{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,24]],"date-time":"2025-08-24T00:01:00Z","timestamp":1755993660129,"version":"3.44.0"},"publisher-location":"New York, NY, USA","reference-count":11,"publisher":"ACM","license":[{"start":{"date-parts":[[2023,9,22]],"date-time":"2023-09-22T00:00:00Z","timestamp":1695340800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"funder":[{"name":"Guangdong Provincial Communication Group Co., Ltd.","award":["JT2022YB25"],"award-info":[{"award-number":["JT2022YB25"]}]}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2023,9,22]]},"DOI":"10.1145\/3660395.3660436","type":"proceedings-article","created":{"date-parts":[[2024,6,1]],"date-time":"2024-06-01T18:30:40Z","timestamp":1717266640000},"page":"236-240","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Study on the cross-section design models for tunnel reconstruc-tion and expansion"],"prefix":"10.1145","author":[{"ORCID":"https:\/\/orcid.org\/0009-0002-9994-1224","authenticated-orcid":false,"given":"Keqiang","family":"Sun","sequence":"first","affiliation":[{"name":"China Guangdong Road and Bridge Construction Development Co., Ltd., China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0009-1846-8342","authenticated-orcid":false,"given":"Jianhui","family":"Wang","sequence":"additional","affiliation":[{"name":"China Guangdong Road and Bridge Construction Development Co., Ltd., China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0009-4445-3419","authenticated-orcid":false,"given":"Yiwen","family":"Ye","sequence":"additional","affiliation":[{"name":"China Guangdong Road and Bridge Construction Development Co., Ltd., China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0004-2673-6267","authenticated-orcid":false,"given":"Jialong","family":"Deng","sequence":"additional","affiliation":[{"name":"School of Civil Engineering, Sun Yat-sen University &amp; Southern Marine Science and Engineering Guangdong Laboratory (Zhuhai), China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0005-4400-6505","authenticated-orcid":false,"given":"Haodong","family":"Xiao","sequence":"additional","affiliation":[{"name":"School of Civil Engineering, Sun Yat-sen University &amp; Southern Marine Science and Engineering Guangdong Laboratory (Zhuhai), China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2024,6]]},"reference":[{"key":"e_1_3_2_1_1_1","doi-asserted-by":"publisher","DOI":"10.1002\/geot.202000016"},{"key":"e_1_3_2_1_2_1","first-page":"21","article-title":"Exploration and discussion on the setting of cross passages between new and old tunnels of highway reconstruction and extension project","author":"Bai G.","year":"2019","unstructured":"Bai, G., Li, Z., Zhang, T. Exploration and discussion on the setting of cross passages between new and old tunnels of highway reconstruction and extension project. Modern Tunnelling Technology 56(S2), 21-27, 2019.","journal-title":"Modern Tunnelling Technology 56(S2)"},{"key":"e_1_3_2_1_3_1","first-page":"346","article-title":"Research on the Schemes of Multiarch Tunnel in the Reconstruction and Expansion Project","author":"Zhang L.","year":"2019","unstructured":"Zhang, L., Wang, F. Research on the Schemes of Multiarch Tunnel in the Reconstruction and Expansion Project. Tunnel Construction 39(S1), 346-354, 2019.","journal-title":"Tunnel Construction 39(S1)"},{"key":"e_1_3_2_1_4_1","doi-asserted-by":"crossref","unstructured":"Ghorbani A. Hasanzadehshooiili H. A comprehensive solution for the calculation of ground reaction curve in the crown and sidewalls of circular tunnels in the elastic-plastic-EDZ rock mass considering strain softening. Tunnelling and Underground Space Technology incorporating Trenchless Technology Research 84 413-431 2019.","DOI":"10.1016\/j.tust.2018.11.045"},{"issue":"06","key":"e_1_3_2_1_5_1","first-page":"95","article-title":"Comparative analysis of numerical simulation for reconstruction and extension of channel box culvert above shield section","volume":"48","author":"Li X","year":"2021","unstructured":"Li, X. Comparative analysis of numerical simulation for reconstruction and extension of channel box culvert above shield section. Building Technology Development 48(06), 95-97, 2021.","journal-title":"Building Technology Development"},{"issue":"02","key":"e_1_3_2_1_6_1","first-page":"187","article-title":"Study on route scheme of Hutou Mountain Tunnel S304","volume":"2012","author":"Wang Y","unstructured":"Wang, Y. Study on route scheme of Hutou Mountain Tunnel S304. Highways and Automotive Applications 2012 (02), 187-189.","journal-title":"Highways and Automotive Applications"},{"issue":"8","key":"e_1_3_2_1_7_1","first-page":"926","volume":"37","author":"Wu X.","year":"2017","unstructured":"Wu, X., He, P., Su, X., Intuitionistic Fuzzy Optimization of Enlargement Scheme of Highway Tunnel in Mountain Areas Based on Hamming Distance TOPSIS Method. Tunnel Construction 37(8), 926-932, 2017.","journal-title":"Tunnel Construction"},{"key":"e_1_3_2_1_8_1","volume-title":"Development of excavation damaged zones around a rectangular roadway under mining-induced pressure. Tunnelling and Underground Space Technology incorporating Trenchless Technology Research 118, 104163","author":"Song Z.","year":"2021","unstructured":"Song, Z., Liu, H., Tang, C., Development of excavation damaged zones around a rectangular roadway under mining-induced pressure. Tunnelling and Underground Space Technology incorporating Trenchless Technology Research 118, 104163, 2021."},{"issue":"4","key":"e_1_3_2_1_9_1","first-page":"570","volume":"42","author":"Zhang Z.","year":"2022","unstructured":"Zhang, Z., Lin, C., Li, J., Dong, Y., Development Status and Prospect of Highway Tunnel Rehabilitation and Expansion in China. Tunnel Construction 42(4), 570-585, 2022.","journal-title":"Tunnel Construction"},{"key":"e_1_3_2_1_10_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jrmge.2016.11.009"},{"key":"e_1_3_2_1_11_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.undsp.2020.01.002"}],"event":{"name":"AIBDF 2023: 2023 3rd Guangdong-Hong Kong-Macao Greater Bay Area Artificial Intelligence and Big Data Forum","acronym":"AIBDF 2023","location":"Guangzhou China"},"container-title":["Proceedings of the 2023 3rd Guangdong-Hong Kong-Macao Greater Bay Area Artificial Intelligence and Big Data Forum"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3660395.3660436","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3660395.3660436","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,8,22]],"date-time":"2025-08-22T23:32:13Z","timestamp":1755905533000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3660395.3660436"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,9,22]]},"references-count":11,"alternative-id":["10.1145\/3660395.3660436","10.1145\/3660395"],"URL":"https:\/\/doi.org\/10.1145\/3660395.3660436","relation":{},"subject":[],"published":{"date-parts":[[2023,9,22]]},"assertion":[{"value":"2024-06-01","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}