{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,18]],"date-time":"2026-08-18T02:10:48Z","timestamp":1787019048214,"version":"3.56.0"},"reference-count":43,"publisher":"SAGE Publications","issue":"3","license":[{"start":{"date-parts":[[2003,9,1]],"date-time":"2003-09-01T00:00:00Z","timestamp":1062374400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Concurrent Engineering"],"published-print":{"date-parts":[[2003,9]]},"abstract":"<jats:p>Successfully implementing concurrent development to reduce cycle time has proven difficult due to unanticipated iterations. We develop a dynamic project model that explicitly models these interactions to investigate the causes of the \u201c90% syndrome,\u201d a common form of schedule failure in concurrent development. We find that increasing concurrence and common managerial responses to schedule pressure aggravate the syndrome and degrade schedule performance and project quality. We show how understanding of and policies to avoid the 90% syndrome require integration of the technical attributes of the project, the flows of information among participants, and the behavioral decision-making heuristics participants use to respond to unanticipated problems and perturbations.<\/jats:p>","DOI":"10.1177\/106329303038031","type":"journal-article","created":{"date-parts":[[2003,11,3]],"date-time":"2003-11-03T17:14:51Z","timestamp":1067879691000},"page":"177-186","source":"Crossref","is-referenced-by-count":70,"title":["Overcoming the 90% Syndrome: Iteration Management in Concurrent Development Projects"],"prefix":"10.1177","volume":"11","author":[{"given":"David N.","family":"Ford","sequence":"first","affiliation":[{"name":"Department of Civil Engineering, Texas A&M University, College Station, TX 77843-3136, USA,"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"John D.","family":"Sterman","sequence":"additional","affiliation":[{"name":"Sloan School of Management, Massachusetts Institute of Technology, 50                        Memorial Drive, E53-351, Cambridge, MA 02142 USA"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"179","published-online":{"date-parts":[[2003,9,1]]},"reference":[{"key":"atypb1","unstructured":"1. Abdel-Hamid, T. and Madnick, S. (1991). Software Project Dynamics, An Integrated Approach, Prentice-Hall, Inc: Englewood Cliffs, NJ ."},{"key":"atypb2","doi-asserted-by":"publisher","DOI":"10.1016\/0164-1212(88)90015-5"},{"key":"atypb3","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.41.3.458"},{"key":"atypb4","unstructured":"4. Backhouse, C.J. and Brookes, N.J. (1996). Concurrent Engineering, What's Working Where, Gower, Brookfield, VT: The Design Council ."},{"key":"atypb5","unstructured":"5. Bohn, R. (July-Aug 2000). Stop Fighting Fires , Harvard Business Review, 78(4): 83-91 ."},{"key":"atypb6","doi-asserted-by":"publisher","DOI":"10.1002\/(SICI)1520-6858(1999)2:3<129::AID-SYS1>3.0.CO;2-H"},{"key":"atypb7","unstructured":"7. Clark, K.B. and Fujimoto, T. (1991). Product Development Performance, Strategy, Organization, and Management in the World Auto Industry, Boston, MA: Harvard Business School Press ."},{"key":"atypb8","doi-asserted-by":"crossref","unstructured":"8. Clark, K.B. and Fujimoto, T. (1989). Reducing the Time to Market: The Case of the World Auto Industry , Design Management Journal, v. 1(1): 49-57 .","DOI":"10.1111\/j.1948-7169.1989.tb00521.x"},{"key":"atypb9","doi-asserted-by":"publisher","DOI":"10.1002\/(SICI)1520-6858(1999)2:3<168::AID-SYS4>3.0.CO;2-7"},{"key":"atypb10","doi-asserted-by":"publisher","DOI":"10.1287\/inte.10.6.20"},{"key":"atypb11","unstructured":"11. Cooper, K.G. and Mullen, T.W (1993). Swords and Plowshares: The Rework Cycle of Defense and Commercial Software Development Projects , American Programmer, 6(5)."},{"key":"atypb12","unstructured":"12. DeMarco, T. (1982). Controlling Software Projects, New York: Yourdon ."},{"key":"atypb13","doi-asserted-by":"publisher","DOI":"10.1007\/BF01588087"},{"key":"atypb14","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.41.7.1224"},{"key":"atypb15","unstructured":"15. Ford, D.N. (1995). The Dynamics of Project Management: An Investigation of the Impacts of Project Process and Coordination on Performance, Doctoral Thesis, Cambridge, MA: Massachusetts Institute of Technology."},{"key":"atypb16","unstructured":"16. Ford, D.N., Hou, A. and Seville, D. (1993). An Exploration of Systems Product Development at Gadget Inc. Report D-4460, System Dynamics Group, Sloan School of Management, Cambridge, MA: Massachusetts Institute of Technology."