{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T19:31:50Z","timestamp":1777491110493,"version":"3.51.4"},"reference-count":33,"publisher":"SAGE Publications","issue":"1","license":[{"start":{"date-parts":[[2014,12,16]],"date-time":"2014-12-16T00:00:00Z","timestamp":1418688000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":["journals.sagepub.com"],"crossmark-restriction":true},"short-container-title":["Concurrent Engineering"],"published-print":{"date-parts":[[2015,3]]},"abstract":"<jats:p>A new buffer sizing method based on the uncertainty of the project is proposed in order to improve the accuracy of buffer management. Assuming that the project activities follow lognormal distribution, the model proposed first analyzes the influence of uncertainty, which is characterized as the main factor to affect the activity\u2019s duration. Fuzzy theory is then introduced to calculate the uncertainty and is adjusted using resource tightness and network complexity. Finally, a new buffer sizing model based on the uncertainty and the project attributes is introduced. The effectiveness of the method is verified by employing the Monte Carlo simulation, and the actual duration and cost are obtained on the basis of the mean and variance of the project. The experimental results show that the buffer obtained using this method is smaller than the cut and paste method but larger than the root square error method. These findings indicate that the new model is able to avoid the excessive protection issues of the cut and paste method and overcome the root square error method\u2019s problem as regards an insufficient consideration of project attributes. The method proposed fully considers the factors that affect buffer sizing, signifying that it can provide the project with effective protection and an appropriate buffer size.<\/jats:p>","DOI":"10.1177\/1063293x14561871","type":"journal-article","created":{"date-parts":[[2014,12,18]],"date-time":"2014-12-18T13:40:29Z","timestamp":1418910029000},"page":"3-12","update-policy":"https:\/\/doi.org\/10.1177\/sage-journals-update-policy","source":"Crossref","is-referenced-by-count":13,"title":["A new buffer sizing approach based on the uncertainty of project activities"],"prefix":"10.1177","volume":"23","author":[{"given":"Junguang","family":"Zhang","sequence":"first","affiliation":[{"name":"Dongling School of Economics and Management, University of Science & Technology Beijing, Beijing, P.R. China"}]},{"given":"Saike","family":"Jia","sequence":"additional","affiliation":[{"name":"Dongling School of Economics and Management, University of Science & Technology Beijing, Beijing, P.R. China"}]},{"given":"Estrella","family":"Diaz","sequence":"additional","affiliation":[{"name":"Law and Social Sciences School, University of Castilla-La Mancha, Ciudad Real, Spain"}]}],"member":"179","published-online":{"date-parts":[[2014,12,16]]},"reference":[{"key":"bibr1-1063293X14561871","first-page":"1037","volume-title":"International conference on industrial engineering and engineering management","author":"Ashtiani B","year":"2007"},{"key":"bibr2-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.649096"},{"key":"bibr3-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1016\/S0165-0114(00)00076-2"},{"issue":"5","key":"bibr4-1063293X14561871","first-page":"1029","volume":"14","author":"Chu C","year":"2008","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"bibr5-1063293X14561871","volume-title":"Critical Chain","author":"Goldratt EM","year":"1997"},{"key":"bibr6-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1057\/jors.2012.163"},{"key":"bibr7-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1016\/S0272-6963(01)00054-7"},{"key":"bibr8-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X07078931"},{"key":"bibr9-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X03038568"},{"key":"bibr10-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1016\/j.fss.2005.01.002"},{"key":"bibr11-1063293X14561871","volume-title":"Fuzzy Expert Systems","author":"Kandel A","year":"1992"},{"key":"bibr12-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X08096179"},{"key":"bibr13-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2012.10.003"},{"issue":"4","key":"bibr14-1063293X14561871","first-page":"540","volume":"17","author":"Lin L","year":"2010","journal-title":"Journal of Harbin Institute of Technology (New Series)"},{"key":"bibr15-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2007.09.012"},{"key":"bibr16-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1109\/17.277406"},{"key":"bibr17-1063293X14561871","first-page":"26","volume":"8","author":"Miyuan S","year":"2009","journal-title":"Soft Science"},{"key":"bibr18-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2010.07.012"},{"key":"bibr19-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1201\/b18205"},{"key":"bibr20-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.865091"},{"key":"bibr21-1063293X14561871","volume-title":"Information Technology Project Management","author":"Schwalbe K","year":"2006"},{"key":"bibr22-1063293X14561871","first-page":"26","volume":"8","author":"Shan MY","year":"2009","journal-title":"Soft Science"},{"key":"bibr23-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1109\/AICI.2009.192"},{"issue":"8","key":"bibr24-1063293X14561871","first-page":"1739","volume":"32","author":"Shi Q","year":"2012","journal-title":"Systems Engineering: Theory & Practice"},{"key":"bibr25-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X9800600103"},{"key":"bibr26-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.10.019"},{"issue":"9","key":"bibr27-1063293X14561871","first-page":"28","volume":"23","author":"Wu H","year":"2003","journal-title":"Systems Engineering: Theory & Practice"},{"key":"bibr28-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1109\/WiCom.2008.1805"},{"key":"bibr29-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X12438701"},{"key":"bibr30-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2013.01.010"},{"key":"bibr31-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X14541286"},{"issue":"10","key":"bibr32-1063293X14561871","first-page":"22","volume":"6","author":"Zhao ZY","year":"2008","journal-title":"Journal of UESTC (Social Sciences Edition)"},{"key":"bibr33-1063293X14561871","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000209"}],"container-title":["Concurrent Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.1177\/1063293X14561871","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/full-xml\/10.1177\/1063293X14561871","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.1177\/1063293X14561871","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,28]],"date-time":"2026-04-28T14:48:47Z","timestamp":1777387727000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.1177\/1063293X14561871"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,12,16]]},"references-count":33,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2015,3]]}},"alternative-id":["10.1177\/1063293X14561871"],"URL":"https:\/\/doi.org\/10.1177\/1063293x14561871","relation":{},"ISSN":["1063-293X","1531-2003"],"issn-type":[{"value":"1063-293X","type":"print"},{"value":"1531-2003","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,12,16]]}}}