{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,9,16]],"date-time":"2026-09-16T21:10:01Z","timestamp":1789593001292,"version":"build-2803163510"},"reference-count":36,"publisher":"Wiley","issue":"1","license":[{"start":{"date-parts":[[2019,4,1]],"date-time":"2019-04-01T00:00:00Z","timestamp":1554076800000},"content-version":"vor","delay-in-days":90,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":["onlinelibrary.wiley.com"],"crossmark-restriction":true},"short-container-title":["Complexity"],"published-print":{"date-parts":[[2019,1]]},"abstract":"<jats:p>All projects take place within a context of uncertainty. That is especially noticeable in complex hydroelectric power generation projects, which are affected by factors such as the large number of multidisciplinary tasks to be performed in parallel, long execution times, or the risks inherent in various fields like geology, hydrology, and structural, electrical, and mechanical engineering, among others. Such factors often lead to cost overruns and delays in projects of this type. This paper analyzes the efficiency of the Earned Value Management technique and its Earned Schedule extension, as means of forecasting costs and deadlines when applied to complex hydroelectric power production projects. It is worth noting that this analysis was based on simulation models applied to real\u2010life projects. The results showed that cost forecasting becomes very accurate over time, whereas duration forecasting is not reliably accurate.<\/jats:p>","DOI":"10.1155\/2019\/3190830","type":"journal-article","created":{"date-parts":[[2019,4,1]],"date-time":"2019-04-01T23:32:12Z","timestamp":1554161532000},"update-policy":"https:\/\/doi.org\/10.1002\/crossmark_policy","source":"Crossref","is-referenced-by-count":22,"title":["Analysis of the Earned Value Management and Earned Schedule Techniques in Complex Hydroelectric Power Production Projects: Cost and Time Forecast"],"prefix":"10.1155","volume":"2019","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-7694-468X","authenticated-orcid":false,"given":"P.","family":"Urgil\u00e9s","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-1840-2505","authenticated-orcid":false,"given":"J.","family":"Claver","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"M. A.","family":"Sebasti\u00e1n","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"311","published-online":{"date-parts":[[2019,4]]},"reference":[{"key":"e_1_2_8_1_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.enpol.2013.10.069"},{"key":"e_1_2_8_2_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.erss.2014.07.016"},{"key":"e_1_2_8_3_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.enpol.2015.06.040"},{"key":"e_1_2_8_4_2","volume-title":"ICB- IPMA Competence Baseline Version 3.0","author":"International Poject Management Association IPMA","year":"2003"},{"key":"e_1_2_8_5_2","doi-asserted-by":"publisher","DOI":"10.1155\/2018\/5928235"},{"key":"e_1_2_8_6_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.proeng.2016.04.048"},{"key":"e_1_2_8_7_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.procs.2017.11.098"},{"key":"e_1_2_8_8_2","unstructured":"AzimS. W. Understanding and Managing Project Complexity 2010 University of Manchester."},{"key":"e_1_2_8_9_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.procs.2017.11.097"},{"key":"e_1_2_8_10_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.procs.2017.11.090"},{"key":"e_1_2_8_11_2","doi-asserted-by":"publisher","DOI":"10.1155\/2018\/4891286"},{"key":"e_1_2_8_12_2","doi-asserted-by":"publisher","DOI":"10.1002\/pmj.20272"},{"key":"e_1_2_8_13_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2008.02.009"},{"key":"e_1_2_8_14_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2014.08.011"},{"key":"e_1_2_8_15_2","unstructured":"Urgil\u0398sP. ClaverJ. SebastianM. A. andUrgil\u00e9sP. Analysis of the cost schedule and earned value techniques for the monitoring and control of complex construction projects Proceedings of the in 22nd International Congress on Project Management and Engineering 2018 Madrid Spain."