{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T04:09:45Z","timestamp":1750219785865,"version":"3.41.0"},"publisher-location":"New York, NY, USA","reference-count":14,"publisher":"ACM","license":[{"start":{"date-parts":[[2023,7,15]],"date-time":"2023-07-15T00:00:00Z","timestamp":1689379200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2023,7,15]]},"DOI":"10.1145\/3583133.3590758","type":"proceedings-article","created":{"date-parts":[[2023,7,24]],"date-time":"2023-07-24T23:30:33Z","timestamp":1690241433000},"page":"211-214","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["A Hybrid BRKGA for Joint Scheduling Production, Transport, and Storage\/Retrieval in Flexible Job Shops"],"prefix":"10.1145","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-6833-9316","authenticated-orcid":false,"given":"S. Mahdi","family":"Homayuni","sequence":"first","affiliation":[{"name":"CESE, INESC TEC, Porto, Porto, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9402-2088","authenticated-orcid":false,"given":"Dalila B M M","family":"Fontes","sequence":"additional","affiliation":[{"name":"LIAAD, INESC TEC, Porto, Portugal"},{"name":"Faculdade de Economia da Universidade do Porto, Porto, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3516-5094","authenticated-orcid":false,"given":"Fernando A C C","family":"Fontes","sequence":"additional","affiliation":[{"name":"SYSTEC\/ARISE, Porto, Portugal"},{"name":"Faculdade de Engenharia, Universidade do Porto, Porto, Portugal"}]}],"member":"320","published-online":{"date-parts":[[2023,7,24]]},"reference":[{"key":"e_1_3_2_1_1_1","doi-asserted-by":"publisher","DOI":"10.1287\/trsc.2018.0873"},{"key":"e_1_3_2_1_2_1","volume-title":"Genetic algorithms and random keys for sequencing and optimization. ORSA journal on computing 6, 2","author":"Bean J.C.","year":"1994","unstructured":"J.C. Bean . 1994. Genetic algorithms and random keys for sequencing and optimization. ORSA journal on computing 6, 2 ( 1994 ), 154--160. J.C. Bean. 1994. Genetic algorithms and random keys for sequencing and optimization. ORSA journal on computing 6, 2 (1994), 154--160."},{"key":"e_1_3_2_1_3_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2016.04.008"},{"key":"e_1_3_2_1_4_1","doi-asserted-by":"publisher","DOI":"10.5555\/160231.160247"},{"key":"e_1_3_2_1_5_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-003-1629-7"},{"volume-title":"International Conference on Metaheuristics and Nature Inspired Computing. Djerba Island Tunisia, 1--2.","author":"Deroussi L.","key":"e_1_3_2_1_6_1","unstructured":"L. Deroussi and S. Norre . 2010. Simultaneous scheduling of machines and vehicles for the flexible job shop problem . In International Conference on Metaheuristics and Nature Inspired Computing. Djerba Island Tunisia, 1--2. L. Deroussi and S. Norre. 2010. Simultaneous scheduling of machines and vehicles for the flexible job shop problem. In International Conference on Metaheuristics and Nature Inspired Computing. Djerba Island Tunisia, 1--2."},{"key":"e_1_3_2_1_7_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10878-022-00885-8"},{"key":"e_1_3_2_1_8_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1456692"},{"key":"e_1_3_2_1_9_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10732-010-9143-1"},{"key":"e_1_3_2_1_10_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2020.120409"},{"key":"e_1_3_2_1_11_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10898-021-00992-6"},{"key":"e_1_3_2_1_12_1","doi-asserted-by":"crossref","unstructured":"S.M. Homayouni D.B.M.M. Fontes and J.F. Gon\u00e7alves. 2020. A multistart biased random key genetic algorithm for the flexible job shop scheduling problem with transportation. International Transactions in Operational Research (2020).  S.M. Homayouni D.B.M.M. Fontes and J.F. Gon\u00e7alves. 2020. A multistart biased random key genetic algorithm for the flexible job shop scheduling problem with transportation. International Transactions in Operational Research (2020).","DOI":"10.1111\/itor.12878"},{"key":"e_1_3_2_1_13_1","doi-asserted-by":"publisher","DOI":"10.1007\/BF01322220"},{"key":"e_1_3_2_1_14_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-010-2820-2"}],"event":{"name":"GECCO '23 Companion: Companion Conference on Genetic and Evolutionary Computation","sponsor":["SIGEVO ACM Special Interest Group on Genetic and Evolutionary Computation"],"location":"Lisbon Portugal","acronym":"GECCO '23 Companion"},"container-title":["Proceedings of the Companion Conference on Genetic and Evolutionary Computation"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3583133.3590758","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3583133.3590758","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T16:37:50Z","timestamp":1750178270000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3583133.3590758"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,7,15]]},"references-count":14,"alternative-id":["10.1145\/3583133.3590758","10.1145\/3583133"],"URL":"https:\/\/doi.org\/10.1145\/3583133.3590758","relation":{},"subject":[],"published":{"date-parts":[[2023,7,15]]},"assertion":[{"value":"2023-07-24","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}