{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,13]],"date-time":"2026-06-13T01:17:04Z","timestamp":1781313424180,"version":"3.54.1"},"reference-count":177,"publisher":"Association for Computing Machinery (ACM)","issue":"14s","license":[{"start":{"date-parts":[[2023,7,17]],"date-time":"2023-07-17T00:00:00Z","timestamp":1689552000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"funder":[{"DOI":"10.13039\/501100001809","name":"Natural Science Foundation of China","doi-asserted-by":"crossref","award":["62272170"],"award-info":[{"award-number":["62272170"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"crossref"}]},{"name":"Shanghai Trusted Industry Internet Software Collaborative Innovation Center, Shanghai Gaofeng & Gaoyuan Project for University Academic Program Development"},{"name":"\u201cDigital Silk Road\u201d Shanghai International Joint Lab of Trustworthy Intelligent Software","award":["22510750100"],"award-info":[{"award-number":["22510750100"]}]}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":["ACM Comput. Surv."],"published-print":{"date-parts":[[2023,12,31]]},"abstract":"<jats:p>As one of the most complex parts in manufacturing systems, scheduling plays an important role in the efficient allocation of resources to meet individual customization requirements. However, due to the uncertain disruptions (e.g., task arrival time, service breakdown duration) of manufacturing processes, how to respond to various dynamics in manufacturing to keep the scheduling process moving forward smoothly and efficiently is becoming a major challenge in dynamic manufacturing scheduling. To solve such a problem, a wide spectrum of artificial intelligence techniques have been developed to (1) accurately construct dynamic scheduling models that can represent both personalized customer needs and uncertain provider capabilities and (2) efficiently obtain a qualified schedule within a limited time. From these two perspectives, this article systemically makes a state-of-the-art literature survey on the application of these artificial intelligence techniques in dynamic manufacturing modeling and scheduling. It first introduces two types of dynamic scheduling problems that consider service- and task-related disruptions in the manufacturing process, respectively, followed by a bibliometric analysis of artificial intelligence techniques for dynamic manufacturing scheduling. Next, various kinds of artificial-intelligence-enabled schedulers for solving dynamic scheduling problems including both directed heuristics and autonomous learning methods are reviewed, which strive not only to quickly obtain optimized solutions but also to effectively achieve the adaption to dynamics. Finally, this article further elaborates on the future opportunities and challenges of using artificial-intelligence-enabled schedulers to solve complex dynamic scheduling problems. In summary, this survey aims to present a thorough and organized overview of artificial-intelligence-enabled dynamic manufacturing scheduling and shed light on some related research directions that are worth studying in the future.<\/jats:p>","DOI":"10.1145\/3590163","type":"journal-article","created":{"date-parts":[[2023,4,1]],"date-time":"2023-04-01T11:59:43Z","timestamp":1680350383000},"page":"1-36","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":35,"title":["A Survey of AI-enabled Dynamic Manufacturing Scheduling: From Directed Heuristics to Autonomous Learning"],"prefix":"10.1145","volume":"55","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-3924-5107","authenticated-orcid":false,"given":"Jiepin","family":"Ding","sequence":"first","affiliation":[{"name":"East China Normal University, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3922-0989","authenticated-orcid":false,"given":"Mingsong","family":"Chen","sequence":"additional","affiliation":[{"name":"East China Normal University, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7223-8849","authenticated-orcid":false,"given":"Ting","family":"Wang","sequence":"additional","affiliation":[{"name":"East China Normal University, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7734-4077","authenticated-orcid":false,"given":"Junlong","family":"Zhou","sequence":"additional","affiliation":[{"name":"Nanjing