{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,30]],"date-time":"2026-01-30T05:43:00Z","timestamp":1769751780163,"version":"3.49.0"},"publisher-location":"New York, NY, USA","reference-count":11,"publisher":"ACM","license":[{"start":{"date-parts":[[2022,11,4]],"date-time":"2022-11-04T00:00:00Z","timestamp":1667520000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2022,11,4]]},"DOI":"10.1145\/3582935.3582976","type":"proceedings-article","created":{"date-parts":[[2023,4,10]],"date-time":"2023-04-10T22:18:52Z","timestamp":1681165132000},"page":"256-260","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":1,"title":["Analysis of Negative Current Caused by Three-phase Four-Wire Electric Energy Meter under Normal Wiring"],"prefix":"10.1145","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-6547-048X","authenticated-orcid":false,"given":"Jinjin","family":"Li","sequence":"first","affiliation":[{"name":"Metering Center, Guangxi Power Grid Corporation, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2486-6269","authenticated-orcid":false,"given":"Fanghua","family":"Mo","sequence":"additional","affiliation":[{"name":"Nanning Power Supply Bureau, Guangxi Power Grid Corporation, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2905-3256","authenticated-orcid":false,"given":"Wenqian","family":"Jiang","sequence":"additional","affiliation":[{"name":"Metering Center, Guangxi Power Grid Corporation, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2635-1349","authenticated-orcid":false,"given":"Jueyu","family":"Chen","sequence":"additional","affiliation":[{"name":"Metering Center, Guangxi Power Grid Corporation, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2023,4,10]]},"reference":[{"key":"e_1_3_2_1_1_1","first-page":"27","article-title":"An auxiliary wiring tool for high-voltage metering devices [J]","volume":"2021","author":"Wang Yuerong","unstructured":"Yuerong Wang , Xiaoqun Zhao . An auxiliary wiring tool for high-voltage metering devices [J] . Rural Electrician 2021 , 29(12): 27 - 28 . Yuerong Wang, Xiaoqun Zhao. An auxiliary wiring tool for high-voltage metering devices [J]. Rural Electrician 2021, 29(12): 27-28.","journal-title":"Rural Electrician"},{"issue":"02","key":"e_1_3_2_1_2_1","first-page":"56","article-title":"Analysis of the installation and connection of the meter (Continued 1) [J]","volume":"29","author":"Liang Bo","year":"2021","unstructured":"Bo Liang , Fengxiang Wang , Wei Xu . Analysis of the installation and connection of the meter (Continued 1) [J] . Rural Electrician , 2021 , 29 ( 02 ): 56 - 57 . Bo Liang, Fengxiang Wang, Wei Xu. Analysis of the installation and connection of the meter (Continued 1) [J]. Rural Electrician, 2021, 29(02): 56-57.","journal-title":"Rural Electrician"},{"issue":"01","key":"e_1_3_2_1_3_1","first-page":"191","article-title":"Discussion on the calculation method of missing electricity in electric energy metering management system [J]","volume":"2021","author":"Luo Luo","unstructured":"Luo Luo . Discussion on the calculation method of missing electricity in electric energy metering management system [J] . Science and Technology Innovation , 2021 ( 01 ): 191 - 192 . Luo Luo. Discussion on the calculation method of missing electricity in electric energy metering management system [J]. Science and Technology Innovation, 2021(01):191-192.","journal-title":"Science and Technology Innovation"},{"issue":"22","key":"e_1_3_2_1_4_1","first-page":"126","article-title":"Measurement analysis of several misconnections of three-phase four-wire active energy meters [J]","volume":"2020","author":"Li Mingzhu","unstructured":"Mingzhu Li , Weiting Sun , Mengyao Zhang . Measurement analysis of several misconnections of three-phase four-wire active energy meters [J] . Electrical Technology , 2020 ( 22 ): 126 - 128 . Mingzhu Li, Weiting Sun, Mengyao Zhang. Measurement analysis of several misconnections of three-phase four-wire active energy meters [J]. Electrical Technology, 2020(22):126-128.","journal-title":"Electrical Technology"},{"issue":"33","key":"e_1_3_2_1_5_1","first-page":"54","article-title":"Analysis of device with three-phase four-wire electric energy metering [J]","volume":"2020","author":"Yuan Daiguo","unstructured":"Daiguo Yuan . Analysis of device with three-phase four-wire electric energy metering [J] . Electromechanical Information , 2020 ( 33 ): 54 - 55 . Daiguo Yuan. Analysis of device with three-phase four-wire electric energy metering [J]. Electromechanical Information, 2020(33):54-55.","journal-title":"Electromechanical Information"},{"issue":"03","key":"e_1_3_2_1_6_1","first-page":"158","article-title":"Detection of abnormal power consumption of industrial and commercial users based on knowledge embedding and DNN [J]","volume":"39","author":"Li Jiangteng","year":"2020","unstructured":"Jiangteng Li , Fei Wang . Detection of abnormal power consumption of industrial and commercial users based on knowledge embedding and DNN [J] . Electric