{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,7,30]],"date-time":"2025-07-30T15:02:42Z","timestamp":1753887762078,"version":"3.41.2"},"reference-count":51,"publisher":"Wiley","issue":"1","license":[{"start":{"date-parts":[[2022,3,11]],"date-time":"2022-03-11T00:00:00Z","timestamp":1646956800000},"content-version":"vor","delay-in-days":69,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"name":"FCT\/MCTES","award":["UIDB\/04029\/2020","PD\/BD\/128015\/2016","769255"],"award-info":[{"award-number":["UIDB\/04029\/2020","PD\/BD\/128015\/2016","769255"]}]},{"name":"HYPER FCT\u2013Portuguese Scientific Foundation","award":["UIDB\/04029\/2020","PD\/BD\/128015\/2016","769255"],"award-info":[{"award-number":["UIDB\/04029\/2020","PD\/BD\/128015\/2016","769255"]}]},{"name":"European Union\u2019s Horizon","award":["UIDB\/04029\/2020","PD\/BD\/128015\/2016","769255"],"award-info":[{"award-number":["UIDB\/04029\/2020","PD\/BD\/128015\/2016","769255"]}]}],"content-domain":{"domain":["onlinelibrary.wiley.com"],"crossmark-restriction":true},"short-container-title":["Advances in Civil Engineering"],"published-print":{"date-parts":[[2022,1]]},"abstract":"<jats:p>In the context of bridge management, three main types of maintenance actions can be considered. Maintenance actions can be taken preventively before the predefined limit condition is reached, or as a corrective measure in case those limits have been reached. The third possibility corresponds to the so\u2010called \u201cdoing nothing\u201d scenario, in which no action is taken on the bridge. To be able to implement preventive maintenance, it is necessary to know the current condition of the bridge, as well as to be able to predict its performance. On the other hand, it is also important to be able to identify potentially threatening events that might occur in the analysis life period. This paper describes an integrated methodology to help bridge managers in defining an efficient maintenance program, considering the specific case of a railway bridge. The novelty of the methodology is focused on updating an existing methodology proposed by COST TU1406, by extending it to railway bridges and also by including the resilience analysis in case of a sudden event occurrence. The analysis considers a multi\u2010hazard future scenario, in which a flood event occurs while corrosion phenomena were already in place. The results show the feasibility of the proposed methodology as a support for the establishment of an efficient maintenance schedule to prevent bridge severe degradation, as well as to establish recovery plans in case of a sudden event.<\/jats:p>","DOI":"10.1155\/2022\/3010001","type":"journal-article","created":{"date-parts":[[2022,3,11]],"date-time":"2022-03-11T23:50:10Z","timestamp":1647042610000},"update-policy":"https:\/\/doi.org\/10.1002\/crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Life Cycle Analysis of a Steel Railway Bridge over the Operational Period considering Different Maintenance Scenarios: Application to a Case Study"],"prefix":"10.1155","volume":"2022","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-0590-4861","authenticated-orcid":false,"given":"Jo\u00e3o N. D.","family":"Fernandes","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-1536-2149","authenticated-orcid":false,"given":"Jos\u00e9 C.","family":"Matos","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4569-1090","authenticated-orcid":false,"given":"H\u00e9lder S.","family":"Sousa","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6356-6963","authenticated-orcid":false,"given":"M\u00e1rio R. F.","family":"Coelho","sequence":"additional","affiliation":[]}],"member":"311","published-online":{"date-parts":[[2022,3,11]]},"reference":[{"key":"e_1_2_9_1_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-94-007-2724-3"},{"key":"e_1_2_9_2_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-84996-178-3"},{"volume-title":"Asset