{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T19:34:52Z","timestamp":1777491292159,"version":"3.51.4"},"reference-count":165,"publisher":"SAGE Publications","issue":"1","license":[{"start":{"date-parts":[[2019,12,11]],"date-time":"2019-12-11T00:00:00Z","timestamp":1576022400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":["journals.sagepub.com"],"crossmark-restriction":true},"short-container-title":["Concurrent Engineering"],"published-print":{"date-parts":[[2020,3]]},"abstract":"<jats:p>\n                    The problem this work aims to solve is the improvement of the leanness level of a company jeopardized by the lack of lean engagement. The objectives of the research are to present a method based on a lean self-assessment approach, consisted of a qualitative self-assessment method based on lean elements that drives an index definition associated with a roadmap. The method consists in providing a roadmap for the assessed enterprise composed by the company\u2019s lean index, recommendations and countermeasures deriving from Delphi and Kendall Coefficient of Concordance (\n                    <jats:italic toggle=\"yes\">W<\/jats:italic>\n                    ) application among lean experts, leading the assessed enterprise to achieve results in terms of lean engagement, autonomy, and decision support criteria for future resource allocation. The results demonstrated that method can highlight gaps where additional improvements and investments would be necessary in the assessed enterprise. Finally, the study concludes that the lean performance identification associated to a lean roadmap in a company can be a highly effective tool to improve lean adoption in a leanness organization.\n                  <\/jats:p>","DOI":"10.1177\/1063293x19888259","type":"journal-article","created":{"date-parts":[[2019,12,12]],"date-time":"2019-12-12T01:39:33Z","timestamp":1576114773000},"page":"3-19","update-policy":"https:\/\/doi.org\/10.1177\/sage-journals-update-policy","source":"Crossref","is-referenced-by-count":19,"title":["A roadmap for a leanness company to emerge as a true lean organization"],"prefix":"10.1177","volume":"28","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-0334-877X","authenticated-orcid":false,"given":"Leandro","family":"Silv\u00e9rio","sequence":"first","affiliation":[{"name":"Department of Materials, Manufacturing and Automation, Aeronautics Institute of Technology (ITA), S\u00e3o Jos\u00e9 dos Campos\/SP, Brazil"}]},{"given":"Lu\u00eds Gonzaga","family":"Trabasso","sequence":"additional","affiliation":[{"name":"Department of Materials, Manufacturing and Automation, Aeronautics Institute of Technology (ITA), S\u00e3o Jos\u00e9 dos Campos\/SP, Brazil"}]},{"given":"Marcus Vinicius","family":"Pereira Pess\u00f4a","sequence":"additional","affiliation":[{"name":"Department of Materials, Manufacturing and Automation, Aeronautics Institute of Technology (ITA), S\u00e3o Jos\u00e9 dos Campos\/SP, Brazil"}]}],"member":"179","published-online":{"date-parts":[[2019,12,11]]},"reference":[{"key":"e_1_3_4_2_1","doi-asserted-by":"publisher","DOI":"10.5121\/ijaia.2017.8505"},{"key":"e_1_3_4_3_1","doi-asserted-by":"publisher","DOI":"10.4018\/IJSSMET.2018010101"},{"key":"e_1_3_4_4_1","doi-asserted-by":"publisher","DOI":"10.1108\/01443579910260883"},{"key":"e_1_3_4_5_1","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X13495220"},{"key":"e_1_3_4_6_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJLSS-05-2013-0027"},{"key":"e_1_3_4_7_1","doi-asserted-by":"publisher","DOI":"10.1142\/S0219686718500233"},{"issue":"3","key":"e_1_3_4_8_1","first-page":"166","article-title":"Measuring the leanness of manufacturing systems by using fuzzy TOPSIS: a case study of the \u201cParizan Sanat\u201d company","volume":"24","author":"Alemi MA","year":"2013","unstructured":"Alemi MA, Akram R (2013) Measuring the leanness of manufacturing systems by using fuzzy TOPSIS: a case study of the \u201cParizan Sanat\u201d company. South African Journal of Industrial Engineering 24(3): 