University of Science and Technology, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9458-4769","authenticated-orcid":false,"given":"Xin","family":"Fu","sequence":"additional","affiliation":[{"name":"University of Houston, United States"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5224-4048","authenticated-orcid":false,"given":"Keqin","family":"Li","sequence":"additional","affiliation":[{"name":"State University of New York, United States"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"320","published-online":{"date-parts":[[2023,7,17]]},"reference":[{"key":"e_1_3_1_2_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2021.10.006"},{"issue":"3","key":"e_1_3_1_3_2","doi-asserted-by":"crossref","first-page":"45","DOI":"10.3390\/asi4030045","article-title":"Industry 5.0: The prelude to the sixth industrial revolution","volume":"4","author":"Nardo M. D.","year":"2021","unstructured":"M. D. Nardo and H. Yu. 2021. Industry 5.0: The prelude to the sixth industrial revolution.Applied System Innovation 4, 3 (2021), 45.","journal-title":"Applied System Innovation"},{"key":"e_1_3_1_4_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10462-018-9667-6"},{"key":"e_1_3_1_5_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1449978"},{"key":"e_1_3_1_6_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2015.08.002"},{"key":"e_1_3_1_7_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2017.05.010"},{"key":"e_1_3_1_8_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2013.02.042"},{"key":"e_1_3_1_9_2","doi-asserted-by":"publisher","DOI":"10.5267\/j.ijiec.2020.1.003"},{"key":"e_1_3_1_10_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2019.01.063"},{"key":"e_1_3_1_11_2","doi-asserted-by":"crossref","first-page":"753","DOI":"10.1007\/978-981-13-7403-6_66","article-title":"Scheduling in cloud computing environment using metaheuristic techniques: A survey","volume":"937","author":"Singh H.","year":"2019","unstructured":"H. Singh, S. Tyagi, and P. Kumar. 2019. Scheduling in cloud computing environment using metaheuristic techniques: A survey.Emerging Technology in Modelling and Graphics 937 (2019), 753\u2013763.","journal-title":"Emerging Technology in Modelling and Graphics"},{"key":"e_1_3_1_12_2","doi-asserted-by":"publisher","DOI":"10.1017\/S0890060413000516"},{"key":"e_1_3_1_13_2","first-page":"1775","article-title":"A framework for scheduling in cloud manufacturing with deep reinforcement learning","author":"Liu Y.","year":"2019","unstructured":"Y. Liu, L. Zhang, L. Wang, Y. Xiao, X. Xu, and M. Wang. 2019. A framework for scheduling in cloud manufacturing with deep reinforcement learning. In Proceedings of the 17th IEEE International Conference on Industrial Informatics (INDIN\u201919), 1775\u20131780.","journal-title":"I"},{"key":"e_1_3_1_14_2","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(93)90182-M"},{"key":"e_1_3_1_15_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(97)00019-2"},{"key":"e_1_3_1_16_2","doi-asserted-by":"publisher","DOI":"10.1109\/TSMCC.2002.1009117"},{"key":"e_1_3_1_17_2","doi-asserted-by":"publisher","DOI":"10.1109\/70.282537"},{"key":"e_1_3_1_18_2","doi-asserted-by":"publisher","DOI":"10.5555\/160231.160247"},{"key":"e_1_3_1_19_2","doi-asserted-by":"publisher","DOI":"10.1080\/17517575.2019.1656290"},{"key":"e_1_3_1_20_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2020.113545"},{"key":"e_1_3_1_21_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-008-0090-8"},{"key":"e_1_3_1_22_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2018.05.022"},{"key":"e_1_3_1_23_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2011.04.020"},{"key":"e_1_3_1_24_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2016.03.009"},{"key":"e_1_3_1_25_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2018.05.056"},{"key":"e_1_3_1_26_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-013-5469-9"},{"key":"e_1_3_1_27_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-009-2322-2"},{"key":"e_1_3_1_28_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10696-017-9302-x"},{"key":"e_1_3_1_29_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2011.10.003"},{"key":"e_1_3_1_30_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2022.117380"},{"key":"e_1_3_1_31_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2013.09.013"},{"key":"e_1_3_1_32_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2013.05.023"},{"key":"e_1_3_1_33_2","doi-asserted-by":"publisher","DOI":"10.1109\/LRA.2022.3184795"},{"key":"e_1_3_1_34_2","doi-asserted-by":"publisher","DOI":"10.1088\/1742-6596\/1848\/1\/012029"},{"key":"e_1_3_1_35_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2016.06.018"},{"key":"e_1_3_1_36_2","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2020.3029868"},{"key":"e_1_3_1_37_2","first-page":"75","article-title":"A