{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:16:35Z","timestamp":1750220195541,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":10,"publisher":"ACM","license":[{"start":{"date-parts":[[2022,9,23]],"date-time":"2022-09-23T00:00:00Z","timestamp":1663891200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2022,9,23]]},"DOI":"10.1145\/3558819.3565464","type":"proceedings-article","created":{"date-parts":[[2022,10,27]],"date-time":"2022-10-27T01:37:33Z","timestamp":1666834653000},"page":"1037-1043","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Research on Multistage Self-healing Planning of Distribution Network based on Genetic Algorithm"],"prefix":"10.1145","author":[{"given":"Ruifeng","family":"Zhao","sequence":"first","affiliation":[{"name":"Electric Power Dispatching and Control Center of Guangdong Power Grid Co.,Ltd, China"}]},{"given":"Zhiwen","family":"Yu","sequence":"additional","affiliation":[{"name":"Electric Power Dispatching and Control Center of Guangdong Power Grid Co.,Ltd, China"}]},{"given":"Kaiyan","family":"Pan","sequence":"additional","affiliation":[{"name":"Dongfang Electronics Cooperation, China"}]},{"given":"Jiangang","family":"Lu","sequence":"additional","affiliation":[{"name":"Electric Power Dispatching and Control Center of Guangdong Power Grid Co.,Ltd, China"}]},{"given":"Zhanqiang","family":"Xu","sequence":"additional","affiliation":[{"name":"Electric Power Dispatching and Control Center of Guangdong Power Grid Co.,Ltd, China"}]},{"given":"Hanzhi","family":"Zhang","sequence":"additional","affiliation":[{"name":"Dongfang Electronics Cooperation, China"}]},{"given":"Hua","family":"Liu","sequence":"additional","affiliation":[{"name":"Dongfang Electronics Cooperation, China"}]}],"member":"320","published-online":{"date-parts":[[2022,10,26]]},"reference":[{"issue":"6","key":"e_1_3_2_1_1_1","first-page":"118","article-title":"Day-ahead hierarchical dispatching model considering friendliness of wind power[J]","volume":"47","author":"Gaohang ZHANG","year":"2019","unstructured":"ZHANG Gaohang , LI Fengting , ZHOU Qiang , el al. Day-ahead hierarchical dispatching model considering friendliness of wind power[J] . Power System Protection and Control , 2019 , 47 ( 6 ): 118 - 124 . ZHANG Gaohang, LI Fengting, ZHOU Qiang, el al. Day-ahead hierarchical dispatching model considering friendliness of wind power[J]. Power System Protection and Control, 2019, 47(6): 118-124.","journal-title":"Power System Protection and Control"},{"issue":"24","key":"e_1_3_2_1_2_1","first-page":"178","article-title":"Review of wind power forecasting methods and new trends[J]","volume":"47","author":"Zifen HAN","year":"2019","unstructured":"HAN Zifen , JING Qianming , ZHANG Yankai , el al. Review of wind power forecasting methods and new trends[J] . Power System Protection and Control , 2019 , 47 ( 24 ): 178 - 187 . HAN Zifen, JING Qianming, ZHANG Yankai, el al. Review of wind power forecasting methods and new trends[J]. Power System Protection and Control, 2019, 47(24): 178-187.","journal-title":"Power System Protection and Control"},{"key":"e_1_3_2_1_3_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2016.2517620"},{"key":"e_1_3_2_1_4_1","doi-asserted-by":"publisher","DOI":"10.23919\/ChiCC.2017.8029053"},{"issue":"5","key":"e_1_3_2_1_5_1","first-page":"146","article-title":"Overview on power system flexibility evaluation[J]","volume":"44","author":"Tao SHI","year":"2016","unstructured":"SHI Tao , ZHU Lingzhi , YU Ruoying . Overview on power system flexibility evaluation[J] . Power System Protection and Control , 2016 , 44 ( 5 ): 146 - 154 . SHI Tao, ZHU Lingzhi, YU Ruoying. Overview on power system flexibility evaluation[J]. Power