{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:13:48Z","timestamp":1750220028773,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":15,"publisher":"ACM","license":[{"start":{"date-parts":[[2022,12,16]],"date-time":"2022-12-16T00:00:00Z","timestamp":1671148800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2022,12,16]]},"DOI":"10.1145\/3584376.3584573","type":"proceedings-article","created":{"date-parts":[[2023,4,19]],"date-time":"2023-04-19T22:54:51Z","timestamp":1681944891000},"page":"1111-1116","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Research on Hybrid Flow-shop Scheduling Based on INSGA-II Algorithm"],"prefix":"10.1145","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-9574-9361","authenticated-orcid":false,"given":"Haopeng","family":"Chen","sequence":"first","affiliation":[{"name":"College of Science and Education Integration, Ningbo University, China and \rNingbo Institute of Materials Technology and Engineering, Chinese Academy of Sciences, China"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-4025-039X","authenticated-orcid":false,"given":"Zaojun","family":"Fang","sequence":"additional","affiliation":[{"name":"Ningbo Institute of Materials Technology and Engineering, Chinese Academy of Sciences, China"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5126-8849","authenticated-orcid":false,"given":"Caiming","family":"Zhong","sequence":"additional","affiliation":[{"name":"College of Science &amp; Technology Ningbo University, China"}]}],"member":"320","published-online":{"date-parts":[[2023,4,19]]},"reference":[{"key":"e_1_3_2_1_1_1","doi-asserted-by":"publisher","DOI":"10.3390\/sym13122421"},{"key":"e_1_3_2_1_2_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2013.02.022"},{"key":"e_1_3_2_1_3_1","doi-asserted-by":"crossref","unstructured":"Pratiwi Y E Kusbudiono K Riski A Hadi A F. 2020. Hybrid flow-shop scheduling (HFS) problem solving with migrating birds optimization (MBO) algorithm. Mathematics and Statistics 8(2A): 58-62.  Pratiwi Y E Kusbudiono K Riski A Hadi A F. 2020. Hybrid flow-shop scheduling (HFS) problem solving with migrating birds optimization (MBO) algorithm. Mathematics and Statistics 8(2A): 58-62.","DOI":"10.13189\/ms.2020.081310"},{"key":"e_1_3_2_1_4_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2016.06.161"},{"issue":"1","key":"e_1_3_2_1_5_1","first-page":"1","article-title":"Discrete imperialist competitive algorithm for the resource-constrained hybrid flowshop problem with energy consumption","volume":"7","author":"Tao X R","year":"2020","unstructured":"Tao X R , Li J Q , Huang T H , Duan P. 2020 . Discrete imperialist competitive algorithm for the resource-constrained hybrid flowshop problem with energy consumption . Complex & Intelligent Systems , 7 ( 1 ): 1 - 16 . Tao X R, Li J Q, Huang T H, Duan P. 2020. Discrete imperialist competitive algorithm for the resource-constrained hybrid flowshop problem with energy consumption. Complex & Intelligent Systems, 7(1): 1-16.","journal-title":"Complex & Intelligent Systems"},{"key":"e_1_3_2_1_6_1","doi-asserted-by":"publisher","DOI":"10.1088\/1757-899X\/504\/1\/012108"},{"key":"e_1_3_2_1_7_1","doi-asserted-by":"crossref","unstructured":"Shao W S Shao Z S Pi D C. 2021. Multi-objective evolutionary algorithm based on multiple neighborhoods local search for multi-objective distributed hybrid flow shop scheduling problem. Expert Systems with Applications \u00a0183.  Shao W S Shao Z S Pi D C. 2021. Multi-objective evolutionary algorithm based on multiple neighborhoods local search for multi-objective distributed hybrid flow shop scheduling problem. Expert Systems with Applications \u00a0183.","DOI":"10.1016\/j.eswa.2021.115453"},{"key":"e_1_3_2_1_8_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.rcim.2019.04.006"},{"key":"e_1_3_2_1_9_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2018.02.004"},{"key":"e_1_3_2_1_10_1","first-page":"143","article-title":"Two-level imperialist competitive algorithm for energy-efficient hybrid flow shop scheduling problem with rela-tive importance of objectives","volume":"59","author":"Li M","year":"2019","unstructured":"Li M , Lei D M , Cai J C . 