166\u2013174.","journal-title":"South African Journal of Industrial Engineering"},{"key":"e_1_3_4_9_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2012.693639"},{"key":"e_1_3_4_10_1","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X15594212"},{"key":"e_1_3_4_11_1","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X0000800304"},{"issue":"2","key":"e_1_3_4_12_1","first-page":"77","article-title":"A comparative study on journey of lean manufacturing implementation","volume":"3","author":"Anvari A","year":"2010","unstructured":"Anvari A, Norzima Z, Rosnay M, et al. (2010) A comparative study on journey of lean manufacturing implementation. Asian International Journal of Science and Technology in Production and Manufacturing Engineering 3(2): 77\u201385.","journal-title":"Asian International Journal of Science and Technology in Production and Manufacturing Engineering"},{"key":"e_1_3_4_13_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-012-4356-0"},{"issue":"16","key":"e_1_3_4_14_1","first-page":"6727","article-title":"A proposed dynamic model for a lean roadmap","volume":"5","author":"Anvari A","year":"2011","unstructured":"Anvari A, Zulkifli N, Yusuff R, et al. (2011) A proposed dynamic model for a lean roadmap. African Journal of Business Management 5(16): 6727\u20136737.","journal-title":"African Journal of Business Management"},{"issue":"49","key":"e_1_3_4_15_1","first-page":"987","article-title":"A model for evaluating the degree of leanness case study: buttermilk production line in Tehran Pegah Milk company","volume":"73","author":"Asadi S","year":"2011","unstructured":"Asadi S, Panahi H (2011) A model for evaluating the degree of leanness case study: buttermilk production line in Tehran Pegah Milk company. World Academy of Science, Engineering and Technology 73(49): 987\u2013988.","journal-title":"World Academy of Science, Engineering and Technology"},{"key":"e_1_3_4_16_1","doi-asserted-by":"publisher","DOI":"10.1109\/IEEM.2011.6118022"},{"key":"e_1_3_4_17_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.resconrec.2011.12.013"},{"key":"e_1_3_4_18_1","doi-asserted-by":"publisher","DOI":"10.1108\/10569210810907155"},{"key":"e_1_3_4_19_1","doi-asserted-by":"publisher","DOI":"10.1108\/02656719510080604"},{"issue":"2","key":"e_1_3_4_20_1","first-page":"294","article-title":"A model framework for developing industry specific quality standards for effective quality assurance in global supply chains in the new millennium","volume":"22","author":"Bandyopadhyay JK","year":"2005","unstructured":"Bandyopadhyay JK (2005) A model framework for developing industry specific quality standards for effective quality assurance in global supply chains in the new millennium. International Journal of Management 22(2): 294\u2013299.","journal-title":"International Journal of Management"},{"key":"e_1_3_4_21_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540802230405"},{"key":"e_1_3_4_22_1","volume-title":"Lean product development: making waste transparent","author":"Bauch C","year":"2004","unstructured":"Bauch C (2004) Lean product development: making waste transparent. Diploma thesis, Massachusetts Institute of Technology, Cambridge, MA."},{"key":"e_1_3_4_23_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jengtecman.2008.10.003"},{"key":"e_1_3_4_24_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.procs.2010.12.065"},{"key":"e_1_3_4_25_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-013-4966-1"},{"key":"e_1_3_4_26_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-58409-6_40"},{"key":"e_1_3_4_27_1","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2018.1486537"},{"key":"e_1_3_4_28_1","doi-asserted-by":"publisher","DOI":"10.1108\/17410380810877311"},{"key":"e_1_3_4_29_1","doi-asserted-by":"publisher","DOI":"10.1108\/20401461111119459"},{"key":"e_1_3_4_30_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2012.04.002"},{"key":"e_1_3_4_31_1","doi-asserted-by":"publisher","DOI":"10.1080\/0954412979596"},{"key":"e_1_3_4_32_1","doi-asserted-by":"publisher","DOI":"10.1108\/01443570610659883"},{"key":"e_1_3_4_33_1","doi-asserted-by":"publisher","DOI":"10.1177\/875697280603700106"},{"key":"e_1_3_4_34_1","first-page":"19","volume-title":"Proceedings