{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,7]],"date-time":"2026-03-07T17:57:44Z","timestamp":1772906264277,"version":"3.50.1"},"publisher-location":"New York, NY, USA","reference-count":22,"publisher":"ACM","license":[{"start":{"date-parts":[[2023,11,17]],"date-time":"2023-11-17T00:00:00Z","timestamp":1700179200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2023,11,17]]},"DOI":"10.1145\/3652628.3652670","type":"proceedings-article","created":{"date-parts":[[2024,5,23]],"date-time":"2024-05-23T10:36:46Z","timestamp":1716460606000},"page":"248-256","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":1,"title":["Multi-Constraint Flexible Job Scheduling Algorithm Based on DDQN: A Deep Reinforcement Learning Algorithm for Solving Practical Job Scheduling Problems"],"prefix":"10.1145","author":[{"ORCID":"https:\/\/orcid.org\/0009-0004-1894-5181","authenticated-orcid":false,"given":"Lin","family":"Liu","sequence":"first","affiliation":[{"name":"Hangzhou Zhiyuan Research Institute Co., Ltd., China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0000-7311-6563","authenticated-orcid":false,"given":"Zijing","family":"Liang","sequence":"additional","affiliation":[{"name":"Hangzhou Zhiyuan Research Institute Co., Ltd., China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0000-7274-0436","authenticated-orcid":false,"given":"Yifan","family":"Hong","sequence":"additional","affiliation":[{"name":"Hangzhou Zhiyuan Research Institute Co., Ltd., China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0003-0165-6423","authenticated-orcid":false,"given":"Ke","family":"Liu","sequence":"additional","affiliation":[{"name":"Hangzhou Zhiyuan Research Institute Co., Ltd., China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0001-2628-7092","authenticated-orcid":false,"given":"Hui","family":"Wang","sequence":"additional","affiliation":[{"name":"Hangzhou Zhiyuan Research Institute Co., Ltd., China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0001-8431-4247","authenticated-orcid":false,"given":"Penghui","family":"Shang","sequence":"additional","affiliation":[{"name":"Hangzhou Zhiyuan Research Institute Co., Ltd., China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2024,5,23]]},"reference":[{"issue":"06","key":"e_1_3_2_1_1_1","first-page":"3","article-title":"Current Situation and Future Paths of Green Manufacturing and Intelligent Manufacturing Development in China [J]","volume":"43","author":"Li Jinhua","year":"2022","unstructured":"Li Jinhua. Current Situation and Future Paths of Green Manufacturing and Intelligent Manufacturing Development in China [J]. Economic and Management Research, 2022, 43(06): 3-12.","journal-title":"Economic and Management Research"},{"issue":"06","key":"e_1_3_2_1_2_1","first-page":"184","volume":"27","author":"Huang Xuewen","year":"2018","unstructured":"Huang Xuewen, Zhang Xiaotong, Sun Rong, Flexible Scheduling Algorithm for Process Paths Based on Genetic Algorithm [J]. Operations Research and Management Science, 2018, 27(06): 184-193.","journal-title":"Operations Research and Management Science"},{"key":"e_1_3_2_1_3_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2005.03.028"},{"key":"e_1_3_2_1_4_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2013.06.005"},{"key":"e_1_3_2_1_5_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-014-0906-7"},{"issue":"11","key":"e_1_3_2_1_6_1","first-page":"284","volume":"38","author":"Shi Shouchuang","year":"2021","unstructured":"Shi Shouchuang, Jiang Hao, Han Zhangang, A Hybrid Optimization Genetic Algorithm for Flexible Job Shop Scheduling Problem [J]. Computer Simulation, 2021, 38(11): 284-289.","journal-title":"Computer Simulation"},{"issue":"06","key":"e_1_3_2_1_7_1","first-page":"95","volume":"26","author":"Yuan Minghai","year":"2021","unstructured":"Yuan Minghai, Zhang Lizhi, Zhou Kaijun, Research on Flexible Workshop Scheduling Problem Based on Hybrid Genetic Algorithm [J]. Industrial Engineering and Management, 2021, 26(06): 95-103.","journal-title":"Industrial Engineering and Management"},{"key":"e_1_3_2_1_8_1","first-page":"160","volume-title":"Application of Adaptive Ant Colony Algorithm in Bidirectional Production Workshop Scheduling [J]. Operations Research and Management Science","author":"Li Yan","year":"2008","unstructured":"Li Yan, Chen Huaping, Wang Shuanshi, Application of Adaptive Ant Colony Algorithm in Bidirectional Production Workshop Scheduling [J]. Operations Research and Management Science, 2008 (03): 160-163."