2019 . Two-level imperialist competitive algorithm for energy-efficient hybrid flow shop scheduling problem with rela-tive importance of objectives . Robotics and Computer-Integrated Manufacturing , 59 : 143 - 157 . Li M, Lei D M, Cai J C. 2019. Two-level imperialist competitive algorithm for energy-efficient hybrid flow shop scheduling problem with rela-tive importance of objectives. Robotics and Computer-Integrated Manufacturing, 59: 143-157.","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"key":"e_1_3_2_1_11_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2013.01.028"},{"key":"e_1_3_2_1_12_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.848492"},{"key":"e_1_3_2_1_13_1","doi-asserted-by":"crossref","unstructured":"Yuan M Li Y Zhang L Pei F. 2021. Research on intelligent workshop resource scheduling method based on improved NSGA-II algorithm. Robotics and Computer-Integrated Manufacturing 71.  Yuan M Li Y Zhang L Pei F. 2021. Research on intelligent workshop resource scheduling method based on improved NSGA-II algorithm. Robotics and Computer-Integrated Manufacturing 71.","DOI":"10.1016\/j.rcim.2021.102141"},{"issue":"05","key":"e_1_3_2_1_14_1","first-page":"1075","article-title":"Sustainable scheduling for hybrid flow-shop based on performance matching of machine tools","volume":"25","author":"Kong L","year":"2019","unstructured":"Kong L , Wang L M , Li F Y , Liu X Y , Wang G. 2019 . Sustainable scheduling for hybrid flow-shop based on performance matching of machine tools . Computer Integrated Manufacturing Systems , 25 ( 05 ): 1075 - 1085 . Kong L, Wang L M, Li F Y, Liu X Y, Wang G. 2019. Sustainable scheduling for hybrid flow-shop based on performance matching of machine tools. Computer Integrated Manufacturing Systems, 25(05): 1075-1085.","journal-title":"Computer Integrated Manufacturing Systems"},{"issue":"11","key":"e_1_3_2_1_15_1","first-page":"1344","article-title":"Research on Multi-objective Green Flexible Job-shop Scheduling Based on Improved ABC Algorithm","volume":"31","author":"Huang W X","year":"2020","unstructured":"LI Y B, Huang W X , Wu R. 2020 . Research on Multi-objective Green Flexible Job-shop Scheduling Based on Improved ABC Algorithm . China Mechanical Engineering , 31 ( 11 ): 1344 - 1350 +1385. LI Y B, Huang W X, Wu R. 2020. Research on Multi-objective Green Flexible Job-shop Scheduling Based on Improved ABC Algorithm. China Mechanical Engineering, 31(11): 1344-1350+1385.","journal-title":"China Mechanical Engineering"}],"event":{"name":"RICAI 2022: 2022 4th International Conference on Robotics, Intelligent Control and Artificial Intelligence","acronym":"RICAI 2022","location":"Dongguan China"},"container-title":["Proceedings of the 2022 4th International Conference on Robotics, Intelligent Control and Artificial Intelligence"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3584376.3584573","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3584376.3584573","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T17:51:43Z","timestamp":1750182703000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3584376.3584573"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,12,16]]},"references-count":15,"alternative-id":["10.1145\/3584376.3584573","10.1145\/3584376"],"URL":"https:\/\/doi.org\/10.1145\/3584376.3584573","relation":{},"subject":[],"published":{"date-parts":[[2022,12,16]]},"assertion":[{"value":"2023-04-19","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}