition and Resettlement of Pumped Storage Power Station"],"prefix":"10.1145","author":[{"given":"Sheng","family":"Xin","sequence":"first","affiliation":[{"name":"Strategy&amp;Planning Department of CSG POWER GENERATION CO., LTD, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Liang","family":"Tan","sequence":"additional","affiliation":[{"name":"Resource&amp;Environment Design Branch of Guangdong Hydropower Planning&amp;Design Institute Co., Ltd, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xueyuan","family":"Deng","sequence":"additional","affiliation":[{"name":"Planning Branch of Guangdong Hydropower Planning&amp;Design Institute Co., Ltd, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Miwei","family":"Liu","sequence":"additional","affiliation":[{"name":"Production Operation Dept. of Guangdong Hydropower, Planning&amp;Design Institute Co., Ltd, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Weiqin","family":"Luo","sequence":"additional","affiliation":[{"name":"Production Operation Dept. of Guangdong Hydropower, Planning&amp;Design Institute Co., Ltd, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2022,7,18]]},"reference":[{"issue":"5","key":"e_1_3_2_1_1_1","first-page":"126","article-title":"Research progress of fusion application of hydraulic engineering information and BIM + GIS","volume":"41","author":"Benqian Su","year":"2020","unstructured":"Su Benqian , Yu Dehu , Sun Baoti , Yu Gaofang , Xu Yang , Yang Shujuan . ( 2020 ). Research progress of fusion application of hydraulic engineering information and BIM + GIS . Journal of Qingdao Technological University. 41 ( 5 ), 126 - 132 . Su Benqian, Yu Dehu, Sun Baoti, Yu Gaofang, Xu Yang, Yang Shujuan. (2020). Research progress of fusion application of hydraulic engineering information and BIM + GIS. Journal of Qingdao Technological University. 41(5), 126-132.","journal-title":"Journal of Qingdao Technological University."},{"key":"e_1_3_2_1_2_1","first-page":"141","article-title":"GIS+BIM-based highway land acquisition and demolition management system","volume":"9","author":"Ming Chen","year":"2018","unstructured":"Chen Ming . ( 2018 ). GIS+BIM-based highway land acquisition and demolition management system . Transportation Information Industry. 9 , 141 - 143 . Chen Ming. (2018). GIS+BIM-based highway land acquisition and demolition management system. Transportation Information Industry. 9, 141-143.","journal-title":"Transportation Information Industry."},{"issue":"7","key":"e_1_3_2_1_3_1","first-page":"178","article-title":"Application of GIS+BIM technology assisted by drone tilt photography in highway","volume":"47","author":"Zhiyong Wang","year":"2021","unstructured":"Wang Zhiyong . ( 2021 ). Application of GIS+BIM technology assisted by drone tilt photography in highway . Shanxi Architecture. 47 ( 7 ), 178 - 180 . Wang Zhiyong. (2021). Application of GIS+BIM technology assisted by drone tilt photography in highway. Shanxi Architecture. 47(7), 178-180.","journal-title":"Shanxi Architecture."},{"key":"e_1_3_2_1_4_1","first-page":"60","article-title":"Application Research on Digital Delivery Platform of Pumped Storage Power Station Based on BIM+GIS","volume":"10","author":"Kai Xiao","year":"2021","unstructured":"Xiao Kai . Ji Huaijie . ( 2021 ). Application Research on Digital Delivery Platform of Pumped Storage Power Station Based on BIM+GIS . Technical Supervision in Water Resources. 10 , 60 - 62 +89. Xiao Kai. Ji Huaijie. (2021). Application Research on Digital Delivery Platform of Pumped Storage Power Station Based on BIM+GIS. Technical Supervision in Water Resources.10, 60-62+89.","journal-title":"Technical Supervision in Water Resources."},{"key":"e_1_3_2_1_5_1","first-page":"46","article-title":"Application of BIM and 3D GIS integration in hydraulic engineering","volume":"10","author":"Chunguang Zhu","year":"2021","unstructured":"Zhu Chunguang . Wang Yikun . Qi Yangxu . Wang Wenzhong . ( 2021 ). Application of BIM and 3D GIS integration in hydraulic engineering . Jiangsu Water Resource. 10 , 46 - 48 . Zhu Chunguang. Wang Yikun. Qi Yangxu. Wang Wenzhong. (2021). Application of BIM and 3D GIS integration in hydraulic engineering. Jiangsu Water Resource. 10, 46-48.","journal-title":"Jiangsu Water Resource."},{"key":"e_1_3_2_1_6_1","first-page":"1","article-title":"Integrated application of BIM in water resources allocation project of Pearl River Delta","volume":"3","author":"Canyang Du","year":"2021","unstructured":"Du Canyang . Zhang Zhaobo . Liu Dan . Zhu Xiaobin . ( 2021 ). Integrated application of BIM in water resources allocation project of Pearl River Delta . Water Resources Information. 3 , 1 - 7 . Du Canyang. Zhang Zhaobo. Liu Dan. Zhu Xiaobin. (2021). Integrated application of BIM in water resources allocation project of Pearl River Delta. Water Resources Information. 3, 1-7.","journal-title":"Water Resources Information."},{"issue":"7","key":"e_1_3_2_1_7_1","first-page":"97","article-title":"Application value and analysis of \"BIM+GIS\" in operation and management of water conservancy projects","volume":"24","author":"Wen Jiang","year":"2021","unstructured":"Jiang Wen . Wang Huiming . Wang Xianglin . ( 2021 ). Application value and analysis of \"BIM+GIS\" in operation and management of water conservancy projects . China Management Information. 24 ( 7 ), 97 - 98 . Jiang Wen. Wang Huiming. Wang Xianglin. (2021). Application value and analysis of \"BIM+GIS\" in operation and management of water conservancy projects. China Management Information. 24(7), 97-98.","journal-title":"China Management Information."},{"key":"e_1_3_2_1_8_1","unstructured":"Wang Zuoqi. Zeng Fandu. Li Zuoquan. Elementary Introduction to the Implementation and Application of BIM+GIS in Water Resources Allocation Engineering. Hunan Hydro & Power. 2 52-54.  Wang Zuoqi. Zeng Fandu. Li Zuoquan. Elementary Introduction to the Implementation and Application of BIM+GIS in Water Resources Allocation Engineering. Hunan Hydro & Power. 2 52-54."}],"event":{"name":"IPEC2022: 2022 3rd Asia-Pacific Conference on Image Processing, Electronics and Computers","acronym":"IPEC2022","location":"Dalian China"},"container-title":["2022 3rd Asia-Pacific Conference on Image Processing, Electronics and Computers"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3544109.3544141","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3544109.3544141","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T19:31:02Z","timestamp":1750188662000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3544109.3544141"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,4,14]]},"references-count":8,"alternative-id":["10.1145\/3544109.3544141","10.1145\/3544109"],"URL":"https:\/\/doi.org\/10.1145\/3544109.3544141","relation":{},"subject":[],"published":{"date-parts":[[2022,4,14]]}}}