{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,29]],"date-time":"2025-08-29T18:10:10Z","timestamp":1756491010054,"version":"3.44.0"},"publisher-location":"New York, NY, USA","reference-count":19,"publisher":"ACM","license":[{"start":{"date-parts":[[2023,12,22]],"date-time":"2023-12-22T00:00:00Z","timestamp":1703203200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2023,12,22]]},"DOI":"10.1145\/3639631.3639643","type":"proceedings-article","created":{"date-parts":[[2024,2,16]],"date-time":"2024-02-16T06:08:33Z","timestamp":1708063713000},"page":"63-73","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Index system and method of power grid risk assessment with participation of adjustable source and load resources"],"prefix":"10.1145","author":[{"ORCID":"https:\/\/orcid.org\/0009-0004-2619-9780","authenticated-orcid":false,"given":"Xinlei","family":"Cai","sequence":"first","affiliation":[{"name":"Power Dispatching and Controlling Center of Guangdong Power Grid Company Limited, Guangdong Power Grid Company Limited, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0008-0049-0915","authenticated-orcid":false,"given":"Jiale","family":"Liu","sequence":"additional","affiliation":[{"name":"Power Dispatching and Controlling Center of Guangdong Power Grid Company Limited, Guangdong Power Grid Company Limited, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0008-4029-1929","authenticated-orcid":false,"given":"Zhijun","family":"Wang","sequence":"additional","affiliation":[{"name":"Power Dispatching and Controlling Center of Guangdong Power Grid Company Limited, Guangdong Power Grid Company Limited, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0005-9504-4077","authenticated-orcid":false,"given":"Jue","family":"Hou","sequence":"additional","affiliation":[{"name":"Power Dispatching and Controlling Center of Guangdong Power Grid Company Limited, Guangdong Power Grid Company Limited, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2024,2,16]]},"reference":[{"key":"e_1_3_2_1_1_1","doi-asserted-by":"publisher","DOI":"10.19768\/j.cnki.dgjs.2022.10.043"},{"issue":"9","key":"e_1_3_2_1_2_1","first-page":"3","article-title":"Key scientific issues and theoretical research framework for power systems with high proportion of renewable energy [J]","volume":"41","author":"Chongqing Kang","year":"2017","unstructured":"Kang Chongqing, Yao Liangzhong. Key scientific issues and theoretical research framework for power systems with high proportion of renewable energy [J]. Automation of Electric Power Systems. 2017, 41(9): 3-11.","journal-title":"Automation of Electric Power Systems"},{"key":"e_1_3_2_1_3_1","volume-title":"Power System Risk Assessment Considering Extreme Weather Events [D].Jinan: Shandong University","author":"Lizheng Chen","year":"2018","unstructured":"Chen Lizheng. Power System Risk Assessment Considering Extreme Weather Events [D].Jinan: Shandong University, 2018."},{"issue":"12","key":"e_1_3_2_1_4_1","first-page":"60","article-title":"Risk assessment method for distribution network considering operation state in the scene of typhoon disaster [J]","volume":"30","author":"Yongming Wang","year":"2018","unstructured":"Wang Yongming, Yin Zili, Li lin, Risk assessment method for distribution network considering operation state in the scene of typhoon disaster [J]. Proceeding of the CSU-EPSA, 2018, 30(12): 60-65.","journal-title":"Proceeding of the CSU-EPSA"},{"key":"e_1_3_2_1_5_1","doi-asserted-by":"publisher","DOI":"10.1088\/1742-6596\/1771\/1\/012005"},{"key":"e_1_3_2_1_6_1","unstructured":"Tang Lei Shen Chen Zhang Xuemin. Impact of large-scale wind power centralized integration on transient angle stability of power systems\u2014Part II: Factors affecting transient angle stability [J]. Chinese journal of electrical engineering 2015 35(16): 4043-4051."},{"key":"e_1_3_2_1_7_1","doi-asserted-by":"publisher","DOI":"10.1007\/s42835-020-00412-x"},{"issue":"8","key":"e_1_3_2_1_8_1","first-page":"141","article-title":"Construction and application of power grid operation risk assessment and rating system [J]","volume":"39","author":"Yifeng Wang","year":"2015","unstructured":"Wang Yifeng, Tang Wei, Liu Ludeng, Construction and application of power grid operation risk assessment and rating system [J]. Automation of Electric Power Systems. 