{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,25]],"date-time":"2026-04-25T15:26:54Z","timestamp":1777130814214,"version":"3.51.4"},"publisher-location":"New York, NY, USA","reference-count":4,"publisher":"ACM","license":[{"start":{"date-parts":[[2023,12,9]],"date-time":"2023-12-09T00:00:00Z","timestamp":1702080000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2023,12,9]]},"DOI":"10.1145\/3632314.3632350","type":"proceedings-article","created":{"date-parts":[[2023,12,8]],"date-time":"2023-12-08T17:11:53Z","timestamp":1702055513000},"page":"1-5","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":1,"title":["Resource Optimization Method based on CPU-FPGA Mixed-Step Real-Time Simulation"],"prefix":"10.1145","author":[{"ORCID":"https:\/\/orcid.org\/0009-0004-3201-0569","authenticated-orcid":false,"given":"Qingsheng","family":"Li","sequence":"first","affiliation":[{"name":"Guizhou Power Grid Co., Ltd, Power Grid Planning Research Center, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0002-3818-1620","authenticated-orcid":false,"given":"Zhen","family":"Li","sequence":"additional","affiliation":[{"name":"Guizhou Power Grid Co., Ltd, Power Grid Planning Research Center, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0008-8746-3134","authenticated-orcid":false,"given":"Jiahuan","family":"Long","sequence":"additional","affiliation":[{"name":"Guizhou Power Grid Co., Ltd, Power Grid Planning Research Center, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0008-1823-5701","authenticated-orcid":false,"given":"Shunji","family":"Yang","sequence":"additional","affiliation":[{"name":"Guizhou Power Grid Co., Ltd, Power Grid Planning Research Center, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0008-2254-999X","authenticated-orcid":false,"given":"Yujie","family":"Yang","sequence":"additional","affiliation":[{"name":"College of Electrical Engineering, GuiZhou University, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2023,12,9]]},"reference":[{"key":"e_1_3_2_1_1_1","volume-title":"Power System Protection and Control","author":"Feiyang LIU","year":"2022","unstructured":"LIU Feiyang , Zeng Ping , Li Zheng . Transient stability analysis of full power wind farm units under power grid failure[J] . Power System Protection and Control , 2022 , v. 50; No. 599(05): 43-54. LIU Feiyang, Zeng Ping, Li Zheng. Transient stability analysis of full power wind farm units under power grid failure[J]. Power System Protection and Control, 2022, v. 50; No. 599(05): 43-54."},{"key":"e_1_3_2_1_2_1","first-page":"12","volume":"2022","author":"Rongbo ZHENG","unstructured":"ZHENG Rongbo , HAO Zhenghang , CEN Zhuo . Real-time simulation algorithm of hybrid step size for distributed generation system based on FPGA[J]. Southern Power System Technology , 2022 ,16(10): 12 - 19 . ZHENG Rongbo, HAO Zhenghang, CEN Zhuo. Real-time simulation algorithm of hybrid step size for distributed generation system based on FPGA[J]. Southern Power System Technology,2022,16(10): 12-19.","journal-title":"Southern Power System Technology"},{"key":"e_1_3_2_1_3_1","first-page":"9","volume":"222","author":"Shenghu Li","unstructured":"Li Shenghu , Zhou Huimin , Tao Diwen , Short-term Reliability Evaluation of UHVDC Converter Station Based on Transient Hier-archical Equivalent Algorithm [J]. Southern Power System Technology , 222 ,16(05): 9 - 18 Li Shenghu, Zhou Huimin, Tao Diwen, Short-term Reliability Evaluation of UHVDC Converter Station Based on Transient Hier-archical Equivalent Algorithm [J]. Southern Power System Technology, 222,16(05):9-18","journal-title":"Southern Power System Technology"},{"issue":"01","key":"e_1_3_2_1_4_1","first-page":"28","volume":"39","author":"Yibo XIAO","year":"2023","unstructured":"XIAO Yibo , HAO Zhenghang , CHEN Zhuo , CHEN Xiangping . Multi-rate Real-time Simulation of Permanent Magnet Direct Drive Fan System Based on CPU-FPGA[J]. Electric Power Science and Engineering , 2023 , 39 ( 01 ): 28 - 36 XIAO Yibo, HAO Zhenghang, CHEN Zhuo, CHEN Xiangping. Multi-rate Real-time Simulation of Permanent Magnet Direct Drive Fan System Based on CPU-FPGA[J]. Electric Power Science and Engineering, 2023, 39(01):28-36","journal-title":"Electric Power Science and Engineering"}],"event":{"name":"ISIA 2023: 2023 International Conference on Intelligent Sensing and Industrial Automation","location":"Virtual Event China","acronym":"ISIA 2023"},"container-title":["2023 International Conference on Intelligent Sensing and Industrial Automation"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3632314.3632350","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T16:45:42Z","timestamp":1750178742000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3632314.3632350"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,12,9]]},"references-count":4,"alternative-id":["10.1145\/3632314.3632350","10.1145\/3632314"],"URL":"https:\/\/doi.org\/10.1145\/3632314.3632350","relation":{},"subject":[],"published":{"date-parts":[[2023,12,9]]},"assertion":[{"value":"2023-12-09","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}