reinforcement learning approach to parameter estimation in dynamic job shop scheduling","volume":"110","author":"Shahrabi J.","year":"2017","unstructured":"J. Shahrabi, M. Adibi, and M. Mahootchi. 2017. A reinforcement learning approach to parameter estimation in dynamic job shop scheduling. IEEE Robotics and Automation Letters 110 (2017), 75\u201382.","journal-title":"IEEE Robotics and Automation Letters"},{"key":"e_1_3_1_38_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00500-015-1615-7"},{"key":"e_1_3_1_39_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-017-1295-5"},{"key":"e_1_3_1_40_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1535205"},{"key":"e_1_3_1_41_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2020.106208"},{"key":"e_1_3_1_42_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2020.02.004"},{"key":"e_1_3_1_43_2","first-page":"1","article-title":"A centralized reinforcement learning approach for proactive scheduling in manufacturing","author":"Qu S.","year":"2015","unstructured":"S. Qu, T. Chu, J. Wang, J. Leckie, and W. Jian. 2015. A centralized reinforcement learning approach for proactive scheduling in manufacturing. In Proceedings of the 20th IEEE Conference on Emerging Technologies & Factory Automation (ETFA\u201915), (1\u20138).","journal-title":"Proceedings of the 20th IEEE Conference on Emerging Technologies & Factory Automation (ETFA\u201915)"},{"key":"e_1_3_1_44_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-018-2146-z"},{"key":"e_1_3_1_45_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-012-4245-6"},{"key":"e_1_3_1_46_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2020.120009"},{"key":"e_1_3_1_47_2","doi-asserted-by":"publisher","DOI":"10.1109\/TEM.2017.2712611"},{"key":"e_1_3_1_48_2","doi-asserted-by":"publisher","DOI":"10.1109\/TASE.2013.2265917"},{"key":"e_1_3_1_49_2","doi-asserted-by":"publisher","DOI":"10.5555\/1287844.1288014"},{"key":"e_1_3_1_50_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2015.1005771"},{"key":"e_1_3_1_51_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.rcim.2010.04.005"},{"key":"e_1_3_1_52_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(96)00083-5"},{"key":"e_1_3_1_53_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2016.1165358"},{"key":"e_1_3_1_54_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2020.104964"},{"key":"e_1_3_1_55_2","unstructured":"L. Perron and V. Furnon. 2019. Or-tools. https:\/\/developers.google.cn\/optimization?hl=zh-cn."},{"key":"e_1_3_1_56_2","doi-asserted-by":"publisher","DOI":"10.1109\/TASE.2018.2852722"},{"key":"e_1_3_1_57_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2020.12.021"},{"key":"e_1_3_1_58_2","doi-asserted-by":"publisher","DOI":"10.1145\/3467477"},{"key":"e_1_3_1_59_2","doi-asserted-by":"publisher","DOI":"10.2478\/jagi-2019-0002"},{"key":"e_1_3_1_60_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-017-1350-2"},{"issue":"11","key":"e_1_3_1_61_2","first-page":"159","article-title":"Improved NSGA-II for the multiobjective flexible job-shop scheduling problem","volume":"46","author":"Zhang C.","year":"2010","unstructured":"C. Zhang, X. Dong, X. Wang, X. Li, and Q. Liu. 2010. Improved NSGA-II for the multiobjective flexible job-shop scheduling problem.Journal of Engineering Mechanics 46, 11 (2010), 159\u2013163.","journal-title":"Journal of Engineering