{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,19]],"date-time":"2025-06-19T05:02:54Z","timestamp":1750309374701,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":37,"publisher":"ACM","license":[{"start":{"date-parts":[[2024,6,21]],"date-time":"2024-06-21T00:00:00Z","timestamp":1718928000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2024,6,21]]},"DOI":"10.1145\/3690407.3690548","type":"proceedings-article","created":{"date-parts":[[2024,10,24]],"date-time":"2024-10-24T18:55:28Z","timestamp":1729796128000},"page":"846-853","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Construction of investment impact index and LASSO regres-sion prediction for pumped storage power stations"],"prefix":"10.1145","author":[{"ORCID":"https:\/\/orcid.org\/0009-0007-3371-0358","authenticated-orcid":false,"given":"Gang","family":"Yu","sequence":"first","affiliation":[{"name":"Technical and Economic Consulting Center of Electricity Power Construction, CEC, Beijing, China"}]},{"ORCID":"https:\/\/orcid.org\/0009-0002-2324-2953","authenticated-orcid":false,"given":"Xiuna","family":"Wang","sequence":"additional","affiliation":[{"name":"Technical and Economic Consulting Center of Electricity Power Construction, CEC, Beijing, China"}]},{"ORCID":"https:\/\/orcid.org\/0009-0003-6327-0905","authenticated-orcid":false,"given":"Chao","family":"Han","sequence":"additional","affiliation":[{"name":"Technical and Economic Consulting Center of Electricity Power Construction, CEC, Beijing, China"}]},{"ORCID":"https:\/\/orcid.org\/0009-0003-3244-2962","authenticated-orcid":false,"given":"Yanbo","family":"Wang","sequence":"additional","affiliation":[{"name":"Technical and Economic Consulting Center of Electricity Power Construction, CEC, Beijing, China"}]},{"ORCID":"https:\/\/orcid.org\/0009-0004-1957-9080","authenticated-orcid":false,"given":"Dan","family":"Xu","sequence":"additional","affiliation":[{"name":"Technical and Economic Consulting Center of Electricity Power Construction, CEC, Beijing, China"}]}],"member":"320","published-online":{"date-parts":[[2024,10,24]]},"reference":[{"key":"e_1_3_3_1_1_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2016.12.100"},{"key":"e_1_3_3_1_2_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.est.2023.106977"},{"key":"e_1_3_3_1_3_2","doi-asserted-by":"publisher","DOI":"10.1088\/1755-1315\/163\/1\/012089"},{"key":"e_1_3_3_1_4_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2012.05.024"},{"key":"e_1_3_3_1_5_2","doi-asserted-by":"publisher","DOI":"10.1038\/nenergy.2017.125"},{"key":"e_1_3_3_1_6_2","volume-title":"Proceedings of the IEEE","author":"Whittingham M S","year":"2012","unstructured":"Whittingham M S. History, evolution, and future status of energy storage[J]. Proceedings of the IEEE, 2012, 100(Special Centennial Issue): 1518-1534."},{"key":"e_1_3_3_1_7_2","doi-asserted-by":"publisher","DOI":"10.1109\/TPAS.1984.318452"},{"key":"e_1_3_3_1_8_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2012.04.058"},{"key":"e_1_3_3_1_9_2","doi-asserted-by":"publisher","DOI":"10.3390\/en14248322"},{"key":"e_1_3_3_1_10_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2023.119183"},{"key":"e_1_3_3_1_11_2","doi-asserted-by":"publisher","DOI":"10.1080\/15325008.2020.1854383"},{"key":"e_1_3_3_1_12_2","doi-asserted-by":"publisher","DOI":"10.1080\/15325008.2020.1854383"},{"issue":"1","key":"e_1_3_3_1_13_2","first-page":"5","article-title":"Analysis on economic and environmental benefit of pumped-storage station[J]","volume":"40","author":"Cui J C","year":"2007","unstructured":"Cui J C, Liu D H, Liang W L, et al. Analysis on economic and environmental benefit of pumped-storage station[J]. Electric Power, 2007, 40(1): 5-10.","journal-title":"Electric Power"},{"key":"e_1_3_3_1_14_2","doi-asserted-by":"publisher","DOI":"10.1051\/matecconf\/202133609031"},{"key":"e_1_3_3_1_15_2","volume-title":"The application of RAMS to analysis life cycle cost on the operation of power generation[M]. Safety, Reliability and Risk Analysis: Beyond the Horizon","author":"Nugraha H","year":"2014","unstructured":"Nugraha H, Sinisuka N I, Steenbergen R. The application of RAMS to analysis life cycle cost on the operation of power generation[M]. Safety, Reliability and Risk Analysis: Beyond the Horizon. Taylor & Francis, 2014: 2909-2918."