{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,19]],"date-time":"2025-06-19T05:06:34Z","timestamp":1750309594745,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":16,"publisher":"ACM","license":[{"start":{"date-parts":[[2025,1,10]],"date-time":"2025-01-10T00:00:00Z","timestamp":1736467200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2025,1,10]]},"DOI":"10.1145\/3727353.3727433","type":"proceedings-article","created":{"date-parts":[[2025,5,27]],"date-time":"2025-05-27T16:31:13Z","timestamp":1748363473000},"page":"498-504","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Research on the Establishment and Validation of an IDC Implementation Factor Measurement Framework"],"prefix":"10.1145","author":[{"ORCID":"https:\/\/orcid.org\/0009-0000-3929-6660","authenticated-orcid":false,"given":"Yulian","family":"Zhang","sequence":"first","affiliation":[{"name":"Xi'an University of Science and Technology, Xi'an, Shaanxi, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0008-7310-339X","authenticated-orcid":false,"given":"Ping","family":"Cao","sequence":"additional","affiliation":[{"name":"Xi'an University of Science and Technology, Xi'an, Shaanxi, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0000-6838-5080","authenticated-orcid":false,"given":"Yuanhang","family":"Jiao","sequence":"additional","affiliation":[{"name":"Xi'an University of Science and Technology, Xi'an, Shaanxi, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"320","published-online":{"date-parts":[[2025,5,27]]},"reference":[{"key":"e_1_3_3_1_1_2","volume-title":"Research on Engineering Project Change Control Based on BIM and IPD Models [D]","author":"ZHANG Y L","year":"2020","unstructured":"ZHANG Y L. Research on Engineering Project Change Control Based on BIM and IPD Models [D]. Shanghai Jiao Tong University, 2020."},{"key":"e_1_3_3_1_2_2","volume-title":"Research on Interface Management of EPC General Contracting Project [D]","author":"FAN L J","year":"2013","unstructured":"FAN L J. Research on Interface Management of EPC General Contracting Project [D]. Central South University, 2013."},{"key":"e_1_3_3_1_3_2","volume-title":"Research on Design Management of International Hydropower EPC Projects Based on Partnerships [D]","author":"ZHANG Q Z","year":"2021","unstructured":"ZHANG Q Z. Research on Design Management of International Hydropower EPC Projects Based on Partnerships [D]. Tsinghua University, 2021."},{"issue":"11","key":"e_1_3_3_1_4_2","first-page":"71","article-title":"The Dilemmas and Countermeasures of Implementing EPC Engineering General Contracting Mode in China [J]","volume":"2020","author":"CHEN X F","unstructured":"CHEN X F, ZHANG Z C. The Dilemmas and Countermeasures of Implementing EPC Engineering General Contracting Mode in China [J]. China Exploration & Design, 2020(11):71-77.","journal-title":"China Exploration & Design"},{"issue":"12","key":"e_1_3_3_1_5_2","first-page":"8","article-title":"Practical Research on Design Management Process of EPC Project for Design Institutes [J]","volume":"40","author":"SHENG J","year":"2023","unstructured":"SHENG J, HUANG G R. Practical Research on Design Management Process of EPC Project for Design Institutes [J]. Construction Design Management, 2023, 40(12): 8-15+27.","journal-title":"Construction Design Management"},{"key":"e_1_3_3_1_6_2","doi-asserted-by":"publisher","DOI":"10.5130\/AJCEB.v21i1.7453"},{"key":"e_1_3_3_1_7_2","doi-asserted-by":"publisher","DOI":"10.1108\/CI-02-2021-0033"},{"key":"e_1_3_3_1_8_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jobe.2021.102499"},{"key":"e_1_3_3_1_9_2","volume-title":"Enhancing trust-based interface management in international engineering-procurement-construction projects. Journal of construction engineering and management","author":"SHEN W","year":"2017","unstructured":"SHEN W, TANG W, WANG S. et al. Enhancing trust-based interface management in international engineering-procurement-construction projects. Journal of construction engineering and management, 2017a, 143(9), 04017061."},{"key":"e_1_3_3_1_10_2","volume-title":"Design and construction coordination problems and planning for design\u2013build project new users. Canadian journal of civil engineering","author":"CHANG A S","year":"2010","unstructured":"CHANG A S, SHEN F Y, IBBS W. Design and construction coordination problems and planning for design\u2013build project new users. Canadian journal of civil engineering, 2010, 37(12): 1525-1534."},{"key":"e_1_3_3_1_11_2","unstructured":"WANG J HU Z M LI M et al. Application Research of BIM Forward Design in Large-Span Municipal Arch Bridge [J\/OL]. Information Technology in Civil Engineering and Architecture 1-5 [retrieved on 2024-03-13]."},{"issue":"6","key":"e_1_3_3_1_12_2","first-page":"138","article-title":"Integrated BIM Application in the Design and Construction of Super High-rise Building Projects [J]","volume":"13","author":"ZENG L","year":"2021","unstructured":"ZENG L. Integrated BIM Application in the Design and Construction of Super High-rise Building Projects [J]. Information Technology in Civil Engineering and Architecture, 2021, 13(6): 138-144","journal-title":"Information Technology in Civil Engineering and Architecture"},{"key":"e_1_3_3_1_13_2","doi-asserted-by":"publisher","DOI":"10.1504\/IJPOM.2021.116263"},{"key":"e_1_3_3_1_14_2","first-page":"29","article-title":"Cost Management Strategy for the Entire Construction Process under EPC Mode [J]","volume":"08","author":"LIU H F","year":"2021","unstructured":"LIU H F. Cost Management Strategy for the Entire Construction Process under EPC Mode [J]. Modern Enterprise, 2021, (08): 29-30.","journal-title":"Modern Enterprise"},{"issue":"03","key":"e_1_3_3_1_15_2","first-page":"42","article-title":"Discussion on Interface Management of EPC General Contracting Project Interface [J]","volume":"33","author":"CAO N","year":"2011","unstructured":"CAO N. Discussion on Interface Management of EPC General Contracting Project Interface [J]. Petrochemical Construction, 2011, 33(03): 42-44.","journal-title":"Petrochemical Construction"},{"key":"e_1_3_3_1_16_2","volume-title":"Interface Management of International EPC Projects Based on Partnership [J]","author":"SHEN W X","year":"2017","unstructured":"SHEN W X, TANG W Z, ZHANG Q Z, et al. Interface Management of International EPC Projects Based on Partnership [J]. Journal of Tsinghua University (Science and Technology), 2017, 57(06): 644-650."}],"event":{"name":"BDICN 2025: 2025 4th International Conference on Big Data, Information and Computer Network","acronym":"BDICN 2025","location":"Guangzhou China"},"container-title":["Proceedings of the 2025 4th International Conference on Big Data, Information and Computer Network"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3727353.3727433","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3727353.3727433","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,19]],"date-time":"2025-06-19T01:56:57Z","timestamp":1750298217000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3727353.3727433"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,1,10]]},"references-count":16,"alternative-id":["10.1145\/3727353.3727433","10.1145\/3727353"],"URL":"https:\/\/doi.org\/10.1145\/3727353.3727433","relation":{},"subject":[],"published":{"date-parts":[[2025,1,10]]},"assertion":[{"value":"2025-05-27","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}