of the World Congress on Engineering and Computer Science 2016","author":"Carvalhosa M","year":"2016","unstructured":"Carvalhosa M, Beatrice S, Azevedo S, et al. (2016) Proposal of a lean index development in organizational contexts. In: Proceedings of the World Congress on Engineering and Computer Science 2016, San Francisco, CA, 19\u201321 October, pp.19\u201321. San Francisco, CA: Lecture Notes in Engineering and Computer Science."},{"key":"e_1_3_4_35_1","doi-asserted-by":"publisher","DOI":"10.1108\/13683041211257411"},{"key":"e_1_3_4_36_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.destud.2010.09.005"},{"key":"e_1_3_4_37_1","doi-asserted-by":"publisher","DOI":"10.1108\/14676370510589855"},{"key":"e_1_3_4_38_1","doi-asserted-by":"publisher","DOI":"10.1007\/s12063-008-0010-2"},{"key":"e_1_3_4_39_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJOPM-12-2014-0571"},{"key":"e_1_3_4_40_1","doi-asserted-by":"publisher","DOI":"10.1080\/002075400189509"},{"key":"e_1_3_4_41_1","unstructured":"Donovan RM (2015) Lean manufacturing: performance evaluation audit. Available at: https:\/\/pt.scribd.com\/document\/44969101\/Lean-Manufacturing-Checklist-PDF (accessed 10 April 2019)."},{"key":"e_1_3_4_42_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0278-6125(05)80007-X"},{"key":"e_1_3_4_43_1","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X0100900302"},{"key":"e_1_3_4_44_1","doi-asserted-by":"publisher","DOI":"10.1080\/09544829508907913"},{"key":"e_1_3_4_45_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.procir.2014.07.132"},{"key":"e_1_3_4_46_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jom.2010.05.002"},{"key":"e_1_3_4_47_1","doi-asserted-by":"publisher","DOI":"10.1504\/IJSOM.2017.086308"},{"key":"e_1_3_4_48_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-013-4750-2"},{"key":"e_1_3_4_49_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.procir.2017.02.002"},{"issue":"5","key":"e_1_3_4_50_1","first-page":"105","article-title":"Read a plant fast","volume":"80","author":"Goodson ER","year":"2002","unstructured":"Goodson ER (2002) Read a plant fast. Harvard Business Review 80(5): 105\u2013113.","journal-title":"Harvard Business Review"},{"key":"e_1_3_4_51_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJPPM-Jun-2012-0057"},{"key":"e_1_3_4_52_1","doi-asserted-by":"publisher","DOI":"10.1108\/14635770910948268"},{"key":"e_1_3_4_53_1","doi-asserted-by":"publisher","DOI":"10.1108\/09600030911008184"},{"key":"e_1_3_4_54_1","doi-asserted-by":"publisher","DOI":"10.1287\/mksc.1050.0144"},{"key":"e_1_3_4_55_1","doi-asserted-by":"publisher","DOI":"10.1108\/17410380610688214"},{"key":"e_1_3_4_56_1","doi-asserted-by":"publisher","DOI":"10.1108\/01443570410558049"},{"key":"e_1_3_4_57_1","doi-asserted-by":"publisher","DOI":"10.1109\/IEEM.2017.8289989"},{"key":"e_1_3_4_58_1","volume-title":"Lean Manufacturing Implementation: A Complete Execution Manual for Any Size Manufacturer","author":"Hobbs DP","year":"2004","unstructured":"Hobbs DP (2004) Lean Manufacturing Implementation: A Complete Execution Manual for Any Size Manufacturer. Boca Raton, FL: J. Ross Publishing."},{"key":"e_1_3_4_59_1","volume-title":"Performance and Evaluation of Manufacturing Systems","author":"Hon KKB","year":"2003","unstructured":"Hon KKB (2003) Performance and Evaluation of Manufacturing Systems. Liverpool: Department of Engineering, University of Liverpool."},{"key":"e_1_3_4_60_1","doi-asserted-by":"publisher","DOI":"10.1504\/JGBA.2015.069528"},{"key":"e_1_3_4_61_1","doi-asserted-by":"publisher","DOI":"10.1108\/JMTM-02-2014-0013"},{"key":"e_1_3_4_62_1","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X06066195"},{"key":"e_1_3_4_63_1","volume-title":"Data Analysis in Business Research: A Step-by-Step Nonparametric Approach","author":"Israel D","year":"2009","unstructured":"Israel D (2009) Data Analysis in Business Research: A Step-by-Step Nonparametric Approach. New Delhi, India: SAGE."