{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:16:35Z","timestamp":1750220195001,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":13,"publisher":"ACM","license":[{"start":{"date-parts":[[2022,9,23]],"date-time":"2022-09-23T00:00:00Z","timestamp":1663891200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2022,9,23]]},"DOI":"10.1145\/3558819.3565166","type":"proceedings-article","created":{"date-parts":[[2022,10,27]],"date-time":"2022-10-27T01:37:33Z","timestamp":1666834653000},"page":"669-672","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Research on Signal System's Function Design and Allocation of Low-Vacuum Pipeline Maglev"],"prefix":"10.1145","author":[{"given":"Shanqiang","family":"Fu","sequence":"first","affiliation":[{"name":"CRRC Qingdao Sifang Locomotive and Rolling Stock Co., Ltd, China"}]},{"given":"Yi","family":"Tian","sequence":"additional","affiliation":[{"name":"CRRC Qingdao Sifang Locomotive and Rolling Stock Co., Ltd, China"}]},{"given":"Qinfeng","family":"Wang","sequence":"additional","affiliation":[{"name":"CRRC Qingdao Sifang Locomotive and Rolling Stock Co., Ltd, China"}]},{"given":"Mingwei","family":"Li","sequence":"additional","affiliation":[{"name":"CRRC Qingdao Sifang Locomotive and Rolling Stock Co., Ltd, China"}]},{"given":"Zhaowei","family":"Zhou","sequence":"additional","affiliation":[{"name":"CRRC Qingdao Sifang Locomotive and Rolling Stock Co., Ltd, China"}]},{"given":"Dong","family":"Wang","sequence":"additional","affiliation":[{"name":"CRRC Qingdao Sifang Locomotive and Rolling Stock Co., Ltd, China"}]}],"member":"320","published-online":{"date-parts":[[2022,10,26]]},"reference":[{"key":"e_1_3_2_1_1_1","unstructured":"Josef Doppelbauer. \"Hyperloop\u2013an Innovation for Global Transportation? \" Valenciennes 12 June 2014 <https:\/\/www.era.europa.eu\/>(19 October 2014). https:\/\/www.era.europa.eu\/.  Josef Doppelbauer. \"Hyperloop\u2013an Innovation for Global Transportation? \" Valenciennes 12 June 2014 <https:\/\/www.era.europa.eu\/>(19 October 2014). https:\/\/www.era.europa.eu\/."},{"issue":"11","key":"e_1_3_2_1_2_1","first-page":"52","volume":"2020","author":"Matthias Plavec","unstructured":"Matthias Plavec , Frank Michelberger. Eine Analyse des Hyperloop-Konzepts[J]. Der Eisenbahn Ingenieur , 2020 ( 11 ): 52 - 55 . Matthias Plavec, Frank Michelberger. Eine Analyse des Hyperloop-Konzepts[J]. Der Eisenbahn Ingenieur, 2020(11): 52-55.","journal-title":"Der Eisenbahn Ingenieur"},{"issue":"11","key":"e_1_3_2_1_3_1","first-page":"22","volume":"68","author":"Ingo A.","year":"2019","unstructured":"Ingo A. Hansen . Hochgeschwindigkeitsverkehr in Vakuumr\u00f6hren: Ist Hyperloop machbar?[J]. Eisenbahntechnische Rundschau , 2019 , 68 ( 11 ): 22 - 29 . Ingo A. Hansen. Hochgeschwindigkeitsverkehr in Vakuumr\u00f6hren: Ist Hyperloop machbar?[J]. Eisenbahntechnische Rundschau, 2019, 68(11): 22-29.","journal-title":"Eisenbahntechnische Rundschau"},{"volume-title":"Acoustics-Railway applications-Measurement of noise emitted by railbound vehicles: ISO3095: 2013[S]","year":"2013","key":"e_1_3_2_1_4_1","unstructured":"ISO\/TC43. Acoustics-Railway applications-Measurement of noise emitted by railbound vehicles: ISO3095: 2013[S] . Geneva : International Organization for Standardization , 2013 . ISO\/TC43. Acoustics-Railway applications-Measurement of noise emitted by railbound vehicles: ISO3095: 2013[S]. Geneva: International Organization for Standardization, 2013."},{"key":"e_1_3_2_1_5_1","volume-title":"ETCS System Requirements Specification, subset 026-1, issue 3.4.0","author":"European Railway Agency","year":"2014","unstructured":"European Railway Agency , ETCS System Requirements Specification, subset 026-1, issue 3.4.0 , 2014 . European Railway Agency, ETCS System Requirements Specification, subset 026-1, issue 3.4.0, 2014."},{"key":"e_1_3_2_1_6_1","first-page":"23","volume-title":"TTS Technika Transportu Szynowego 7-8\/2009","author":"Rychlewski J.","unstructured":"Rychlewski J. , \u201c Wp\u0142yw modernizacji linii kolejowych na ich przepustowo\u015b\u0107 \u201d, TTS Technika Transportu Szynowego 7-8\/2009 , pp 23 - 27 . Rychlewski J., \u201cWp\u0142yw modernizacji linii kolejowych na ich przepustowo\u015b\u0107\u201d, TTS Technika Transportu Szynowego 7-8\/2009, pp 23-27."