{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,19]],"date-time":"2025-06-19T04:21:16Z","timestamp":1750306876481,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":13,"publisher":"ACM","license":[{"start":{"date-parts":[[2013,3,24]],"date-time":"2013-03-24T00:00:00Z","timestamp":1364083200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2013,3,24]]},"DOI":"10.1145\/2451916.2451960","type":"proceedings-article","created":{"date-parts":[[2013,3,25]],"date-time":"2013-03-25T14:14:26Z","timestamp":1364220866000},"page":"171-178","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":8,"title":["TAU 2013 variation aware timing analysis contest"],"prefix":"10.1145","author":[{"given":"Debjit","family":"Sinha","sequence":"first","affiliation":[{"name":"IBM Systems and Technology Group, Hopewell Junction, New York, USA"}]},{"given":"Luis","family":"Guerra e Silva","sequence":"additional","affiliation":[{"name":"INESC-ID \/ IST - TU, Lisbon, Portugal"}]},{"given":"Jia","family":"Wang","sequence":"additional","affiliation":[{"name":"Illinois Institute of Technology, Chicago, Illinois, USA"}]},{"given":"Shesha","family":"Raghunathan","sequence":"additional","affiliation":[{"name":"IBM Systems and Technoloy Group, Bangalore, India"}]},{"given":"Dileep","family":"Netrabile","sequence":"additional","affiliation":[{"name":"IBM Systems and Technology Group, Burlington, Vermont, USA"}]},{"given":"Ahmed","family":"Shebaita","sequence":"additional","affiliation":[{"name":"Synopsys, Sunnyvale, California, USA"}]}],"member":"320","published-online":{"date-parts":[[2013,3,24]]},"reference":[{"key":"e_1_3_2_1_1_1","unstructured":"2011 PATMOS timing analysis contest. http:\/\/patmos-tac.inesc-id.pt.  2011 PATMOS timing analysis contest. http:\/\/patmos-tac.inesc-id.pt."},{"key":"e_1_3_2_1_2_1","unstructured":"2013 TAU variation aware timing analysis contest. https:\/\/sites.google.com\/site\/taucontest2013\/.  2013 TAU variation aware timing analysis contest. https:\/\/sites.google.com\/site\/taucontest2013\/."},{"key":"e_1_3_2_1_3_1","doi-asserted-by":"publisher","DOI":"10.1109\/TCAD.2007.907047"},{"key":"e_1_3_2_1_4_1","doi-asserted-by":"publisher","DOI":"10.5555\/996070.1009954"},{"key":"e_1_3_2_1_5_1","volume-title":"Operations Research","volume":"9","author":"Clark C. E.","unstructured":"C. E. Clark . The greatest of a finite set of random variables . In Operations Research , Vol. 9 , No. 2 (Mar - Apr), pages 145--162, 1961. C. E. Clark. The greatest of a finite set of random variables. In Operations Research, Vol. 9, No. 2 (Mar - Apr), pages 145--162, 1961."},{"key":"e_1_3_2_1_6_1","doi-asserted-by":"publisher","DOI":"10.1063\/1.1697872"},{"key":"e_1_3_2_1_7_1","unstructured":"R. Goering. Why Multi-Mode Multi-Corner (MMMC) ECO Closure Requires a New Signoff Approach. http:\/\/www.cadence.com\/Community\/blogs\/ii\/ archive\/2012\/08\/06\/why-multi-mode-multi-cornermmmc-eco-closure-requires-a-new-signoff-approach.aspx.  R. Goering. Why Multi-Mode Multi-Corner (MMMC) ECO Closure Requires a New Signoff Approach. http:\/\/www.cadence.com\/Community\/blogs\/ii\/ archive\/2012\/08\/06\/why-multi-mode-multi-cornermmmc-eco-closure-requires-a-new-signoff-approach.aspx."},{"key":"e_1_3_2_1_8_1","doi-asserted-by":"publisher","DOI":"10.1109\/43.559334"},{"key":"e_1_3_2_1_9_1","first-page":"613","volume-title":"Jr. and J. Rubinstein. Signal Delay in RC Tree Networks. In Design Automation Conference","author":"Penfield P.","year":"1981","unstructured":"P. Penfield Jr. and J. Rubinstein. Signal Delay in RC Tree Networks. In Design Automation Conference , pages 613 -- 617 , 1981 . P. Penfield Jr. and J. Rubinstein. Signal Delay in RC Tree Networks. In Design Automation Conference, pages 613--617, 1981."},{"key":"e_1_3_2_1_10_1","doi-asserted-by":"publisher","DOI":"10.1109\/TCAD.2004.825861"},{"key":"e_1_3_2_1_11_1","doi-asserted-by":"publisher","DOI":"10.1109\/43.285250"},{"key":"e_1_3_2_1_12_1","doi-asserted-by":"publisher","DOI":"10.1109\/TCAD.2007.893544"},{"key":"e_1_3_2_1_13_1","doi-asserted-by":"publisher","DOI":"10.1145\/996566.996663"}],"event":{"name":"ISPD'13: International Symposium on Physical Design","sponsor":["SIGDA ACM Special Interest Group on Design Automation"],"location":"Stateline Nevada USA","acronym":"ISPD'13"},"container-title":["Proceedings of the 2013 ACM International symposium on Physical Design"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/2451916.2451960","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/2451916.2451960","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T08:18:24Z","timestamp":1750234704000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/2451916.2451960"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,3,24]]},"references-count":13,"alternative-id":["10.1145\/2451916.2451960","10.1145\/2451916"],"URL":"https:\/\/doi.org\/10.1145\/2451916.2451960","relation":{},"subject":[],"published":{"date-parts":[[2013,3,24]]},"assertion":[{"value":"2013-03-24","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}