},{"key":"e_1_3_4_64_1","doi-asserted-by":"publisher","DOI":"10.1108\/20401461011075008"},{"key":"e_1_3_4_65_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.promfg.2018.03.125"},{"key":"e_1_3_4_66_1","doi-asserted-by":"publisher","DOI":"10.1108\/14637151311294912"},{"key":"e_1_3_4_67_1","doi-asserted-by":"publisher","DOI":"10.1108\/01443579610109820"},{"key":"e_1_3_4_68_1","doi-asserted-by":"publisher","DOI":"10.1108\/14635770911000114"},{"key":"e_1_3_4_69_1","doi-asserted-by":"publisher","DOI":"10.1016\/B978-0-12-811035-5.00022-2"},{"key":"e_1_3_4_70_1","doi-asserted-by":"publisher","DOI":"10.1080\/00345334.1985.11756910"},{"key":"e_1_3_4_71_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0166-4972(03)00142-1"},{"issue":"1","key":"e_1_3_4_72_1","first-page":"41","article-title":"Triumph of the lean production system","volume":"30","author":"Krafcik JF","year":"1988","unstructured":"Krafcik JF (1988) Triumph of the lean production system. MIT Sloan Management Review 30(1): 41\u201352.","journal-title":"MIT Sloan Management Review"},{"key":"e_1_3_4_73_1","doi-asserted-by":"publisher","DOI":"10.1080\/0954412007035"},{"key":"e_1_3_4_74_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cirpj.2011.02.001"},{"key":"e_1_3_4_75_1","doi-asserted-by":"publisher","DOI":"10.1002\/ep.670210308"},{"key":"e_1_3_4_76_1","doi-asserted-by":"publisher","DOI":"10.1504\/IJPD.2016.076922"},{"key":"e_1_3_4_77_1","doi-asserted-by":"publisher","DOI":"10.1080\/19488289.2013.818597"},{"key":"e_1_3_4_78_1","doi-asserted-by":"publisher","DOI":"10.1108\/14635770410532598"},{"key":"e_1_3_4_79_1","doi-asserted-by":"publisher","DOI":"10.1108\/01443570010332971"},{"key":"e_1_3_4_80_1","volume-title":"Proceedings of the seventh SMESME international conference: stimulating manufacturing excellence in small & medium enterprises","author":"Little D","year":"2005","unstructured":"Little D, McKinna A (2005) A lean manufacturing assessment tool for use in SMEs. In: Proceedings of the seventh SMESME international conference: stimulating manufacturing excellence in small & medium enterprises, Glasgow, 12\u201315 June. Glasgow: University of Strathclyde, Scottish School of Further Education."},{"key":"e_1_3_4_81_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJPPM-04-2013-0085"},{"issue":"6","key":"e_1_3_4_82_1","first-page":"48","article-title":"Getting ready for tomorrow\u2019s supply chain","volume":"11","author":"Lummus RR","year":"2007","unstructured":"Lummus RR (2007) Getting ready for tomorrow\u2019s supply chain. Supply Chain Management Review 11(6): 48\u201355.","journal-title":"Supply Chain Management Review"},{"key":"e_1_3_4_83_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-015-7513-4"},{"key":"e_1_3_4_84_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1540-5885.2006.00215.x"},{"key":"e_1_3_4_85_1","author":"McLeod AA","year":"2009","unstructured":"McLeod AA (2009) An assessment of small to medium size manufacturers practicing lean manufacturing in Indiana. Doctoral thesis, Purdue University, West Lafayette, IN.","journal-title":"An assessment of small to medium size manufacturers practicing lean manufacturing in Indiana"},{"key":"e_1_3_4_86_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1540-5885.2011.00843.x"},{"key":"e_1_3_4_87_1","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2015.7408467"},{"key":"e_1_3_4_88_1","doi-asserted-by":"publisher","DOI":"10.1108\/09600030910951692"},{"issue":"1","key":"e_1_3_4_89_1","first-page":"90","article-title":"Simulation-enhanced lean design process","volume":"2","author":"Marvel JH","year":"2009","unstructured":"Marvel JH, Standridge CR (2009) Simulation-enhanced lean design process. Journal of Industrial Engineering and Management 2(1): 90\u2013113.","journal-title":"Journal of Industrial Engineering and Management"},{"key":"e_1_3_4_90_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2006.12.035"},{"key":"e_1_3_4_91_1","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X15569512"},{"key":"e_1_3_4_92_1","unstructured":"Mihm J Loch CH Huchzermeuer A (2002) Modeling the problem solving dynamics in complex engineering projects. INSEAD working paper Fontainebleau."