},{"key":"e_1_3_3_1_16_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2022.03.070"},{"key":"e_1_3_3_1_17_2","volume-title":"Electrical energy storage systems: A comparative life cycle cost analysis[J]. Renewable and sustainable energy reviews","author":"Zakeri B","year":"2015","unstructured":"Zakeri B, Syri S. Electrical energy storage systems: A comparative life cycle cost analysis[J]. Renewable and sustainable energy reviews, 2015, 42: 569-596."},{"key":"e_1_3_3_1_18_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.seta.2021.101680"},{"key":"e_1_3_3_1_19_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2013.10.003"},{"key":"e_1_3_3_1_20_2","volume-title":"Improving cost estimates of construction projects using phased cost factors[J]. Journal of construction engineering and management","author":"Liu L","year":"2007","unstructured":"Liu L, Zhu K. Improving cost estimates of construction projects using phased cost factors[J]. Journal of construction engineering and management, 2007, 133(1): 91-95."},{"key":"e_1_3_3_1_21_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2004.10.003"},{"key":"e_1_3_3_1_22_2","volume-title":"Ballal T M A. Critical determinants of construction tendering costs: Quantity surveyors","author":"Elhag T M S","year":"2005","unstructured":"Elhag T M S, Boussabaine A H, Ballal T M A. Critical determinants of construction tendering costs: Quantity surveyors\u2019 standpoint[J]. International journal of project management, 2005, 23(7): 538-545."},{"issue":"10","key":"e_1_3_3_1_23_2","first-page":"734","article-title":"Investigation of significant factors influencing time and cost overruns in Indian construction projects[J]","volume":"3","author":"Shanmugapriya S","year":"2013","unstructured":"Shanmugapriya S, Subramanian K. Investigation of significant factors influencing time and cost overruns in Indian construction projects[J]. International Journal of Emerging Technology and Advanced Engineering, 2013, 3(10): 734-740.","journal-title":"International Journal of Emerging Technology and Advanced Engineering"},{"key":"e_1_3_3_1_24_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2023.119183"},{"key":"e_1_3_3_1_25_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2020.113744"},{"key":"e_1_3_3_1_26_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijhydene.2016.03.078"},{"key":"e_1_3_3_1_27_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2015.04.052"},{"key":"e_1_3_3_1_28_2","doi-asserted-by":"publisher","DOI":"10.1109\/TEC.2016.2618895"},{"key":"e_1_3_3_1_29_2","doi-asserted-by":"publisher","DOI":"10.3390\/su132413542"},{"key":"e_1_3_3_1_30_2","doi-asserted-by":"publisher","DOI":"10.1093\/ce\/zkab011"},{"key":"e_1_3_3_1_31_2","doi-asserted-by":"publisher","DOI":"10.1002\/bjs.10895"},{"key":"e_1_3_3_1_32_2","doi-asserted-by":"publisher","DOI":"10.1088\/2516-1083\/abeb5b"},{"key":"e_1_3_3_1_33_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2021.09.009"},{"key":"e_1_3_3_1_34_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.joule.2020.11.015"},{"key":"e_1_3_3_1_35_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.clet.2021.100281"},{"key":"e_1_3_3_1_36_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2021.121387"},{"key":"e_1_3_3_1_37_2","doi-asserted-by":"publisher","DOI":"10.1002\/est2.223"}],"event":{"name":"CAIBDA 2024: 2024 4th International Conference on Artificial Intelligence, Big Data and Algorithms","acronym":"CAIBDA 2024","location":"Zhengzhou China"},"container-title":["Proceedings of the 2024 4th International Conference on Artificial Intelligence, Big Data and Algorithms"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3690407.3690548","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3690407.3690548","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,19]],"date-time":"2025-06-19T00:06:21Z","timestamp":1750291581000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3690407.3690548"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,6,21]]},"references-count":37,"alternative-id":["10.1145\/3690407.3690548","10.1145\/3690407"],"URL":"https:\/\/doi.org\/10.1145\/3690407.3690548","relation":{},"subject":[],"published":{"date-parts":[[2024,6,21]]},"assertion":[{"value":"2024-10-24","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}