Mechanics"},{"key":"e_1_3_1_62_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jii.2021.100293"},{"key":"e_1_3_1_63_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-009-2379-y"},{"key":"e_1_3_1_64_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2019.10.002"},{"key":"e_1_3_1_65_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2014.881575"},{"key":"e_1_3_1_66_2","doi-asserted-by":"publisher","DOI":"10.1109\/ICNN.1995.488968"},{"key":"e_1_3_1_67_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.106649"},{"key":"e_1_3_1_68_2","doi-asserted-by":"publisher","DOI":"10.3390\/en13030668"},{"key":"e_1_3_1_69_2","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2017.2758380"},{"key":"e_1_3_1_70_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.swevo.2019.100594"},{"key":"e_1_3_1_71_2","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2019.2944247"},{"key":"e_1_3_1_72_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.knosys.2016.06.014"},{"key":"e_1_3_1_73_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2016.07.046"},{"key":"e_1_3_1_74_2","doi-asserted-by":"publisher","DOI":"10.1142\/S0217984918401139"},{"key":"e_1_3_1_75_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.knosys.2015.01.017"},{"key":"e_1_3_1_76_2","doi-asserted-by":"publisher","DOI":"10.3390\/app9224893"},{"key":"e_1_3_1_77_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-006-0662-8"},{"key":"e_1_3_1_78_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-018-1454-3"},{"key":"e_1_3_1_79_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.107082"},{"key":"e_1_3_1_80_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00500-016-2245-4"},{"key":"e_1_3_1_81_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1555650"},{"issue":"19","key":"e_1_3_1_82_2","first-page":"5809","article-title":"A knowledge-based cuckoo search algorithm to schedule a flexible job shop with sequencing flexibility","volume":"53","author":"Cao Z.","year":"2015","unstructured":"Z. Cao, C. Lin, and M. Zhou. 2015. A knowledge-based cuckoo search algorithm to schedule a flexible job shop with sequencing flexibility. IEEE Transactions on Automation Science and Engineering 53, 19 (2015), 5809\u20135825.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"key":"e_1_3_1_83_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2020.1870013"},{"issue":"10","key":"e_1_3_1_84_2","first-page":"1043","article-title":"A data-driven robust optimization method for the assembly job-shop scheduling problem under uncertainty","volume":"35","author":"Zheng P.","year":"2020","unstructured":"P. Zheng, P. Zhang, J. Wang, J. Zhang, C. Yang, and Y. Jin. 2020. A data-driven robust optimization method for the assembly job-shop scheduling problem under uncertainty. International Journal of Computer Integrated Manufacturing 35, 10\u201311 (2020), 1043\u20131058.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"key":"e_1_3_1_85_2","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(92)90012-9"},{"key":"e_1_3_1_86_2","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2020.2987820"},{"key":"e_1_3_1_87_2","doi-asserted-by":"publisher","DOI":"10.1126\/science.1127647"},{"key":"e_1_3_1_88_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2020.12.015"},{"key":"e_1_3_1_89_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.comnet.2021.107969"},{"issue":"1","key":"e_1_3_1_90_2","first-page":"73","article-title":"Uncertainty analysis of an industrial system using intuitionistic fuzzy set theory","volume":"7","author":"Vishwakarma Y.","year":"2016","unstructured":"Y. Vishwakarma and S. Sharma. 2016. Uncertainty analysis of an industrial system using intuitionistic fuzzy set theory. International Journal of System Assurance Engineering and Management 7, 1 (2016), 73\u201383.","journal-title":"International Journal of System Assurance Engineering and Management"},{"key":"e_1_3_1_91_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2016.07.034"},{"key":"e_1_3_1_92_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.knosys.2020.106056"},{"key":"e_1_3_1_93_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00500-020-04940-6"},{"key":"e_1_3_1_94_2","doi-asserted-by":"publisher","DOI":"10.1109\/FUZZ-IEEE.2015.7338103"},{"key":"e_1_3_1_95_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2019.11.005"},{"key":"e_1_3_1_96_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2017.01.039"},{"key":"e_1_3_1_97_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1400706"},{"key":"e_1_3_1_98_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.793425"},{"key":"e_1_3_1_99_2","doi-asserted-by":"publisher","DOI":"10.1109\/TEM.2017.2785774"},{"key":"e_1_3_1_100_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.knosys.2020.105536"},{"key":"e_1_3_1_101_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2018.10.008"},{"key":"e_1_3_1_102_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2015.04.029"},{"key":"e_1_3_1_103_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-017-1170-8"},{"key":"e_1_3_1_104_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2014.11.036"},{"key":"e_1_3_1_105_2","doi-asserted-by":"publisher","DOI":"10.1002\/nav.20488"},{"key":"e_1_3_1_106_2","doi-asserted-by":"publisher","DOI":"10.1080\/01605682.2019.1630330"},{"key":"e_1_3_1_107_2","doi-asserted-by":"publisher","DOI":"10.1057\/jors.2014.100"},{"key":"e_1_3_1_108_2","doi-asserted-by":"publisher","DOI":"10.1080\/07408179408966626"},{"key":"e_1_3_1_109_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2013.03.004"},{"key":"e_1_3_1_110_2","article-title":"Robust scheduling and dispatching rules for high-mix collaborative manufacturing systems","author":"Zanchettin A.","year":"2021","unstructured":"A. Zanchettin. 2021. Robust scheduling and dispatching rules for high-mix collaborative manufacturing systems. Flexible Services and Manufacturing Journal (2021), 1\u201324.","journal-title":"Flexible Services and Manufacturing Journal"},{"key":"e_1_3_1_111_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2018.07.007"},{"key":"e_1_3_1_112_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2014.04.013"},{"key":"e_1_3_1_113_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-005-0237-0"},{"key":"e_1_3_1_114_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1456700"},{"key":"e_1_3_1_115_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.106984"},{"key":"e_1_3_1_116_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2016.1213445"},{"key":"e_1_3_1_117_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-008-1479-4"},{"key":"e_1_3_1_118_2","doi-asserted-by":"publisher","DOI":"10.1080\/21681015.2017.1360405"},{"key":"e_1_3_1_119_2","doi-asserted-by":"publisher","DOI":"10.5555\/2543796.2543802"},{"key":"e_1_3_1_120_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2020.118420"},{"key":"e_1_3_1_121_2","doi-asserted-by":"publisher","DOI":"10.1109\/TMECH.2020.2996911"},{"key":"e_1_3_1_122_2","first-page":"335","article-title":"Application of an effective modified gravitational search algorithm for the coordinated scheduling problem in a two-stage supply chain","volume":"70","author":"Pei J.","year":"2014","unstructured":"J. Pei, X. Liu, P. Pardalos, W. Fan, S. Yang, and L. Wang. 2014. Application of an effective modified gravitational search algorithm for the coordinated scheduling problem in a two-stage supply chain.International Journal of Production Research 70 (2014), 335\u2013348.","journal-title":"International Journal of Production Research"},{"key":"e_1_3_1_123_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-016-8408-8"},{"key":"e_1_3_1_124_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2015.09.005"},{"key":"e_1_3_1_125_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.571456"},{"key":"e_1_3_1_126_2","article-title":"Variable neighbourhood search and mathematical programming for just-in-time job-shop scheduling problem","volume":"2014","author":"Wang S.","year":"2014","unstructured":"S. Wang and Y. Li. 2014. Variable neighbourhood search and mathematical programming for just-in-time job-shop scheduling problem. Mathematical Problems in Engineering 2014 (2014), 431325.","journal-title":"Mathematical Problems in Engineering"},{"key":"e_1_3_1_127_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2020.04.017"},{"key":"e_1_3_1_128_2","author":"Pinedo M.","unstructured":"M. Pinedo and K Hadavi. Scheduling: Theory, Algorithms and Systems Development. Heidelberg: Spinger.","journal-title":"Scheduling: Theory, Algorithms and Systems Development"},{"key":"e_1_3_1_129_2","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1145\/2380356.2380376","article-title":"Flattening hierarchical scheduling","author":"Lackorzy\u0144ski A.","year":"2012","unstructured":"A. Lackorzy\u0144ski, A. Warg, M. V\u00f6lp, and H. H\u00e4rtig. 2012. Flattening hierarchical scheduling. In Proceedings of the 10th