},{"key":"e_1_3_4_93_1","volume-title":"High performance product development: a systems approach to a lean product development process","author":"Morgan J","year":"2002","unstructured":"Morgan J (2002) High performance product development: a systems approach to a lean product development process. Doctoral thesis, University of Michigan, Ann Arbor, MI."},{"key":"e_1_3_4_94_1","doi-asserted-by":"publisher","DOI":"10.4324\/9781482293746"},{"key":"e_1_3_4_95_1","doi-asserted-by":"publisher","DOI":"10.1080\/21693277.2013.862159"},{"key":"e_1_3_4_96_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.promfg.2015.07.076"},{"key":"e_1_3_4_97_1","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X9800600401"},{"key":"e_1_3_4_98_1","doi-asserted-by":"publisher","DOI":"10.1108\/IJOPM-01-2015-0003"},{"key":"e_1_3_4_99_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2012.02.017"},{"key":"e_1_3_4_100_1","first-page":"1517","volume-title":"22nd Annual Conference of the International Group for Lean Construction (IGLC 2014): Understanding and Improving Project Based Production Desc","author":"Nesensohn C","year":"2014","unstructured":"Nesensohn C, Bryde D, Ochieng E, et al. (2014) Assessing lean construction maturity. In: 22nd Annual Conference of the International Group for Lean Construction (IGLC 2014): Understanding and Improving Project Based Production Desc (eds Kalsaas B. T. et al.,), Oslo, Norway, 25\u201327 June 2014, p. 1517."},{"key":"e_1_3_4_101_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2015.1096976"},{"key":"e_1_3_4_102_1","doi-asserted-by":"publisher","DOI":"10.3233\/IKS-2002-00047"},{"key":"e_1_3_4_103_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0048-7333(00)00112-8"},{"issue":"4","key":"e_1_3_4_104_1","first-page":"374","article-title":"A survey on lean manufacturing implementation in Malaysian automotive industry","volume":"1","author":"Nordin N","year":"2010","unstructured":"Nordin N, Deros B, Wahab DA (2010) A survey on lean manufacturing implementation in Malaysian automotive industry. International Journal of Innovation and Technology Management 1(4): 374\u2013380.","journal-title":"International Journal of Innovation and Technology Management"},{"key":"e_1_3_4_105_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.procir.2016.04.169"},{"key":"e_1_3_4_106_1","doi-asserted-by":"publisher","DOI":"10.4324\/9780429273018"},{"key":"e_1_3_4_107_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.879614"},{"key":"e_1_3_4_108_1","doi-asserted-by":"publisher","DOI":"10.1108\/JMTM-12-2017-0268"},{"key":"e_1_3_4_109_1","volume-title":"Proceedings of the 13th international design conference","author":"Pess\u00f4a MVP","year":"2014","unstructured":"Pess\u00f4a MVP, Seering W (2014) Trapped on the waste net: a method for identifying and prioritizing the causes of a corporations low product development performance. In: Proceedings of the 13th international design conference, Dubrovnik, Croatia, 19\u201322 May 2014."},{"key":"e_1_3_4_110_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-46792-4"},{"issue":"2","key":"e_1_3_4_111_1","first-page":"157","article-title":"Lean approach applied to product development","volume":"6","author":"Possamai O","year":"2008","unstructured":"Possamai O, Ceryno PS (2008) Lean approach applied to product development. Product: Management & Development 6(2): 157\u2013165.","journal-title":"Product: Management & Development"},{"key":"e_1_3_4_112_1","volume-title":"Proceeding of the 1994 international mechanical engineering congress and exposition","author":"Prasad B","year":"1994","unstructured":"Prasad B (1994a) Competitiveness analysis of early product introduction and technology insertion. In: Proceeding of the 1994 international mechanical engineering congress and exposition, Chicago, IL, 6\u201311 November."