System Protection and Control, 2016, 44(5): 146-154.","journal-title":"Power System Protection and Control"},{"issue":"6","key":"e_1_3_2_1_6_1","first-page":"1569","article-title":"A survey on power system flexibility and its evaluations[J]","volume":"38","author":"Dingyao XIAO","year":"2015","unstructured":"XIAO Dingyao , WANG Chengmin , ZENG Pingliang , A survey on power system flexibility and its evaluations[J] . Power System Technology , 2015 , 38 ( 6 ): 1569 - 1576 . XIAO Dingyao, WANG Chengmin, ZENG Pingliang, A survey on power system flexibility and its evaluations[J]. Power System Technology, 2015, 38(6): 1569-1576.","journal-title":"Power System Technology"},{"key":"e_1_3_2_1_7_1","doi-asserted-by":"publisher","DOI":"10.17798\/bitlisfen.460164"},{"issue":"6","key":"e_1_3_2_1_8_1","first-page":"1672","article-title":"Assessment on operational flexibility of power grid with grid-connected large-scale wind farms[J]","volume":"39","author":"Haibo LI","year":"2015","unstructured":"LI Haibo , LU Zongxiang , QIAO Ying , Assessment on operational flexibility of power grid with grid-connected large-scale wind farms[J] . Power System Technology , 2015 , 39 ( 6 ): 1672 - 1678 . LI Haibo, LU Zongxiang, QIAO Ying, Assessment on operational flexibility of power grid with grid-connected large-scale wind farms[J]. Power System Technology, 2015, 39(6): 1672-1678.","journal-title":"Power System Technology"},{"issue":"11","key":"e_1_3_2_1_9_1","first-page":"32","article-title":"Collaborative optimization model and algorithm of maintenance and operation considering flexibility[J]","volume":"42","author":"Yibin XU","year":"2018","unstructured":"XU Yibin , ZHANG Yu , HE Yubin , Collaborative optimization model and algorithm of maintenance and operation considering flexibility[J] . Automation of Electric Power Systems , 2018 , 42 ( 11 ): 32 - 40 . XU Yibin, ZHANG Yu, HE Yubin, Collaborative optimization model and algorithm of maintenance and operation considering flexibility[J]. Automation of Electric Power Systems, 2018, 42(11): 32-40.","journal-title":"Automation of Electric Power Systems"},{"issue":"17","key":"e_1_3_2_1_10_1","first-page":"61","article-title":"Day-ahead scheduling model in wind power integrated system incorporating shiftable load[J]","volume":"46","author":"Na YU","year":"2018","unstructured":"YU Na , LI Weimeng , HUANG Dawei , Day-ahead scheduling model in wind power integrated system incorporating shiftable load[J] . Power System Protection and Control , 2018 , 46 ( 17 ): 61 - 67 . YU Na, LI Weimeng, HUANG Dawei, Day-ahead scheduling model in wind power integrated system incorporating shiftable load[J]. Power System Protection and Control, 2018, 46(17): 61-67.","journal-title":"Power System Protection and Control"}],"event":{"name":"ICCSIE2022: 7th International Conference on Cyber Security and Information Engineering","acronym":"ICCSIE2022","location":"Brisbane QLD Australia"},"container-title":["Proceedings of the 7th International Conference on Cyber Security and Information Engineering"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3558819.3565464","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3558819.3565464","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T19:02:38Z","timestamp":1750186958000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3558819.3565464"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,9,23]]},"references-count":10,"alternative-id":["10.1145\/3558819.3565464","10.1145\/3558819"],"URL":"https:\/\/doi.org\/10.1145\/3558819.3565464","relation":{},"subject":[],"published":{"date-parts":[[2022,9,23]]},"assertion":[{"value":"2022-10-26","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}