},{"key":"e_1_3_2_1_7_1","volume-title":"Moving Block vs Fixed Block Signalling-Which is better?","author":"Naeem M","year":"2015","unstructured":"Naeem M Ali , \u201c Moving Block vs Fixed Block Signalling-Which is better? \u201d, September 2015 https:\/\/www.linkedin.com\/pulse\/moving-block-vs-fixed-signalling-which-better-naeem-ali\/. Naeem M Ali, \u201cMoving Block vs Fixed Block Signalling-Which is better?\u201d, September 2015 https:\/\/www.linkedin.com\/pulse\/moving-block-vs-fixed-signalling-which-better-naeem-ali\/."},{"key":"e_1_3_2_1_8_1","volume-title":"Houses of Parliament","author":"Harriss Lydia","year":"2016","unstructured":"Harriss Lydia , \u201c Moving Block Signalling \u201d, Houses of Parliament , Parliamentary Office of Science &Technology , Number 20, 26 April 2016 . Harriss Lydia, \u201cMoving Block Signalling\u201d, Houses of Parliament, Parliamentary Office of Science &Technology, Number 20, 26 April 2016."},{"key":"e_1_3_2_1_9_1","volume-title":"Compendium on ERTMS","author":"Winter P.","year":"2009","unstructured":"Winter P. , Compendium on ERTMS , Eurail-press, Hamburg 2009 , ISBN : 978-3777103969. Winter P., Compendium on ERTMS, Eurail-press, Hamburg 2009, ISBN: 978-3777103969."},{"key":"e_1_3_2_1_10_1","volume-title":"Utrecht","author":"System Requirements Specification","year":"1996","unstructured":"System Requirements Specification for the Eu-ropean Train Control System , filing no. A200\/SRS.04-A5499A5-03.01-960809 , Utrecht 1996 . System Requirements Specification for the Eu-ropean Train Control System, filing no. A200\/SRS.04-A5499A5-03.01-960809, Utrecht 1996."},{"key":"e_1_3_2_1_11_1","volume-title":"Reliability and Safety: Innovating Theory and Practice - Proceedings of the 26th European Safety and Reliability Conference, ESREL 2016, ISBN: 978-113802997-2","author":"Pawlik M.","year":"2017","unstructured":"Pawlik M. , Safety margins for the reconfigurations of trains\u2019 compositions in motion, Risk , Reliability and Safety: Innovating Theory and Practice - Proceedings of the 26th European Safety and Reliability Conference, ESREL 2016, ISBN: 978-113802997-2 , 2017 Taylor & Francis Group, London. Pawlik M., Safety margins for the reconfigurations of trains\u2019 compositions in motion, Risk, Reliability and Safety: Innovating Theory and Practice - Proceedings of the 26th European Safety and Reliability Conference, ESREL 2016, ISBN: 978-113802997-2, 2017 Taylor & Francis Group, London."},{"key":"e_1_3_2_1_12_1","unstructured":"Pawlik M. European Rail Traffic Management System functions and technical solutions over-view \u2013 from an idea to implementation and ex-ploitation (Europejski System Zarz\u0105dzania Ruchem Kolejowym przegl\u0105d funkcjii rozwi\u0105za\u0144 technicznych - od idei do wdro\u017ce\u0144 i eksploatacji) KOW Warsaw 2015 ISBN 978-83-943085-1-3.  Pawlik M. European Rail Traffic Management System functions and technical solutions over-view \u2013 from an idea to implementation and ex-ploitation (Europejski System Zarz\u0105dzania Ruchem Kolejowym przegl\u0105d funkcjii rozwi\u0105za\u0144 technicznych - od idei do wdro\u017ce\u0144 i eksploatacji) KOW Warsaw 2015 ISBN 978-83-943085-1-3."},{"key":"e_1_3_2_1_13_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-030-27008-7_1"}],"event":{"name":"ICCSIE2022: 7th International Conference on Cyber Security and Information Engineering","acronym":"ICCSIE2022","location":"Brisbane QLD Australia"},"container-title":["Proceedings of the 7th International Conference on Cyber Security and Information Engineering"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3558819.3565166","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3558819.3565166","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T19:02:37Z","timestamp":1750186957000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3558819.3565166"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,9,23]]},"references-count":13,"alternative-id":["10.1145\/3558819.3565166","10.1145\/3558819"],"URL":"https:\/\/doi.org\/10.1145\/3558819.3565166","relation":{},"subject":[],"published":{"date-parts":[[2022,9,23]]},"assertion":[{"value":"2022-10-26","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}