{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,1]],"date-time":"2026-02-01T06:12:38Z","timestamp":1769926358958,"version":"3.49.0"},"reference-count":39,"publisher":"Wiley","issue":"1","license":[{"start":{"date-parts":[[2021,1,27]],"date-time":"2021-01-27T00:00:00Z","timestamp":1611705600000},"content-version":"vor","delay-in-days":26,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100004835","name":"Zhejiang University","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100004835","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["71971196"],"award-info":[{"award-number":["71971196"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["onlinelibrary.wiley.com"],"crossmark-restriction":true},"short-container-title":["Complexity"],"published-print":{"date-parts":[[2021,1]]},"abstract":"<jats:p>The construction projects in Pakistan have inherent problems of erroneous planning and schedule development. This dilemma has led to the failure of the majority of construction projects in Pakistan. Earlier researches have tried to curtail the increasing spectrum of inaccurate planning and schedule development. But not many research studies have shed light on the major factor of 2D CAD drawings interpretation problems, which are playing a key role in defective planning and scheduling. Moreover, the role of BIM, i.e., Building Information Modeling with respect to efficient planning, has not been also discussed in detail. This study has concluded a positive impact of BIM on effective planning and scheduling in the construction industry of Pakistan. About 210 responses were obtained from experienced construction professionals of Pakistan and tested via regression analysis in order to validate this argument. It has been analyzed that 2D CAD drawings are now getting primitive and 3D technology BIM is taking its place. BIM is an efficient tool for planning and scheduling. With the start of CPEC and Multi\u2010Billion Dollar investment on infrastructure, construction industry of Pakistan needs to uplift its existing standard in order to meet with international requirements. For this purpose, BIM has been recommended. It will not only assist in attaining flawless planning but will also increase the success rate of CPEC projects in Pakistan.<\/jats:p>","DOI":"10.1155\/2021\/8818296","type":"journal-article","created":{"date-parts":[[2021,1,28]],"date-time":"2021-01-28T00:35:08Z","timestamp":1611794108000},"update-policy":"https:\/\/doi.org\/10.1002\/crossmark_policy","source":"Crossref","is-referenced-by-count":42,"title":["BIM Adoption and Its Impact on Planning and Scheduling Influencing Mega Plan Projects\u2010 (CPEC\u2010) Quantitative Approach"],"prefix":"10.1155","volume":"2021","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-2130-3716","authenticated-orcid":false,"given":"Ahsan","family":"Nawaz","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3403-225X","authenticated-orcid":false,"given":"Xing","family":"Su","sequence":"additional","affiliation":[]},{"given":"Ibrahim Muhammad","family":"Nasir","sequence":"additional","affiliation":[]}],"member":"311","published-online":{"date-parts":[[2021,1,27]]},"reference":[{"key":"e_1_2_10_1_2","article-title":"The use of inforamtion technology techniques in the construction industry of Pakistan","volume":"31","author":"Memon Z. A.","year":"2012","journal-title":"Mehran University Research Journal of Engineering & Technology"},{"key":"e_1_2_10_2_2","unstructured":"NepalM. P. Staub-FrenchS. ZhangJ. LawrenceM. andPottingerR. Deriving construction features from an IFC model 1 Proceedings of the Annual Conference of the Canadian Society for Civil Engineering 2008: Partnership for Innovation 2008 New York NY USA Curran Associates Inc 426\u2013436."},{"key":"e_1_2_10_3_2","doi-asserted-by":"crossref","unstructured":"Penttil\u00e4H. RajalaM. andFreeseS. Building information modelling of modern historic buildings 2007.","DOI":"10.52842\/conf.ecaade.2007.607"},{"key":"e_1_2_10_4_2","article-title":"Whole building design: the role of buildings and the case for whole building design","volume":"32","author":"Prowler D.","year":"2012","journal-title":"National Institute of Building Sciences"},{"key":"e_1_2_10_5_2","doi-asserted-by":"publisher","DOI":"10.1002\/9780470432846"},{"key":"e_1_2_10_6_2","doi-asserted-by":"publisher","DOI":"10.3846\/20294913.2015.1087071"},{"key":"e_1_2_10_7_2","article-title":"Building modelling from antiquity to our day","volume":"23","author":"Teran J. F.","year":"2008","journal-title":"Journal of Building Information Modeling"},{"key":"e_1_2_10_8_2","doi-asserted-by":"publisher","DOI":"10.3390\/ijerph17020635"},{"key":"e_1_2_10_9_2","doi-asserted-by":"publisher","DOI":"10.3390\/risks7010024"},{"key":"e_1_2_10_10_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2015.07.002"},{"key":"e_1_2_10_11_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2011.12.003"},{"key":"e_1_2_10_12_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.proeng.2014.10.577"},{"key":"e_1_2_10_13_2","doi-asserted-by":"publisher","DOI":"10.1080\/09613218.2017.1324724"},{"key":"e_1_2_10_14_2","volume-title":"The Impact of BIM on Planning & Scheduling of in Pakistan","author":"Khan R. M. M.","year":"2020"},{"key":"e_1_2_10_15_2","doi-asserted-by":"publisher","DOI":"10.1061\/(asce)sc.1943-5576.0000191"},{"key":"e_1_2_10_16_2","unstructured":"AdhikariA.andKeungC. W. The impact of BIM on quantity surveyor\u2019s role: the contractor perspective Proceedings of the 11th International Cost Engineering Council (ICEC) World Congress and the 22nd Annual Pacific Association of Quantity Surveyors (PAQS) Conference (ICEC-PAQS Conference 2018) 2018 London UK 18\u201320."},{"key":"e_1_2_10_17_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.compind.2018.03.029"},{"key":"e_1_2_10_18_2","doi-asserted-by":"crossref","unstructured":"ChenY. JohnD. andCoxR. F. Qualitatively exploring the impact of BIM on construction performance Proceedings of the ICCREM 2018: Innovative Technology and Intelligent Construction; American Society of Civil Engineers Reston 2018 London UK 60\u201371.","DOI":"10.1061\/9780784481721.007"},{"key":"e_1_2_10_19_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2012.12.001"},{"key":"e_1_2_10_20_2","unstructured":"HussainK.andChoudhryR. Building Information Modeling (BIM) uses and applications in Pakistan construction industry Proceedings of the 13th International Conference on Construction Applications of Virtual Reality 2013 London UK 294\u2013305."},{"key":"e_1_2_10_21_2","doi-asserted-by":"publisher","DOI":"10.24205\/03276716.2020.878"},{"key":"e_1_2_10_22_2","unstructured":"FatimaA. SaleemM. andAlamgirS. Adoption and scope of building information modelling (BIM) in construction industry of Pakistan Proceedings of the 6th International Conference on Structural Engineering and Construction Management 2015 London UK 90\u201399."},{"key":"e_1_2_10_23_2","doi-asserted-by":"publisher","DOI":"10.1155\/2020\/8820021"},{"key":"e_1_2_10_24_2","unstructured":"HuZ. Z. ZhangJ. P. LuM. CaoM. andGaoS. D. Simulation and optimization of prefabricated steel-structure installation operations Proceedings of the 1st International Construction Specialty Conference 2006 Calgary Canada."},{"key":"e_1_2_10_25_2","doi-asserted-by":"publisher","DOI":"10.1061\/(asce)0733-9364(2000)126:4(251)"},{"key":"e_1_2_10_26_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2012.09.007"},{"key":"e_1_2_10_27_2","unstructured":"KymmellW. Building Information Modeling: Planning and Managing Construction Projects with 4D CAD and Simulations (McGraw-Hill Construction Series): Planning and Managing Construction Projects with 4D CAD and Simulations; McGraw Hill Professional 2007."},{"key":"e_1_2_10_28_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2004.08.012"},{"key":"e_1_2_10_29_2","doi-asserted-by":"publisher","DOI":"10.1080\/014461996373476"},{"key":"e_1_2_10_30_2","first-page":"834","article-title":"Building information modeling (BIM)","volume":"2","author":"Bhuskade S.","year":"2015","journal-title":"IRJET- International Research Journal of Engineering and Technology"},{"key":"e_1_2_10_31_2","doi-asserted-by":"publisher","DOI":"10.1080\/09613218.2016.1190579"},{"key":"e_1_2_10_32_2","doi-asserted-by":"publisher","DOI":"10.1061\/(asce)co.1943-7862.0001600"},{"key":"e_1_2_10_33_2","first-page":"176","article-title":"Status and perceptions of the application of building information modeling for improved building projects delivery in Nigeria","volume":"4","author":"Ugochukwu S.","year":"2015","journal-title":"American Journal of Engineering Research"},{"key":"e_1_2_10_34_2","doi-asserted-by":"publisher","DOI":"10.1080\/15578771.2010.544155"},{"key":"e_1_2_10_35_2","unstructured":"TulkeJ.andHanffJ. 4D construction sequence planning\u2013new process and data model Proceedings of the CIB-W78 24th International Conference on Information Technology in Construction 2007 Maribor Slovenia 79\u201384."},{"key":"e_1_2_10_36_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2010.06.003"},{"key":"e_1_2_10_37_2","doi-asserted-by":"publisher","DOI":"10.24205\/03276716.2020.877"},{"key":"e_1_2_10_38_2","first-page":"165","article-title":"Covid-19 global, pandemic impact on world economy","volume":"11","author":"Sattar M. F.","year":"2020","journal-title":"Journal of Technology and Social Science"},{"key":"e_1_2_10_39_2","doi-asserted-by":"publisher","DOI":"10.1155\/2020\/8866071"}],"container-title":["Complexity"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/downloads.hindawi.com\/journals\/complexity\/2021\/8818296.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/downloads.hindawi.com\/journals\/complexity\/2021\/8818296.xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1155\/2021\/8818296","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,8,9]],"date-time":"2024-08-09T22:29:30Z","timestamp":1723242570000},"score":1,"resource":{"primary":{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/10.1155\/2021\/8818296"}},"subtitle":[],"editor":[{"given":"Mostafa M. A.","family":"Khater","sequence":"additional","affiliation":[]}],"short-title":[],"issued":{"date-parts":[[2021,1]]},"references-count":39,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2021,1]]}},"alternative-id":["10.1155\/2021\/8818296"],"URL":"https:\/\/doi.org\/10.1155\/2021\/8818296","archive":["Portico"],"relation":{},"ISSN":["1076-2787","1099-0526"],"issn-type":[{"value":"1076-2787","type":"print"},{"value":"1099-0526","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,1]]},"assertion":[{"value":"2020-09-16","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2020-10-17","order":2,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2021-01-27","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"8818296"}}