ACM International Conference on Embedded Software, 93\u2013102.","journal-title":"Proceedings of the 10th ACM International Conference on Embedded Software,"},{"key":"e_1_3_1_130_2","doi-asserted-by":"publisher","DOI":"10.4018\/ijssci.2013010105"},{"key":"e_1_3_1_131_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.sysarc.2018.01.005"},{"key":"e_1_3_1_132_2","doi-asserted-by":"publisher","DOI":"10.1080\/0951192X.2017.1413252"},{"key":"e_1_3_1_133_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.tre.2018.04.002"},{"key":"e_1_3_1_134_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2019.102898"},{"key":"e_1_3_1_135_2","first-page":"1","article-title":"Assessment of financial risk in the design and scheduling of multipurpose plants under demand uncertainty","volume":"5","author":"Vieira M.","year":"2020","unstructured":"M. Vieira, H. Paulo, T. Pinto-Varela, and A. Barbosa-P\u00f3voa. 2020. Assessment of financial risk in the design and scheduling of multipurpose plants under demand uncertainty.International Journal of Production Research 5 (2020), 1\u201321.","journal-title":"International Journal of Production Research"},{"key":"e_1_3_1_136_2","first-page":"1","article-title":"Due-date quotation model for manufacturing system scheduling under uncertainty","volume":"4","author":"Wang Z.","year":"2021","unstructured":"Z. Wang, T. Ng, and C. Pang. 2021. Due-date quotation model for manufacturing system scheduling under uncertainty. Discrete Event Dynamic Systems 4 (2021), 1\u201323.","journal-title":"Discrete Event Dynamic Systems"},{"key":"e_1_3_1_137_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2013.07.015"},{"key":"e_1_3_1_138_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2018.03.039"},{"key":"e_1_3_1_139_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2020.07.004"},{"key":"e_1_3_1_140_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2012.03.020"},{"key":"e_1_3_1_141_2","doi-asserted-by":"publisher","DOI":"10.3390\/a12110222"},{"key":"e_1_3_1_142_2","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2019.2908210"},{"key":"e_1_3_1_143_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.procir.2020.05.163"},{"key":"e_1_3_1_144_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2020.07.001"},{"key":"e_1_3_1_145_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2019.02.013"},{"key":"e_1_3_1_146_2","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2020.2964955"},{"key":"e_1_3_1_147_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-020-01612-y"},{"key":"e_1_3_1_148_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0924-0136(03)00093-1"},{"key":"e_1_3_1_149_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2004.08.018"},{"key":"e_1_3_1_150_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207540701846236"},{"key":"e_1_3_1_151_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10489-018-1343-7"},{"issue":"3","key":"e_1_3_1_152_2","first-page":"231","article-title":"Simulation study of dispatching rules in stochastic job shop dynamic scheduling","volume":"10","author":"Silva E.","year":"2014","unstructured":"E. Silva, M. Costa, M. Silva, and F. Pereira. 2014. Simulation study of dispatching rules in stochastic job shop dynamic scheduling. World Journal of Modelling and Simulation 10, 3 (2014), 231\u2013240.","journal-title":"World Journal of Modelling and Simulation"},{"key":"e_1_3_1_153_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2009.03.008"},{"key":"e_1_3_1_154_2","doi-asserted-by":"publisher","DOI":"10.1080\/0020754031000118099"},{"key":"e_1_3_1_155_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.rcim.2004.07.003"},{"key":"e_1_3_1_156_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2016.07.030"},{"key":"e_1_3_1_157_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207541003794884"},{"key":"e_1_3_1_158_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0921-8890(00)00087-7"},{"key":"e_1_3_1_159_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207540903307581"},{"key":"e_1_3_1_160_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-006-5591-8"},{"key":"e_1_3_1_161_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2012.10.016"},{"key":"e_1_3_1_162_2","doi-asserted-by":"publisher","DOI":"10.1007\/s12559-018-9595-4"},{"key":"e_1_3_1_163_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00500-020-04931-7"},{"key":"e_1_3_1_164_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-006-0465-y"},{"key":"e_1_3_1_165_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10257-018-0378-y"},{"key":"e_1_3_1_166_2","first-page":"22","article-title":"Multi-agent reinforcement learning for job shop scheduling in flexible manufacturing systems","author":"Baer S.","year":"2019","unstructured":"S. Baer, J. Bakakeu, R. Meyes, and T. Meisen. 