{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,18]],"date-time":"2026-02-18T03:10:43Z","timestamp":1771384243970,"version":"3.50.1"},"reference-count":64,"publisher":"Wiley","issue":"1","license":[{"start":{"date-parts":[[2019,1,20]],"date-time":"2019-01-20T00:00:00Z","timestamp":1547942400000},"content-version":"vor","delay-in-days":19,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100003621","name":"Ministry of Science, ICT and Future Planning","doi-asserted-by":"publisher","award":["NRF-2018R1A2B6007333"],"award-info":[{"award-number":["NRF-2018R1A2B6007333"]}],"id":[{"id":"10.13039\/501100003621","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["onlinelibrary.wiley.com"],"crossmark-restriction":true},"short-container-title":["Advances in Civil Engineering"],"published-print":{"date-parts":[[2019,1]]},"abstract":"<jats:p>The main purpose of this study is to investigate the advantages of digital fabrication pertaining to construction project management, in particular, in terms of different project management factors, using case studies of irregular\u2010shaped buildings in which digital fabrication has versatile applications. This study collected secondary data corresponding to 27 construction projects of irregular\u2010shaped buildings that implemented digital fabrication. Success criteria were developed based on the Project Management Body of Knowledge (PMBOK) to assess the benefits of implementing digital fabrication for management of the considered construction projects of irregular\u2010shaped buildings. Content analysis was performed to investigate the degree of satisfaction for the success criteria of each project. With this approach, it is possible to see which success criterion appears more times as a positive factor and which ones appear as challenges or problems. Among the positive benefits of digital fabrication on construction project management, quality increase and control appeared in the highest number of projects (17 out of 27 projects) at the highest frequency (26 instances). However, among the negative benefits that were mentioned as challenging or causing difficulties of digital fabrication on construction project management, cost reduction and control appeared in the highest number of projects (14 out of 27 projects) at the highest frequency (21 instances). But it does not mean that the use of digital fabrication was overall negative.<\/jats:p>","DOI":"10.1155\/2019\/3721397","type":"journal-article","created":{"date-parts":[[2019,1,20]],"date-time":"2019-01-20T23:31:09Z","timestamp":1548027069000},"update-policy":"https:\/\/doi.org\/10.1002\/crossmark_policy","source":"Crossref","is-referenced-by-count":10,"title":["Project Benefits of Digital Fabrication in Irregular\u2010Shaped Buildings"],"prefix":"10.1155","volume":"2019","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-8559-9248","authenticated-orcid":false,"given":"Namhyuk","family":"Ham","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-7274-6619","authenticated-orcid":false,"given":"Sanghyo","family":"Lee","sequence":"additional","affiliation":[]}],"member":"311","published-online":{"date-parts":[[2019,1,20]]},"reference":[{"key":"e_1_2_10_1_2","volume-title":"Building Design and Construction: Forging Resource Efficiency and Sustainable Development","author":"UNEP","year":"2012"},{"key":"e_1_2_10_2_2","volume-title":"Climate Change 2014: Synthesis Report. Contribution of Working Groups I, II and III to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change","author":"IPCC","year":"2014"},{"key":"e_1_2_10_3_2","volume-title":"Imagining Construction\u2019s Digital Future","author":"Agarwal R.","year":"2016"},{"key":"e_1_2_10_4_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2015.05.009"},{"key":"e_1_2_10_5_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.techfore.2013.12.017"},{"key":"e_1_2_10_6_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2017.04.002"},{"key":"e_1_2_10_7_2","doi-asserted-by":"publisher","DOI":"10.1002\/bse.615"},{"key":"e_1_2_10_8_2","doi-asserted-by":"publisher","DOI":"10.1051\/matecconf\/20166600027"},{"key":"e_1_2_10_9_2","first-page":"109","article-title":"The effects of irregular shaped buildings on the perception and preference of streetscapes","volume":"47","author":"See