},{"key":"e_1_3_4_113_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4471-2101-5_1"},{"key":"e_1_3_4_114_1","doi-asserted-by":"publisher","DOI":"10.1108\/02656719510101231"},{"key":"e_1_3_4_115_1","unstructured":"Prasad B (1996a) System engineering. In: Prasad B (ed.) Concurrent Engineering Fundamentals vol. 1. Upper Saddle River NJ: Prentice Hall pp. 277\u2013318. Available at: https:\/\/www.researchgate.net\/publication\/303785805_Volume_I_Chapter_6_SYSTEM_ENGINEERING"},{"key":"e_1_3_4_116_1","volume-title":"Third ISPE International Conference on Concurrent Engineering: Research and Applications","author":"Prasad B","year":"1996","unstructured":"Prasad B (1996b) Concurrent function deployment\u2013an emerging alternative to QFD: conceptual framework. In: Third ISPE International Conference on Concurrent Engineering: Research and Applications, Toronto, Ontario, Canada, 26\u201328 August 1996. CRC Press."},{"issue":"4","key":"e_1_3_4_117_1","first-page":"279","article-title":"Concurrent engineering as an integrator for managing product development\/delivery process","volume":"12","author":"Prasad B","year":"1997","unstructured":"Prasad B (1997a) Concurrent engineering as an integrator for managing product development\/delivery process. International Journal of Materials and Product Technology 12(4\u20135\u20136): 279\u2013287.","journal-title":"International Journal of Materials and Product Technology"},{"key":"e_1_3_4_118_1","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X9700500401"},{"key":"e_1_3_4_119_1","doi-asserted-by":"publisher","DOI":"10.1108\/02635579710173158"},{"key":"e_1_3_4_120_1","first-page":"56288","article-title":"Towards life-cycle measures and metrics for concurrent product development","volume":"12","author":"Prasad B","year":"1997","unstructured":"Prasad B (1997d) Towards life-cycle measures and metrics for concurrent product development. International Journal of Materials and Product Technology 12: 56288\u201356297.","journal-title":"International Journal of Materials and Product Technology"},{"key":"e_1_3_4_121_1","doi-asserted-by":"publisher","DOI":"10.1080\/095372899233244"},{"key":"e_1_3_4_122_1","doi-asserted-by":"publisher","DOI":"10.1017\/S0890060400142052"},{"key":"e_1_3_4_123_1","doi-asserted-by":"publisher","DOI":"10.1002\/kpm.112"},{"key":"e_1_3_4_124_1","doi-asserted-by":"publisher","DOI":"10.1504\/IJMTM.2001.001429"},{"key":"e_1_3_4_125_1","doi-asserted-by":"publisher","DOI":"10.1023\/A:1007836622767"},{"key":"e_1_3_4_126_1","doi-asserted-by":"publisher","DOI":"10.1002\/sys.10008"},{"key":"e_1_3_4_127_1","first-page":"1","volume-title":"Beyond the Internet of Things: Everything Interconnected","author":"Prasad B","year":"2016","unstructured":"Prasad B (2016a) Lean, integrated & connected framework for developing smart products. In: Batalla JM, Mastorakis G, Mavromoustakis CX, et al. (eds) Beyond the Internet of Things: Everything Interconnected. Berlin: Heidelberg, pp. 1\u201325."},{"key":"e_1_3_4_128_1","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X15625098"},{"key":"e_1_3_4_129_1","doi-asserted-by":"publisher","unstructured":"Prasad B (2017) Lean Integrated & Connected (LIC) framework for concurrent engineering. DOI: 10.13140\/RG.2.2.20371.58406.","DOI":"10.13140\/RG.2.2.20371.58406."},{"key":"e_1_3_4_130_1","doi-asserted-by":"publisher","DOI":"10.1080\/095448298261589"},{"key":"e_1_3_4_131_1","doi-asserted-by":"publisher","DOI":"10.3844\/ajeassp.2009.105.119"},{"key":"e_1_3_4_132_1","doi-asserted-by":"publisher","DOI":"10.1108\/17410381011077946"},{"key":"e_1_3_4_133_1","first-page":"656","article-title":"Leanness assessment of manufacturing organizations using fuzzy TOPSIS: a case study","volume":"4","author":"Rajpurohit L","year":"2017","unstructured":"Rajpurohit L, Rachnaverma, Singh M (2017) Leanness assessment of manufacturing organizations using fuzzy TOPSIS: a case study. International Journal of Advance Engineering and Research Development 4: 656\u2013660.","journal-title":"International Journal of Advance Engineering and Research Development"},{"key":"e_1_3_4_134_1","doi-asserted-by":"publisher","DOI":"10.1051\/matecconf\/201820403018"},{"key":"e_1_3_4_135_1","volume-title":"A lean logistics assessment tool for SMES in the manufacturing sector","author":"Ramirez S","year":"2014","unstructured":"Ramirez S, Lorena D (2014) A lean logistics assessment tool for SMES in the manufacturing sector. Master\u2019s thesis, Purdue University, West Lafayette, IN."