2019. Multi-agent reinforcement learning for job shop scheduling in flexible manufacturing systems. In 2019 Second International Conference on Artificial Intelligence for Industries (AI4I\u201919), 22\u201325.","journal-title":"2019 Second International Conference on Artificial Intelligence for Industries (AI4I\u201919),"},{"issue":"3","key":"e_1_3_1_167_2","first-page":"1420","article-title":"A reinforcement learning approach to robust scheduling of semiconductor manufacturing facilities","volume":"17","author":"Park I.","year":"2020","unstructured":"I. Park, J. Huh, J. Kim, and J. Park. 2020. A reinforcement learning approach to robust scheduling of semiconductor manufacturing facilities.IEEE Transactions on Automation Science and Engineering 17, 3 (2020), 1420\u20131431.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"key":"e_1_3_1_168_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2020.115473"},{"key":"e_1_3_1_169_2","first-page":"433","article-title":"Dynamic scheduling in large-scale stochastic processing networks for demand-driven manufacturing using distributed reinforcement learning","author":"Qu S.","year":"2018","unstructured":"S. Qu, J. Wang, and J. Jasperneite. 2018. Dynamic scheduling in large-scale stochastic processing networks for demand-driven manufacturing using distributed reinforcement learning. In IEEE 23rd International Conference on Emerging Technologies and Factory Automation (ETFA\u201918), 433\u2013440.","journal-title":"IEEE 23rd International Conference on Emerging Technologies and Factory Automation (ETFA\u201918),"},{"key":"e_1_3_1_170_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.571443"},{"key":"e_1_3_1_171_2","doi-asserted-by":"publisher","DOI":"10.1007\/s11740-018-0855-7"},{"key":"e_1_3_1_172_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jpdc.2017.05.001"},{"key":"e_1_3_1_173_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2019.04.056"},{"key":"e_1_3_1_174_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-019-03940-7"},{"issue":"9","key":"e_1_3_1_175_2","first-page":"107340","article-title":"A cloud resource management framework for multiple online scientific workflows using cooperative reinforcement learning agents","volume":"179","author":"Asghari A.","year":"2019","unstructured":"A. Asghari, M. Sohrabi, and F. Yaghmaee. 2019. A cloud resource management framework for multiple online scientific workflows using cooperative reinforcement learning agents. Computer Networks 179, 9 (2019), 107340.","journal-title":"Computer Networks"},{"key":"e_1_3_1_176_2","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2902846"},{"key":"e_1_3_1_177_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1535205"},{"key":"e_1_3_1_178_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2020.11.004"}],"container-title":["ACM Computing Surveys"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3590163","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3590163","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T16:36:26Z","timestamp":1750178186000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3590163"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,7,17]]},"references-count":177,"journal-issue":{"issue":"14s","published-print":{"date-parts":[[2023,12,31]]}},"alternative-id":["10.1145\/3590163"],"URL":"https:\/\/doi.org\/10.1145\/3590163","relation":{},"ISSN":["0360-0300","1557-7341"],"issn-type":[{"value":"0360-0300","type":"print"},{"value":"1557-7341","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,7,17]]},"assertion":[{"value":"2021-08-16","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2023-02-14","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2023-07-17","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}