Management \u2014 Overview, Principles and Terminology","year":"2014","author":"Iso55000","key":"e_1_2_9_3_2"},{"key":"e_1_2_9_4_2","doi-asserted-by":"publisher","DOI":"10.1016\/B978-0-7506-8511-5.10001-9"},{"key":"e_1_2_9_5_2","doi-asserted-by":"publisher","DOI":"10.2749\/101686698780488758"},{"key":"e_1_2_9_6_2","first-page":"0097","volume-title":"Kuba 4.0: The Swiss Road Structure Management System","author":"Hajdin R.","year":"2008"},{"key":"e_1_2_9_7_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-94-009-2153-5_2"},{"key":"e_1_2_9_8_2","first-page":"189","article-title":"Development and practical application of a bridge management system (J-BMS) in Japan","volume":"48","author":"Miyamoto A.","year":"2015","journal-title":"Civil Engineering Infrastructures Journal"},{"key":"e_1_2_9_9_2","unstructured":"MirzaeiZ. AdeyB. T. ThompsonP. andKlatterL. Overview of existing bridge management systems-report by the IABMAS bridge management committee Proceedings of the 7th International Conference on Bridge Maintenance Safety and Management (IABMAS 2014) 2014 Shanghai China."},{"key":"e_1_2_9_10_2","doi-asserted-by":"publisher","DOI":"10.1080\/15732470412331289396"},{"key":"e_1_2_9_11_2","unstructured":"HawkH. Bridge life-cycle cost analysis 2003 483 Transportation Research Board Washington DC NCHRP Report."},{"key":"e_1_2_9_12_2","unstructured":"PatidarV. Multi-objective optimization for bridge management systems 2007 67 Transportation Research Board Washington DC."},{"key":"e_1_2_9_13_2","doi-asserted-by":"crossref","unstructured":"MarkowM. J.andHymanW. A. Bridge management systems for transportation agency decision making 2009 397 Transportation Research Board Washington DC.","DOI":"10.17226\/14270"},{"volume-title":"Sustainable Infrastructure Management System","year":"2015","author":"SustIMS","key":"e_1_2_9_14_2"},{"key":"e_1_2_9_15_2","unstructured":"Tu1406 Quality specifications for roadway bridges standardization at a European level (BridgeSpec) 2018 https:\/\/www.tu1406.eu\/."},{"key":"e_1_2_9_16_2","doi-asserted-by":"publisher","DOI":"10.1016\/s0141-0296(01)00038-4"},{"key":"e_1_2_9_17_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jcsr.2003.10.009"},{"key":"e_1_2_9_18_2","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9445(2004)130:12(1875)"},{"key":"e_1_2_9_19_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.strusafe.2006.05.002"},{"key":"e_1_2_9_20_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.engstruct.2005.12.008"},{"key":"e_1_2_9_21_2","doi-asserted-by":"publisher","DOI":"10.1080\/15732470600627325"},{"key":"e_1_2_9_22_2","doi-asserted-by":"publisher","DOI":"10.1061\/(asce)sc.1943-5576.0000037"},{"key":"e_1_2_9_23_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.probengmech.2011.02.001"},{"key":"e_1_2_9_24_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.tafmec.2017.06.023"},{"key":"e_1_2_9_25_2","doi-asserted-by":"publisher","DOI":"10.1061\/(asce)be.1943-5592.0001361"},{"key":"e_1_2_9_26_2","doi-asserted-by":"publisher","DOI":"10.3390\/s17040936"},{"key":"e_1_2_9_27_2","doi-asserted-by":"publisher","DOI":"10.1080\/15732479.2016.1157826"},{"key":"e_1_2_9_28_2","doi-asserted-by":"publisher","DOI":"10.1080\/15732479.2012.670250"},{"key":"e_1_2_9_29_2","doi-asserted-by":"publisher","DOI":"10.1177\/0954409713501297"},{"key":"e_1_2_9_30_2","doi-asserted-by":"publisher","DOI":"10.1177\/0954409713490924"},{"key":"e_1_2_9_31_2","doi-asserted-by":"publisher","DOI":"10.1177\/1748006x17701667"},{"key":"e_1_2_9_32_2","doi-asserted-by":"publisher","DOI":"10.3390\/ijerph17217909"},{"key":"e_1_2_9_33_2","unstructured":"HajdinR. KusarM. MasovicS. LinnebergP. andAmadoJ. Establishment of a quality Control plan 2018 WG3 Technical Report."