M. J.","year":"2012","journal-title":"Journal of Korea Planning Association"},{"key":"e_1_2_10_10_2","doi-asserted-by":"publisher","DOI":"10.6106\/kjcem.2013.14.4.084"},{"key":"e_1_2_10_11_2","doi-asserted-by":"publisher","DOI":"10.6106\/kjcem.2014.15.3.038"},{"key":"e_1_2_10_12_2","first-page":"39","article-title":"Characteristic of spatial configuration in the informal structure of frank O. Gehry","volume":"22","author":"Jeon B. W.","year":"2006","journal-title":"Journal of the Architectural Institute of Korea Planning & Design"},{"key":"e_1_2_10_13_2","first-page":"20","article-title":"Our efforts to design complex-shaped tall building","volume":"56","author":"Kim J. H.","year":"2012","journal-title":"Review of Architecture and Building Science"},{"key":"e_1_2_10_14_2","first-page":"34","article-title":"Use of concrete for iconic buildings","volume":"60","author":"Park H. G.","year":"2016","journal-title":"Review of Architecture and Building Science"},{"key":"e_1_2_10_15_2","first-page":"24","article-title":"A case study on the project benefit of digital fabrication in construction projects","volume":"8","author":"Jung E. S.","year":"2018","journal-title":"KIBIM Magazine"},{"key":"e_1_2_10_16_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2013.09.032"},{"key":"e_1_2_10_17_2","doi-asserted-by":"publisher","DOI":"10.1080\/01446190500184444"},{"key":"e_1_2_10_18_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jobe.2017.10.002"},{"key":"e_1_2_10_19_2","doi-asserted-by":"publisher","DOI":"10.1016\/s0890\u20106955(02)00030\u20105"},{"key":"e_1_2_10_20_2","unstructured":"ChuA. M. Integration of CAM systems into multi-axes computerized numerical control machines Proceedings of the 2010 Second International Conference on Knowledge and Systems Engineering (KSE) October 2010 Hanoi Vietnam 119\u2013124."},{"key":"e_1_2_10_21_2","doi-asserted-by":"crossref","unstructured":"GuzikA. Digital Fabrication Inspired Design: Influence of Fabrication Parameters on a Design Process 2009 University College London Master\u2019s Thesis.","DOI":"10.52842\/conf.ecaade.2010.227"},{"key":"e_1_2_10_22_2","doi-asserted-by":"publisher","DOI":"10.1021\/sc400093k"},{"key":"e_1_2_10_23_2","doi-asserted-by":"publisher","DOI":"10.1108\/rpj\u201007\u20102013\u20100067"},{"key":"e_1_2_10_24_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.enpol.2014.08.033"},{"key":"e_1_2_10_25_2","volume-title":"The Machine That Changed the World","author":"Womack J. P.","year":"2007"},{"key":"e_1_2_10_26_2","volume-title":"Mass Customization: The New Frontier in Business Competition","author":"Joseph Pine B.","year":"1993"},{"key":"e_1_2_10_27_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4419-1120-9"},{"key":"e_1_2_10_28_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2016.04.150"},{"key":"e_1_2_10_29_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2014.09.039"},{"key":"e_1_2_10_30_2","volume-title":"Digital Fabrication in Architecture","author":"Dunn N.","year":"2012"},{"key":"e_1_2_10_31_2","volume-title":"Digital Materiality in Architecture","author":"Gramazio F.","year":"2008"},{"key":"e_1_2_10_32_2","volume-title":"FABRICATE: Negotiating Design & Making","author":"Gramazio F.","year":"2014"},{"key":"e_1_2_10_33_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.procir.2013.06.178"},{"key":"e_1_2_10_34_2","doi-asserted-by":"publisher","DOI":"10.1061\/(asce)co.1943\u20107862.0000203"},{"key":"e_1_2_10_35_2","volume-title":"Integrated Project Delivery\u2014A Working Definition","author":"Eckblad S.","year":"2007"},{"key":"e_1_2_10_36_2","doi-asserted-by":"publisher","DOI":"10.1108\/13664381111179206"},{"key":"e_1_2_10_37_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2012.12.001"},{"key":"e_1_2_10_38_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cirp.2012.05.002"},{"key":"e_1_2_10_39_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cirp.2012.05.004"},{"key":"e_1_2_10_40_2","doi-asserted-by":"publisher","DOI":"10.1007\/s11367\u2010013\u20100639\u20104"},{"key":"e_1_2_10_41_2","doi-asserted-by":"publisher","DOI":"10.1007\/s11367\u2010013\u20100547\u20107"},{"key":"e_1_2_10_42_2","doi-asserted-by":"publisher","DOI":"10.1504\/ijsm.2010.031619"},{"key":"e_1_2_10_43_2","doi-asserted-by":"publisher","DOI":"10.5539\/mas.v7n10p20"},{"key":"e_1_2_10_44_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cirp.2012.03.029"},{"key":"e_1_2_10_45_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-25914-2"},{"key":"e_1_2_10_46_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2008.11.020"},{"key":"e_1_2_10_47_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2005.11.030"},{"key":"e_1_2_10_48_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2010.02.018"},{"key":"e_1_2_10_49_2","doi-asserted-by":"publisher","DOI":"10.1108\/09699981111111148"},{"key":"e_1_2_10_50_2","doi-asserted-by":"publisher","DOI":"10.1108\/17538370910971063"},{"key":"e_1_2_10_51_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2010.09.003"},{"key":"e_1_2_10_52_2","doi-asserted-by":"publisher","DOI":"10.1023\/a:1012534014727"},{"key":"e_1_2_10_53_2","volume-title":"AIA TAP BIM Awards","author":"AIA","year":"2017"},{"key":"e_1_2_10_54_2","first-page":"25","article-title":"Comparison analysis of BIM level in the domestic and overseas BIM projects - focused on BIM jornal and award winning projects","volume":"7","author":"Koh S. H.","year":"2017","journal-title":"KIBIM Magazine"},{"key":"e_1_2_10_55_2","doi-asserted-by":"publisher","DOI":"10.1016\/s0024\u20106301(01)00097\u20108"},{"key":"e_1_2_10_56_2","volume-title":"A Guide to the Project Management Body of Knowledge (PMBOK Guide)","author":"Project Management Institute, Inc.","year":"2013"},{"key":"e_1_2_10_57_2","volume-title":"Building Information Evolved, Foundation Louis Vuitton, AIA TAP BIM Awards 2012","author":"AIA","year":"2012"},{"key":"e_1_2_10_58_2","volume-title":"WSI Design and Engineering Methodology","author":"NMoQ National Museum of Qatar","year":"2012"},{"key":"e_1_2_10_59_2","volume-title":"WSI Design Optimization SSS, Panels, Embeds","author":"NMoQ National Museum of Qatar","year":"2013"},{"key":"e_1_2_10_60_2","volume-title":"Work Method Statement Fabrication of Ultra High Performance Fiber Reinforced Concrete Panels for National Museum of Qatar","author":"NMoQ National Museum of Qatar","year":"2012"},{"key":"e_1_2_10_61_2","volume-title":"Methodology of Survey works of FRC Secondary Steel Structure for National Museum of Qatar","author":"NMoQ National Museum of Qatar","year":"2012"},{"key":"e_1_2_10_62_2","first-page":"43","article-title":"Specialty contractor\u2019s role and performance analysis for digital fabrication-focusing on the case of irregular podium construction","volume":"8","author":"Ham N. H.","year":"2018","journal-title":"KIBIM Magazine"},{"key":"e_1_2_10_63_2","unstructured":"CATIA 3DEXPERIENCE-on-the-Cloud Brings High Power Design Tools to Small Design Teams 2015."},{"key":"e_1_2_10_64_2","first-page":"44","article-title":"Irregular cladding panel fabrication for KEB Hana Bank in Samsung-dong","volume":"214","author":"Withworks","year":"2017","journal-title":"Architectural Fa\u00e7ade Magazine \u2018Exterior\u2019"}],"container-title":["Advances in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/downloads.hindawi.com\/journals\/ace\/2019\/3721397.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/downloads.hindawi.com\/journals\/ace\/2019\/3721397.xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1155\/2019\/3721397","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,8,8]],"date-time":"2024-08-08T08:52:38Z","timestamp":1723107158000},"score":1,"resource":{"primary":{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/10.1155\/2019\/3721397"}},"subtitle":[],"editor":[{"given":"Mohammad R.","family":"Hosseini","sequence":"additional","affiliation":[]}],"short-title":[],"issued":{"date-parts":[[2019,1]]},"references-count":64,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2019,1]]}},"alternative-id":["10.1155\/2019\/3721397"],"URL":"https:\/\/doi.org\/10.1155\/2019\/3721397","archive":["Portico"],"relation":{},"ISSN":["1687-8086","1687-8094"],"issn-type":[{"value":"1687-8086","type":"print"},{"value":"1687-8094","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,1]]},"assertion":[{"value":"2018-08-07","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2018-12-13","order":2,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2019-01-20","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"3721397"}}