2015, 39(8): 141-148.","journal-title":"Automation of Electric Power Systems"},{"issue":"04","key":"e_1_3_2_1_9_1","first-page":"358","volume":"37","author":"Haoyu Shang","year":"2020","unstructured":"Shang Haoyu, Liu Tianqi, Bu Tao, Operational Risk Assessment of Power System Considering Wind Power and Photovoltaic Grid Connection [J]. Modern Electric Power, 2020, 37(04): 358-367.","journal-title":"Modern Electric Power"},{"issue":"11","key":"e_1_3_2_1_10_1","first-page":"3503","article-title":"Analysis and assessment of operation risk for power system with large-scale wind power integration [J]","volume":"40","author":"Jinghua Li","year":"2016","unstructured":"Li Jinghua, Zuo Junjun, Wang Sai. Analysis and assessment of operation risk for power system with large-scale wind power integration [J]. Power System Technology, 2016, 40(11): 3503-3513.","journal-title":"Power System Technology"},{"key":"e_1_3_2_1_11_1","doi-asserted-by":"publisher","unstructured":"Chen Rui Liu Shuo He Xianqiang Risk assessment and optimal dispatching considering source-network uncertainty [J]. Proceeding of the CSU-EPSA 1-10[2023-02-28]. DOI: 10.19635\/j. cnki. csu-epsa. 001094.","DOI":"10.19635\/j"},{"issue":"01","key":"e_1_3_2_1_12_1","first-page":"23","article-title":"A comprehensive evaluation index system of power grid security and benefit based on multi-operator fuzzy hierarchy evaluation method [J]","volume":"39","author":"Yongzheng Mu","year":"2015","unstructured":"Mu Yongzheng, Lu Zongxiang, Qiao Ying, A comprehensive evaluation index system of power grid security and benefit based on multi-operator fuzzy hierarchy evaluation method [J]. Power System Technology, 2015, 39(01): 23-28.","journal-title":"Power System Technology"},{"key":"e_1_3_2_1_13_1","unstructured":"Mao Tian Huang Ningxin Cheng Renli Construction of the benefit evaluation index system of virtual power plant and its example analysis [J]. Southern Power System Technology. 2022: 16(06): 124-131."},{"key":"e_1_3_2_1_14_1","doi-asserted-by":"publisher","unstructured":"Bin Junji Liao Kai Li Bo. High dimensional model and risk assessment of casading fault considering the randomness of source and load [J]. Proceeding of the CSU-EPSA 1-10[2023-02-28]. DOI:10.19635\/j. cnki. csu-epsa. 001118.","DOI":"10.19635\/j"},{"issue":"02","key":"e_1_3_2_1_15_1","first-page":"136","article-title":"Planning of energy storage system for power grid peaking shaving and frequency regulation based on AHP and CRITIC [J]","volume":"19","author":"Dexin Li","year":"2021","unstructured":"Li Dexin, Tian Chunguang, Lv Xiangyu, Planning of energy storage system for power grid peaking shaving and frequency regulation based on AHP and CRITIC [J]. Journal of Power Supply, 2021, 19(02): 136-141.","journal-title":"Journal of Power Supply"},{"issue":"6","key":"e_1_3_2_1_16_1","first-page":"764","volume":"45","author":"Yibin Tao","year":"2021","unstructured":"Tao Yibin, Xue Jinhua, Wang Deshun, Comprehensive Performance Evaluation of BESS for Power Grid Peaking and Frequency Regulation [J]. Power Technology, 2021, 45(6): 764-767.","journal-title":"Power Technology"},{"key":"e_1_3_2_1_17_1","doi-asserted-by":"publisher","DOI":"10.13335\/j.1000-3673.pst"},{"key":"e_1_3_2_1_18_1","unstructured":"Xing Yahong Meng Changhong Huang Qian Multi-objective two-layer planning of electric vehicle charging station considering wind-landscape output uncertainty [J]. Journal of taiyuan university of science and technology 1-11[2023-02-13]."},{"issue":"02","key":"e_1_3_2_1_19_1","first-page":"622","article-title":"Aggregation modeling based on markov chain and multi-mode control strategies of aggregated electric vehicles for frequency regulation [J]","volume":"46","author":"Kai Dong","year":"2022","unstructured":"Dong Kai, Cai Xinlei, Cui Yanlin, Aggregation modeling based on markov chain and multi-mode control strategies of aggregated electric vehicles for frequency regulation [J]. Power System Technology, 2022, 46(02): 622-634. DOI: 10.13335\/ j.1000-3673.pst.2021.0243.","journal-title":"Power System Technology"}],"event":{"name":"ACAI 2023: 2023 6th International Conference on Algorithms, Computing and Artificial Intelligence","acronym":"ACAI 2023","location":"Sanya China"},"container-title":["2023 6th International Conference on Algorithms Computing and Artificial Intelligence"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3639631.3639643","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3639631.3639643","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,8,29]],"date-time":"2025-08-29T17:39:49Z","timestamp":1756489189000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3639631.3639643"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,12,22]]},"references-count":19,"alternative-id":["10.1145\/3639631.3639643","10.1145\/3639631"],"URL":"https:\/\/doi.org\/10.1145\/3639631.3639643","relation":{},"subject":[],"published":{"date-parts":[[2023,12,22]]},"assertion":[{"value":"2024-02-16","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}