},{"key":"e_1_2_9_34_2","article-title":"Sistema de gest\u00e3o de pontes com base em custos de ciclo de vida (translation: life-cycle cost based bridge management systems)","author":"Almeida J.","year":"2013","journal-title":"Department of Civil Engineering"},{"key":"e_1_2_9_35_2","unstructured":"LeeG. C. MohanS. B. HuangC. andFardB. N. A study of US bridge failures 2013 https:\/\/www.eng.buffalo.edu\/mceer-reports\/13\/13-0008.pdf."},{"key":"e_1_2_9_36_2","unstructured":"NielsenD. ChattopadhyayG. andRamanD. Life cycle cost estimation for railway bridge maintenance Proceedings of the International Heavy Haul Association Conference 4 February 2013 New Delhi India IME 311\u2013318."},{"key":"e_1_2_9_37_2","unstructured":"KafaliC.andGrigoriuM. Rehabilitation decision analysis Proceedings of the Ninth International Conference on Structural Safety and Reliability (ICOSSAR\u201905) 19 June 2005 Rome Italy Millpress."},{"key":"e_1_2_9_38_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.engstruct.2010.08.008"},{"key":"e_1_2_9_39_2","doi-asserted-by":"publisher","DOI":"10.1533\/9780857098986.2.268"},{"key":"e_1_2_9_40_2","doi-asserted-by":"publisher","DOI":"10.1080\/13669877.2011.571789"},{"volume-title":"Eurocode 1: Actions on Structures","year":"2004","author":"Cen","key":"e_1_2_9_41_2"},{"volume-title":"Performance of Weathering Steel in Bridges","year":"1984","author":"Albrecht P.","key":"e_1_2_9_42_2"},{"key":"e_1_2_9_43_2","first-page":"339","article-title":"Reliability profiles for steel girder bridges with regard to corrosion and fatigue","volume":"39","author":"Nowak A. S.","year":"2001","journal-title":"Journal of Theoretical and Applied Mechanics"},{"key":"e_1_2_9_44_2","doi-asserted-by":"publisher","DOI":"10.2749\/101686616x14555428759046"},{"key":"e_1_2_9_45_2","doi-asserted-by":"publisher","DOI":"10.3141\/1713-05"},{"key":"e_1_2_9_46_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.engstruct.2017.12.029"},{"key":"e_1_2_9_47_2","unstructured":"KerenyiK. SofuT. andGuoJ. Hydrodynamic forces on inundated bridge decks 2009 https:\/\/www.fhwa.dot.gov\/publications\/research\/infrastructure\/hydraulics\/09028\/09028.pdf."},{"volume-title":"AASHTO LRFD Bridge Design Specifications","year":"2012","author":"Aashto","key":"e_1_2_9_48_2"},{"key":"e_1_2_9_49_2","doi-asserted-by":"publisher","DOI":"10.1061\/(asce)0733-9429(1996)122:2(112)"},{"key":"e_1_2_9_50_2","unstructured":"BurnhamM. W.andDavisD. W. Accuracy of Computed Water Surface Profiles Hydriologic Engineering Center Davis Davis CA US."},{"key":"e_1_2_9_51_2","doi-asserted-by":"publisher","DOI":"10.1061\/(asce)is.1943-555x.0000374"}],"container-title":["Advances in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/downloads.hindawi.com\/journals\/ace\/2022\/3010001.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/downloads.hindawi.com\/journals\/ace\/2022\/3010001.xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1155\/2022\/3010001","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,24]],"date-time":"2024-07-24T05:29:28Z","timestamp":1721798968000},"score":1,"resource":{"primary":{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/10.1155\/2022\/3010001"}},"subtitle":[],"editor":[{"given":"Qian","family":"Chen","sequence":"additional","affiliation":[]}],"short-title":[],"issued":{"date-parts":[[2022,1]]},"references-count":51,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2022,1]]}},"alternative-id":["10.1155\/2022\/3010001"],"URL":"https:\/\/doi.org\/10.1155\/2022\/3010001","archive":["Portico"],"relation":{},"ISSN":["1687-8086","1687-8094"],"issn-type":[{"type":"print","value":"1687-8086"},{"type":"electronic","value":"1687-8094"}],"subject":[],"published":{"date-parts":[[2022,1]]},"assertion":[{"value":"2021-09-21","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2022-02-17","order":2,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2022-03-11","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"3010001"}}