},{"key":"atypb17","doi-asserted-by":"publisher","DOI":"10.1002\/(SICI)1099-1727(199821)14:1<31::AID-SDR141>3.0.CO;2-5"},{"key":"atypb18","doi-asserted-by":"publisher","DOI":"10.1002\/(SICI)1099-1727(199824)14:4<309::AID-SDR154>3.0.CO;2-5"},{"key":"atypb19","doi-asserted-by":"crossref","unstructured":"19. Ford, D.N. and Sterman, J.D. (2003). The Liar's Club: Concealing Rework in Concurrent Development, Concurrent Engineering: Research and Applications (this issue).","DOI":"10.1177\/106329303038028"},{"key":"atypb20","unstructured":"20. Forrester, J and Senge, P. (1980). Tests for Building Confidence in System Dynamics Models , TIMS Studies in the Management Sciences, 14: 209-228 ."},{"key":"atypb21","doi-asserted-by":"publisher","DOI":"10.1109\/17.509978"},{"key":"atypb22","doi-asserted-by":"publisher","DOI":"10.1109\/17.509981"},{"key":"atypb23","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.47.12.1605.10240"},{"key":"atypb24","unstructured":"24. Kiewel, B. (January 1998). Measuring Progress in Software Development, PM Network , Project Management Institute, 12(1): 29-32 ."},{"key":"atypb25","doi-asserted-by":"publisher","DOI":"10.1109\/17.509986"},{"key":"atypb26","doi-asserted-by":"crossref","unstructured":"26. Krishnan, V., Eppinger, S.D. and Whitney, D.E. (1995). A Model-Based Framework to Overlap Product Development Activities , Management Science, 43: 437-451 .","DOI":"10.1287\/mnsc.43.4.437"},{"key":"atypb27","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.44.8.1032"},{"key":"atypb28","unstructured":"28. McAllister, J. and Backhouse, C. (1996). An Evolving Product Introduction Process in Backhouse, C. and Brookes, N. (eds.) Concurrent Engineering, What Works Where. Gower. Brookfield, VT ."},{"key":"atypb29","unstructured":"29. Meyer, C. (1993). Fast Cycle Time, How to Align Purpose, Strategy, and Structure for Speed, New York: The Free Press ."},{"key":"atypb30","doi-asserted-by":"publisher","DOI":"10.1016\/S0923-4748(97)00027-1"},{"key":"atypb31","unstructured":"31. Nevins, J.L. and Whitney, D. (1989). Concurrent Design of Products & Processes, A Strategy for the Next Generation in Manufacturing, New York: McGraw-Hill ."},{"key":"atypb32","unstructured":"32. Noreen, E., Smith, D. and Mackey, J. (1995). The Theory of Constraints and its Implications for Management Accounting, Great Barrington, MA: North River Press ."},{"key":"atypb33","unstructured":"33. Patterson, M.L. (1993). Accelerating Innovation, Improving the Process of Product Development, New York: Van Nostrand Reinhold ."},{"key":"atypb34","unstructured":"34. Rosenthal, S.R. (1992). Effective Product Design and Development, Homewood, IL: Business One Irwin ."},{"key":"atypb35","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.43.8.1104"},{"key":"atypb36","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.43.3.276"},{"key":"atypb37","unstructured":"37. Sterman, J.S. (2000). Business Dynamics, Systems Thinking and Modeling for a Complex World, New York: Irwin McGraw-Hill ."},{"key":"atypb38","doi-asserted-by":"publisher","DOI":"10.1002\/sdr.4260100214"},{"key":"atypb39","doi-asserted-by":"publisher","DOI":"10.1287\/orsc.13.4.402.2948"},{"key":"atypb40","doi-asserted-by":"publisher","DOI":"10.1177\/0021886397334004"},{"key":"atypb41","unstructured":"41. Wheelwright, S.C. and Clark, K.B. (1992). Revolutionizing Product Development, Quantum Leaps in Speed, Efficiency, and Quality, New York: The Free Press ."},{"key":"atypb42","unstructured":"42. Womack, J.P., Jones, D. and Roos, D. (1990). The Machine that Changed the World, The Story of Lean Production, New York: Rawson Associates ."},{"key":"atypb43","doi-asserted-by":"publisher","DOI":"10.1109\/17.509980"}],"container-title":["Concurrent Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.1177\/106329303038031","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.1177\/106329303038031","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,28]],"date-time":"2026-04-28T14:47:52Z","timestamp":1777387672000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.1177\/106329303038031"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003,9]]},"references-count":43,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2003,9]]}},"alternative-id":["10.1177\/106329303038031"],"URL":"https:\/\/doi.org\/10.1177\/106329303038031","relation":{},"ISSN":["1063-293X","1531-2003"],"issn-type":[{"value":"1063-293X","type":"print"},{"value":"1531-2003","type":"electronic"}],"subject":[],"published":{"date-parts":[[2003,9]]}}}