{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,19]],"date-time":"2026-02-19T02:38:08Z","timestamp":1771468688464,"version":"3.50.1"},"publisher-location":"New York, NY, USA","reference-count":10,"publisher":"ACM","license":[{"start":{"date-parts":[[2024,1,19]],"date-time":"2024-01-19T00:00:00Z","timestamp":1705622400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2024,1,19]]},"DOI":"10.1145\/3653804.3656262","type":"proceedings-article","created":{"date-parts":[[2024,6,1]],"date-time":"2024-06-01T12:22:26Z","timestamp":1717244546000},"page":"1-8","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":1,"title":["Optimization Calculation of Medical Staining Process Based on Autostainer"],"prefix":"10.1145","author":[{"ORCID":"https:\/\/orcid.org\/0009-0004-5631-6044","authenticated-orcid":false,"given":"Yiwen","family":"Cai","sequence":"first","affiliation":[{"name":"School of Mechanical Engineering and Mechanics, Ningbo University, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0006-2292-5460","authenticated-orcid":false,"given":"Fen","family":"Li","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering and Mechanics, Ningbo University, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0001-0647-4149","authenticated-orcid":false,"given":"Panke","family":"Zhu","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering and Mechanics, Ningbo University, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0000-1242-9830","authenticated-orcid":false,"given":"Wenhui","family":"Li","sequence":"additional","affiliation":[{"name":"Konfoong Bioinformation Tech., LTD, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3106-4336","authenticated-orcid":false,"given":"Kewei","family":"Chen","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering and Mechanics, Ningbo University, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5958-5734","authenticated-orcid":false,"given":"Fangyan","family":"Dong","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering and Mechanics, Ningbo University, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2024,6]]},"reference":[{"key":"e_1_3_2_1_1_1","first-page":"1229","article-title":"An intelligent hybrid meta-heuristic for solving a case of no-wait two-stage flexible flow shop scheduling problem with unrelated parallel machines[J]","volume":"2014","author":"Rabiee M","unstructured":"Rabiee M, Sadeghi Rad R, Mazinani M ,Shafaei R. An intelligent hybrid meta-heuristic for solving a case of no-wait two-stage flexible flow shop scheduling problem with unrelated parallel machines[J]. International Journal of Advanced Manufacturing Technol,2014,71(5):1229-1245.","journal-title":"International Journal of Advanced Manufacturing Technol"},{"key":"e_1_3_2_1_2_1","first-page":"5293","article-title":"A re-entrant hybrid flow shop scheduling problem with machine eligibility constraints[J]","volume":"2018","author":"Zhang X Y","unstructured":"Zhang X Y, Chen L. A re-entrant hybrid flow shop scheduling problem with machine eligibility constraints[J]. International Journal of Production Research,2018,56(16):5293-5305.","journal-title":"International Journal of Production Research"},{"key":"e_1_3_2_1_3_1","first-page":"108","article-title":"Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility[J]","volume":"2018","author":"Zhong W","unstructured":"Zhong W, Shi Y. Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility[J]. Journal of Combinatorial Optimization,2018,35(1):108-125.","journal-title":"Journal of Combinatorial Optimization"},{"key":"e_1_3_2_1_4_1","first-page":"157","article-title":"Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown[J]","volume":"2016","author":"Adressi A","unstructured":"Adressi A, Tasouji H S, Azizi V. Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown[J]. Decision Science Letters,2016,5(1):157-168.","journal-title":"Decision Science Letters"},{"key":"e_1_3_2_1_5_1","first-page":"108","article-title":"Two-stage no-wait hybrid flow shop with inter-stage flexibility for operating room scheduling[J]","volume":"2022","author":"Azaiez M N","unstructured":"Azaiez M N, Gharbi A, Kacem I, Makhlouf Y, Masmoudi M. Two-stage no-wait hybrid flow shop with inter-stage flexibility for operating room scheduling[J]. Computers & Industrial Engineering,2022,168:108-121.","journal-title":"Computers & Industrial Engineering"},{"key":"e_1_3_2_1_6_1","volume-title":"Capital Structure,and Managerial Compensations: A New Vendor Perspective[R]. Working Paper","author":"Xu X D","year":"2005","unstructured":"Xu X D,Brige J R. Operational Decisions, Capital Structure,and Managerial Compensations: A New Vendor Perspective[R]. Working Paper, Chicago: The University of Chicago Graduate School of Business, 2005."},{"key":"e_1_3_2_1_7_1","volume-title":"2011 International Conference on E-Business and E-Government (ICEE)","author":"Zheng M","unstructured":"Zheng M,Hu G H. Optimal System Design of Supply Chain Finance based on Game Analysis [J ]. 2011 International Conference on E-Business and E-Government (ICEE)"},{"key":"e_1_3_2_1_8_1","volume-title":"Stern School of Business in New","author":"Cadentey R","year":"2007","unstructured":"Cadentey R, Chen X F, Financing Service and Supply Chain Contracting[R]. Working Paper, Stern School of Business in New York University,2007."},{"issue":"3","key":"e_1_3_2_1_9_1","first-page":"70","article-title":"Research on Integrated Decision-Making of Financing and Operations in Supply Chain under Capital Constraint [J]","volume":"11","author":"Chen Xiangfeng","year":"2008","unstructured":"Chen Xiangfeng, Zhu Daoli, Ying Wenqi. Research on Integrated Decision-Making of Financing and Operations in Supply Chain under Capital Constraint [J]. Journal of Management Science and Engineering, 2008, 11(3):70-77.","journal-title":"Journal of Management Science and Engineering"},{"key":"e_1_3_2_1_10_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.1040.0278"}],"event":{"name":"CVDL 2024: The International Conference on Computer Vision and Deep Learning","location":"Changsha China","acronym":"CVDL 2024"},"container-title":["Proceedings of the International Conference on Computer Vision and Deep Learning"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3653804.3656262","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3653804.3656262","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,8,22]],"date-time":"2025-08-22T15:28:18Z","timestamp":1755876498000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3653804.3656262"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,1,19]]},"references-count":10,"alternative-id":["10.1145\/3653804.3656262","10.1145\/3653804"],"URL":"https:\/\/doi.org\/10.1145\/3653804.3656262","relation":{},"subject":[],"published":{"date-parts":[[2024,1,19]]},"assertion":[{"value":"2024-06-01","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}