},{"issue":"04","key":"e_1_3_2_1_9_1","first-page":"78","article-title":"Particle Swarm Genetic Hybrid Algorithm for Solving FJSP Considering Transmission Time [J]","volume":"28","author":"Tian Min","year":"2019","unstructured":"Tian Min, Zhang Guangjun, Liu Renjing. Particle Swarm Genetic Hybrid Algorithm for Solving FJSP Considering Transmission Time [J]. Operations Research and Management Science, 2019, 28(04): 78-88.","journal-title":"Operations Research and Management Science"},{"issue":"01","key":"e_1_3_2_1_10_1","first-page":"154","article-title":"Particle Swarm Algorithm and Its Application in Hot Rolling Production Scheduling [J]","volume":"2007","author":"Wang Xiaoping","unstructured":"Wang Xiaoping, Gao Huimin, Zeng Jianchao. Particle Swarm Algorithm and Its Application in Hot Rolling Production Scheduling [J]. Operations Research and Management Science, 2007 (01): 154-158.","journal-title":"Operations Research and Management Science"},{"issue":"01","key":"e_1_3_2_1_11_1","first-page":"157","article-title":"Discrete Artificial Bee Colony Algorithm for Solving Hybrid Flow Shop Scheduling Problem [J]","volume":"24","author":"Li Junqing","year":"2015","unstructured":"Li Junqing, Pan Quanke, Wang Fatao. Discrete Artificial Bee Colony Algorithm for Solving Hybrid Flow Shop Scheduling Problem [J]. Operations Research and Management Science, 2015, 24(01): 157-163.","journal-title":"Operations Research and Management Science"},{"key":"e_1_3_2_1_12_1","doi-asserted-by":"publisher","DOI":"10.3901\/JME.2021.14.291"},{"key":"e_1_3_2_1_13_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-006-0492-8"},{"key":"e_1_3_2_1_14_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207548408942436"},{"issue":"10","key":"e_1_3_2_1_15_1","first-page":"392","volume":"38","author":"Gao Qiang","year":"2021","unstructured":"Gao Qiang, Guo Daquan, Li Fei, Application Research of Improved Heuristic Algorithm in Semiconductor Production Scheduling [J]. Computer Simulation, 2021, 38(10): 392-396.","journal-title":"Computer Simulation"},{"key":"e_1_3_2_1_16_1","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2020.3029868"},{"key":"e_1_3_2_1_17_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.comnet.2021.107969"},{"issue":"21","key":"e_1_3_2_1_18_1","first-page":"106208","article-title":"Dynamic scheduling for flexible job shop with new job insertions by deep reinforcement learning [J]","volume":"91","author":"Shu L","year":"2020","unstructured":"Shu L. Dynamic scheduling for flexible job shop with new job insertions by deep reinforcement learning [J]. Applied Soft Computing Journal, 2020, 91(21):106208.","journal-title":"Applied Soft Computing Journal"},{"key":"e_1_3_2_1_19_1","volume-title":"Playing Atari with Deep Reinforcement Learning. [J]. CoRR","author":"Volodymyr M","year":"2013","unstructured":"Volodymyr M, Koray K, David S, Playing Atari with Deep Reinforcement Learning. [J]. CoRR, 2013."},{"key":"e_1_3_2_1_20_1","volume-title":"Prioritized Experience Replay. [J]. CoRR","author":"Tom S","year":"2015","unstructured":"Tom S, John Q, Ioannis A, Prioritized Experience Replay. [J]. CoRR, 2015."},{"key":"e_1_3_2_1_21_1","volume-title":"CoRR","author":"Hado V H","year":"2015","unstructured":"Hado V H, Arthur G, David S. Deep Reinforcement Learning with Double Q-learning [J]. CoRR, 2015."},{"key":"e_1_3_2_1_22_1","volume-title":"Advanced Materials Research","author":"Chao Y Z","year":"2010","unstructured":"Chao Y Z, Xiao J W, Liang G. An Improved Genetic Algorithm for Multi-Objective Flexible Job-Shop Scheduling Problem [J]. Advanced Materials Research, 2010, 905(97-101)."}],"event":{"name":"ICAICE 2023: The 4th International Conference on Artificial Intelligence and Computer Engineering","location":"Dalian China","acronym":"ICAICE 2023"},"container-title":["Proceedings of the 4th International Conference on Artificial Intelligence and Computer Engineering"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3652628.3652670","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3652628.3652670","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,12,8]],"date-time":"2025-12-08T15:29:59Z","timestamp":1765207799000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3652628.3652670"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,11,17]]},"references-count":22,"alternative-id":["10.1145\/3652628.3652670","10.1145\/3652628"],"URL":"https:\/\/doi.org\/10.1145\/3652628.3652670","relation":{},"subject":[],"published":{"date-parts":[[2023,11,17]]},"assertion":[{"value":"2024-05-23","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}