{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,19]],"date-time":"2025-06-19T05:06:09Z","timestamp":1750309569807,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":10,"publisher":"ACM","license":[{"start":{"date-parts":[[2024,11,15]],"date-time":"2024-11-15T00:00:00Z","timestamp":1731628800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2024,11,15]]},"DOI":"10.1145\/3718751.3718875","type":"proceedings-article","created":{"date-parts":[[2025,4,28]],"date-time":"2025-04-28T06:31:46Z","timestamp":1745821906000},"page":"758-764","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Optimization Methods for the Lifecycle Cost of Electrical Engineering Projects Based on 5G and Blockchain Technologies"],"prefix":"10.1145","author":[{"ORCID":"https:\/\/orcid.org\/0009-0000-1753-9561","authenticated-orcid":false,"given":"Ruyu","family":"Zhang","sequence":"first","affiliation":[{"name":"State Grid Liaoning Electric Power Company Limited Economic Research Institute, Shenyang, Liaoning, China"}]},{"ORCID":"https:\/\/orcid.org\/0009-0004-8958-5718","authenticated-orcid":false,"given":"Ping","family":"Zhang","sequence":"additional","affiliation":[{"name":"State Grid Liaoning Electric Power Company Limited Economic Research Institute, Shenyang, Liaoning, China"}]},{"ORCID":"https:\/\/orcid.org\/0009-0008-2302-8686","authenticated-orcid":false,"given":"Jin","family":"Pan","sequence":"additional","affiliation":[{"name":"State Grid Liaoning Electric Power Company Limited Economic Research Institute, Shenyang, Liaoning, China"}]},{"ORCID":"https:\/\/orcid.org\/0009-0005-5956-960X","authenticated-orcid":false,"given":"Qi","family":"Xue","sequence":"additional","affiliation":[{"name":"State Grid Liaoning Electric Power Company Limited Economic Research Institute, Shenyang, Liaoning, China"}]}],"member":"320","published-online":{"date-parts":[[2025,4,27]]},"reference":[{"issue":"2","key":"e_1_3_3_1_1_2","first-page":"16","article-title":"Discussion on Typical Problems and Countermeasures of Power Engineering Cost[J]","volume":"25","author":"Qing Zhou","year":"2022","unstructured":"Zhou Qing, Qi Xuan, Huang Yi, et al. Discussion on Typical Problems and Countermeasures of Power Engineering Cost[J]. China Management Informationization, 2022, 25(2): 16-18.","journal-title":"China Management Informationization"},{"issue":"1","key":"e_1_3_3_1_2_2","first-page":"24","article-title":"Combined Forecasting Method for Cost of Overhead Line Reconstruction Projects[J]","volume":"35","author":"Min Yu","year":"2020","unstructured":"Yu Min, Wang Yuanxiang, Yan Yuan, et al. Combined Forecasting Method for Cost of Overhead Line Reconstruction Projects[J]. Journal of Electric Power Science and Technology, 2020, 35(1): 24-30.","journal-title":"Journal of Electric Power Science and Technology"},{"key":"e_1_3_3_1_3_2","volume-title":"Design and Implementation of Grid Construction Management System[D]","author":"Jishi Xie","year":"2021","unstructured":"Xie Jishi. Design and Implementation of Grid Construction Management System[D]. Chengdu: University of Electronic Science and Technology of China, 2021."},{"key":"e_1_3_3_1_4_2","volume-title":"Design and Implementation of Infrastructure Management System for Sichuan Power Grid Company[D]","author":"Yinfeng Liu","year":"2021","unstructured":"Liu Yinfeng. Design and Implementation of Infrastructure Management System for Sichuan Power Grid Company[D]. Chengdu: University of Electronic Science and Technology of China, 2021."},{"key":"e_1_3_3_1_5_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2019.02.005"},{"key":"e_1_3_3_1_6_2","volume-title":"Research on Blockchain-Based Construction Quality Control System[D]","author":"Lengxi Wu","year":"2020","unstructured":"Wu Lengxi. Research on Blockchain-Based Construction Quality Control System[D]. Wuhan: Huazhong University of Science and Technology, 2020."},{"key":"e_1_3_3_1_7_2","volume-title":"Research on Blockchain-Based Quality Chain Collaborative Management of High-Speed Railway \"Four Electric\" Construction Projects[D]","author":"Yinhui Wang","year":"2020","unstructured":"Wang Yinhui. Research on Blockchain-Based Quality Chain Collaborative Management of High-Speed Railway \"Four Electric\" Construction Projects[D]. Beijing: Beijing University of Civil Engineering and Architecture, 2020."},{"key":"e_1_3_3_1_8_2","doi-asserted-by":"publisher","DOI":"10.4018\/JCIT.2019010102"},{"key":"e_1_3_3_1_9_2","first-page":"145","article-title":"SmartOTPs: An air-gapped 2-factor authentication for smart-contract wallets\u0f3bC\u0f3d\/\/ Proceedings of the 2nd ACM Conference on Advances","volume":"2020","author":"HOMOLIAK I, BREITENBACHER D, HUJNAK O","unstructured":"HOMOLIAK I, BREITENBACHER D, HUJNAK O, et al. SmartOTPs: An air-gapped 2-factor authentication for smart-contract wallets\u0f3bC\u0f3d\/\/ Proceedings of the 2nd ACM Conference on Advances in Financial Technologies. 2020:145-162.","journal-title":"Financial Technologies."},{"issue":"3","key":"e_1_3_3_1_10_2","first-page":"2330","article-title":"When Energy Meets Blockchain: A Systematic Exposition of Policies, Research Hotspots, Applications, and Prospects[J]","volume":"46","author":"Daoshun Zha","year":"2021","unstructured":"Zha Daoshun, Feng Tiantian, Gong Xiaolei, et al. When Energy Meets Blockchain: A Systematic Exposition of Policies, Research Hotspots, Applications, and Prospects[J]. International Journal of Energy Research, 2021, 46(3): 2330-2360.","journal-title":"International Journal of Energy Research"}],"event":{"name":"ICBAR 2024: 2024 4th International Conference on Big Data, Artificial Intelligence and Risk Management","acronym":"ICBAR 2024","location":"Chengdu Guangdong China"},"container-title":["Proceedings of the 2024 4th International Conference on Big Data, Artificial Intelligence and Risk Management"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3718751.3718875","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3718751.3718875","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,19]],"date-time":"2025-06-19T01:19:13Z","timestamp":1750295953000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3718751.3718875"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,11,15]]},"references-count":10,"alternative-id":["10.1145\/3718751.3718875","10.1145\/3718751"],"URL":"https:\/\/doi.org\/10.1145\/3718751.3718875","relation":{},"subject":[],"published":{"date-parts":[[2024,11,15]]},"assertion":[{"value":"2025-04-27","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}