},{"key":"e_1_2_8_16_2","doi-asserted-by":"publisher","DOI":"10.1155\/2017\/4791635"},{"key":"e_1_2_8_17_2","doi-asserted-by":"publisher","DOI":"10.1155\/2013\/513549"},{"key":"e_1_2_8_18_2","doi-asserted-by":"publisher","DOI":"10.4067\/S0718-07642010000400005"},{"key":"e_1_2_8_19_2","doi-asserted-by":"publisher","DOI":"10.3989\/ic.09.025"},{"key":"e_1_2_8_20_2","unstructured":"American Association of Cost Engineering AACE International Recommended Practice No. 66R-11: Selecting probability distribution functions for use in cost and schedule risk simulation models AACE International USA 2012."},{"key":"e_1_2_8_21_2","unstructured":"Palisade Corporation Palisade https:\/\/www.palisade.com\/."},{"key":"e_1_2_8_22_2","volume-title":"User\u2019s Guide @Risk: Risk Analysis and Simulation Add-In for Microsoft Excel","author":"Palisade Corporation","year":"2015"},{"key":"e_1_2_8_23_2","unstructured":"Oracle Company Oracle https:\/\/www.oracle.com\/applications\/crystalball\/."},{"key":"e_1_2_8_24_2","unstructured":"Real Options ValuationInc. Real Option Valuation http:\/\/www.realoptionsvaluation.com\/."},{"key":"e_1_2_8_25_2","volume-title":"A Guide to the Project Management Body of Knowledge PMBOK\u00ae Guide","author":"Project Management Institute","year":"2017"},{"key":"e_1_2_8_26_2","first-page":"1","article-title":"Earned schedule contribution to project management","volume":"1","author":"Lipke W.","year":"2012","journal-title":"PM World Journal"},{"key":"e_1_2_8_27_2","unstructured":"AnbariF. T. Advances in earned schedule and erned value management Proceedings of the Methodology Time Management Quality Management 2011 Dallas TX USA PMI."},{"key":"e_1_2_8_28_2","doi-asserted-by":"publisher","DOI":"10.1155\/2015\/868479"},{"key":"e_1_2_8_29_2","doi-asserted-by":"publisher","DOI":"10.3846\/2029882X.2016.1152168"},{"key":"e_1_2_8_30_2","doi-asserted-by":"publisher","DOI":"10.1155\/2015\/579486"},{"key":"e_1_2_8_31_2","doi-asserted-by":"publisher","DOI":"10.1155\/2015\/190925"},{"key":"e_1_2_8_32_2","doi-asserted-by":"publisher","DOI":"10.21278\/TOF.42104"},{"key":"e_1_2_8_33_2","article-title":"Monitoring production time and cost performance by combining earned value analysis and adaptive fuzzy control","author":"Zohoori B.","year":"2018","journal-title":"Computers & Industrial Engineering"},{"key":"e_1_2_8_34_2","unstructured":"MartinsG. H.andCletoM. G. Value stream mapping and earned value analysis: a case study in the paper packaging industry in Brazil Proceedings of the 22nd International Conference on Production Research ICPR 2013 August 2013 Brazil 2-s2.0-84929353625."},{"key":"e_1_2_8_35_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-009-2406-z"},{"key":"e_1_2_8_36_2","volume-title":"Plan Maestro de Electricidad 2016-2025","author":"Ministerio de Electricidad y Energ\u00eda Renovable","year":"2017"}],"container-title":["Complexity"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/downloads.hindawi.com\/journals\/complexity\/2019\/3190830.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/downloads.hindawi.com\/journals\/complexity\/2019\/3190830.xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1155\/2019\/3190830","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,8,7]],"date-time":"2024-08-07T12:08:16Z","timestamp":1723032496000},"score":1,"resource":{"primary":{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/10.1155\/2019\/3190830"}},"subtitle":[],"editor":[{"given":"Julio","family":"Blanco-Fern\u00e1ndez","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"editor"}]}],"short-title":[],"issued":{"date-parts":[[2019,1]]},"references-count":36,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2019,1]]}},"alternative-id":["10.1155\/2019\/3190830"],"URL":"https:\/\/doi.org\/10.1155\/2019\/3190830","archive":["Portico"],"relation":{},"ISSN":["1076-2787","1099-0526"],"issn-type":[{"value":"1076-2787","type":"print"},{"value":"1099-0526","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,1]]},"assertion":[{"value":"2019-01-21","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2019-03-13","order":2,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2019-04-01","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"3190830"}}