{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,1,29]],"date-time":"2025-01-29T05:48:47Z","timestamp":1738129727876,"version":"3.33.0"},"reference-count":17,"publisher":"SAGE Publications","issue":"4","license":[{"start":{"date-parts":[[2008,12,1]],"date-time":"2008-12-01T00:00:00Z","timestamp":1228089600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Concurrent Engineering"],"published-print":{"date-parts":[[2008,12]]},"abstract":"<jats:p> Under the trend of lean product development thinking, more parts of a product were out-sourced or off-shored, which brings the challenges of collaboration between core enterprise and its suppliers. Both the OEM (Original Equipment Manufacturer) and its suppliers are moving toward quickly providing better products in shorter time by establishing the virtual enterprise. So, effective and efficient collaboration between them throughout the entire product and project lifecycle is becoming significantly important for the win-win situation. To address this need, a scenario for collaborative project management with supplier involvement is proposed in this article. What and how to collaborate with supplier are proposed as well. The system architecture, and the corresponding function, information, process collaboration methods are developed and implemented in this study. Indeed, it is hoped that the development of such a system for the collaboration of project lifecycle in virtual enterprise will lay the frontier basis for the further research of effective project management within virtual enterprise to pursue the most advanced competitiveness. <\/jats:p>","DOI":"10.1177\/1063293x08100025","type":"journal-article","created":{"date-parts":[[2008,12,17]],"date-time":"2008-12-17T16:53:18Z","timestamp":1229532798000},"page":"253-261","source":"Crossref","is-referenced-by-count":3,"title":["Collaborative Project Management with Supplier Involvement"],"prefix":"10.1177","volume":"16","author":[{"given":"X.H.","family":"Wang","sequence":"first","affiliation":[{"name":"School of Mechanical and Power Engineering, Shanghai\rJiao Tong University 800 Dongchuan Road, Minhang District, Shanghai, 200240,\rP.R., China"}]},{"given":"X.G.","family":"Ming","sequence":"additional","affiliation":[{"name":"School of Mechanical and Power Engineering, Shanghai\rJiao Tong University 800 Dongchuan Road, Minhang District, Shanghai, 200240,\rP.R., China,"}]},{"given":"F.B.","family":"Kong","sequence":"additional","affiliation":[{"name":"School of Mechanical and Power Engineering, Shanghai\rJiao Tong University 800 Dongchuan Road, Minhang District, Shanghai, 200240,\rP.R., China"}]},{"given":"L.","family":"Wang","sequence":"additional","affiliation":[{"name":"School of Mechanical and Power Engineering, Shanghai\rJiao Tong University 800 Dongchuan Road, Minhang District, Shanghai, 200240,\rP.R., China"}]},{"given":"C.L.","family":"Zhao","sequence":"additional","affiliation":[{"name":"School of Mechanical and Power Engineering, Shanghai\rJiao Tong University 800 Dongchuan Road, Minhang District, Shanghai, 200240,\rP.R., China"}]}],"member":"179","published-online":{"date-parts":[[2008,12,1]]},"reference":[{"volume-title":"Project Production System Laboratory of UC Berkeley","year":"2008","key":"atypb1"},{"volume-title":"University of Maryland","year":"2008","key":"atypb2"},{"key":"atypb3","unstructured":"Cambridge University (2008). Available at http:\/\/www.edc.eng.cam.ac.uk\/research\/processmanagement"},{"key":"atypb4","doi-asserted-by":"publisher","DOI":"10.1080\/00207540600810077"},{"volume-title":"Proceedings of the 36th Hawaii International Conference on System Sciences","author":"Chen, F.","key":"atypb5"},{"key":"atypb6","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(00)00224-1"},{"volume-title":"35th Annual Hawaii International Conference on System Sciences (HICSS '02)-Volume 1","author":"Romano, N.","key":"atypb7"},{"key":"atypb8","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(97)00334-2"},{"volume-title":"Model-Based Approaches to Support Process Improvement in Complex Product Development, PhD thesis","year":"2007","author":"Wynn, D.","key":"atypb9"},{"volume-title":"International Conference on Engineering Design","author":"Bell, C.","key":"atypb10"},{"key":"atypb11","doi-asserted-by":"publisher","DOI":"10.1016\/j.infsof.2007.06.007"},{"key":"atypb12","volume-title":"Product Design and Development","author":"Ulrich, K.","year":"2004","edition":"3"},{"volume-title":"proceedings of The 12th ISPE International Conference on Concurrent Engineering (CE2005): Research and Applications -Next Generation Concurrent Engineering: Smart and Concurrent Integration of Product Data, Services, and Control Strategies","author":"Ming, X.G.","key":"atypb13"},{"key":"atypb14","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X05060135"},{"volume-title":"Fundamentals of Project Management: Developing Core Competencies to Help Outperform the Competition","year":"2001","author":"Leweis, J.","key":"atypb15"},{"volume-title":"Integrated Support for Project Management","year":"1998","author":"Dixon, D.","key":"atypb16"},{"volume-title":"Proceedings of the Fourth International Conference on Web Information Systems Engineering (WISE'03)","author":"Bergamaschi, S.","key":"atypb17"}],"container-title":["Concurrent Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.1177\/1063293X08100025","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.1177\/1063293X08100025","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,1,28]],"date-time":"2025-01-28T17:39:04Z","timestamp":1738085944000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.1177\/1063293X08100025"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,12]]},"references-count":17,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2008,12]]}},"alternative-id":["10.1177\/1063293X08100025"],"URL":"https:\/\/doi.org\/10.1177\/1063293x08100025","relation":{},"ISSN":["1063-293X","1531-2003"],"issn-type":[{"type":"print","value":"1063-293X"},{"type":"electronic","value":"1531-2003"}],"subject":[],"published":{"date-parts":[[2008,12]]}}}