Power Engineering Technology , 2020 , 39 ( 03 ): 158 - 165 . Jiangteng Li, Fei Wang. Detection of abnormal power consumption of industrial and commercial users based on knowledge embedding and DNN [J]. Electric Power Engineering Technology, 2020, 39(03):158-165.","journal-title":"Electric Power Engineering Technology"},{"issue":"01","key":"e_1_3_2_1_7_1","first-page":"40","article-title":"Three-phase four-wire electric energy measurement error wiring training software design [J]","volume":"18","author":"Jia Hongwei","year":"2020","unstructured":"Hongwei Jia , Yixuan Yang , Qiyin Han . Three-phase four-wire electric energy measurement error wiring training software design [J] . Journal of Guangdong Water Conservancy and Electric Power Vocational and Technical College , 2020 , 18 ( 01 ): 40 - 43 . Hongwei Jia, Yixuan Yang, Qiyin Han. Three-phase four-wire electric energy measurement error wiring training software design [J]. Journal of Guangdong Water Conservancy and Electric Power Vocational and Technical College, 2020, 18(01): 40-43.","journal-title":"Journal of Guangdong Water Conservancy and Electric Power Vocational and Technical College"},{"issue":"05","key":"e_1_3_2_1_8_1","first-page":"150","article-title":"Application of modularization + big data processing technology to improve the wiring rate of new metering [J]","volume":"43","author":"Zhao Xiaoqun","year":"2020","unstructured":"Xiaoqun Zhao , Lei Cao , Wu Zhang . Application of modularization + big data processing technology to improve the wiring rate of new metering [J] . Electronic Measurement Technology , 2020 , 43 ( 05 ): 150 - 155 . Xiaoqun Zhao, Lei Cao, Wu Zhang. Application of modularization + big data processing technology to improve the wiring rate of new metering [J]. Electronic Measurement Technology, 2020,43(05):150-155.","journal-title":"Electronic Measurement Technology"},{"issue":"08","key":"e_1_3_2_1_9_1","first-page":"69","article-title":"Analysis of the influence of wrong wiring of three-phase four-wire electric energy meter on electric energy measurement [J]","volume":"46","author":"Li Zhenna","year":"2019","unstructured":"Zhenna Li , Kun Cai , Rulan Lin . Analysis of the influence of wrong wiring of three-phase four-wire electric energy meter on electric energy measurement [J] . Measurement and Testing Technology , 2019 , 46 ( 08 ): 69 - 72 . Zhenna Li, Kun Cai, Rulan Lin. Analysis of the influence of wrong wiring of three-phase four-wire electric energy meter on electric energy measurement [J]. Measurement and Testing Technology, 2019,46(08):69-72.","journal-title":"Measurement and Testing Technology"},{"key":"e_1_3_2_1_10_1","first-page":"39","volume-title":"Instrument Standardization and Measurement","author":"Li Guosheng","year":"2019","unstructured":"Guosheng Li , Jianwu Tao , Xue Zheng , Ying Wang , Nianqun Yu , Jun Wang . The influence of the three-phase four-wire electric energy metering device on the electric energy measurement after the neutral line of the meter is disconnected [J] . Instrument Standardization and Measurement , 2019 (04): 39 - 41 . Guosheng Li, Jianwu Tao, Xue Zheng, Ying Wang, Nianqun Yu, Jun Wang. The influence of the three-phase four-wire electric energy metering device on the electric energy measurement after the neutral line of the meter is disconnected [J]. Instrument Standardization and Measurement, 2019 (04):39-41."},{"issue":"03","key":"e_1_3_2_1_11_1","first-page":"1","article-title":"Judgment of wrong wiring of three-phase four-wire electric energy metering device based on hexagonal diagram method [J]","volume":"2019","author":"Fan Jing","unstructured":"Jing Fan . Judgment of wrong wiring of three-phase four-wire electric energy metering device based on hexagonal diagram method [J] . Electromechanical Information , 2019 ( 03 ): 1 - 2 . Jing Fan. Judgment of wrong wiring of three-phase four-wire electric energy metering device based on hexagonal diagram method [J]. Electromechanical Information, 2019(03):1-2.","journal-title":"Electromechanical Information"}],"event":{"name":"ICITEE 2022: 5th International Conference on Information Technologies and Electrical Engineering","location":"Changsha China","acronym":"ICITEE 2022"},"container-title":["Proceedings of the 5th International Conference on Information Technologies and Electrical Engineering"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3582935.3582976","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3582935.3582976","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T17:49:20Z","timestamp":1750182560000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3582935.3582976"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,11,4]]},"references-count":11,"alternative-id":["10.1145\/3582935.3582976","10.1145\/3582935"],"URL":"https:\/\/doi.org\/10.1145\/3582935.3582976","relation":{},"subject":[],"published":{"date-parts":[[2022,11,4]]},"assertion":[{"value":"2023-04-10","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}