},{"issue":"2","key":"e_1_3_4_136_1","first-page":"238","article-title":"The lean index: operational\u201d lean\u201d metrics for the wood products industry","volume":"38","author":"Ray CD","year":"2006","unstructured":"Ray CD, Zuo X, Michael JH, et al. (2006) The lean index: operational\u201d lean\u201d metrics for the wood products industry. Wood and Fiber Science 38(2): 238\u2013255.","journal-title":"Wood and Fiber Science"},{"key":"e_1_3_4_137_1","doi-asserted-by":"publisher","DOI":"10.1108\/13598541011080400"},{"key":"e_1_3_4_138_1","doi-asserted-by":"publisher","DOI":"10.1108\/01443570110407436"},{"key":"e_1_3_4_139_1","doi-asserted-by":"publisher","DOI":"10.1108\/JMTM-06-2017-0098"},{"issue":"1","key":"e_1_3_4_140_1","first-page":"57","article-title":"New Concept in Leanness Development and Assessment in Plant Life Cycle (PLC)","volume":"19","author":"Sanati F","year":"2008","unstructured":"Sanati F, Seyedhosseini SM (2008) New Concept in Leanness Development and Assessment in Plant Life Cycle (PLC). International Journal of Industrial Engineering & Production Research 19(1): 57\u201365.","journal-title":"International Journal of Industrial Engineering & Production Research"},{"key":"e_1_3_4_141_1","doi-asserted-by":"publisher","DOI":"10.1590\/S0104-530X2008000300003"},{"key":"e_1_3_4_142_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.evalprogplan.2014.03.012"},{"key":"e_1_3_4_143_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2011.02.095"},{"key":"e_1_3_4_144_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0272-6963(02)00108-0"},{"key":"e_1_3_4_145_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jom.2007.01.019"},{"key":"e_1_3_4_146_1","doi-asserted-by":"publisher","DOI":"10.1108\/13683041011047858"},{"key":"e_1_3_4_147_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.promfg.2015.07.082"},{"key":"e_1_3_4_148_1","doi-asserted-by":"publisher","DOI":"10.1108\/09576060210415437"},{"key":"e_1_3_4_149_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-005-0004-2"},{"key":"e_1_3_4_150_1","doi-asserted-by":"publisher","DOI":"10.1108\/01443570710756956"},{"key":"e_1_3_4_151_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2010.04.066"},{"key":"e_1_3_4_152_1","doi-asserted-by":"publisher","DOI":"10.1108\/00251740510593602"},{"key":"e_1_3_4_153_1","doi-asserted-by":"publisher","DOI":"10.1590\/S0104-530X2008000100011"},{"key":"e_1_3_4_154_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.sbspro.2015.11.527"},{"key":"e_1_3_4_155_1","doi-asserted-by":"publisher","DOI":"10.1108\/JEDT-05-2014-0029"},{"key":"e_1_3_4_156_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2010.492408"},{"key":"e_1_3_4_157_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540903471494"},{"key":"e_1_3_4_158_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-011-3658-y"},{"key":"e_1_3_4_159_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.protcy.2013.12.327"},{"key":"e_1_3_4_160_1","volume-title":"Measuring leanness of manufacturing systems and identifying leanness target by considering agility","author":"Wan H-D","year":"2006","unstructured":"Wan H-D (2006) Measuring leanness of manufacturing systems and identifying leanness target by considering agility. Doctoral thesis, Virginia Polytechnic Institute and State University, Blacksburg, VA."},{"key":"e_1_3_4_161_1","volume-title":"Proceedings of IIE annual conference","author":"Wan HD","year":"2006","unstructured":"Wan HD, Chen F (2006) An application of slacks-based measure on quantifying leanness. In: Proceedings of IIE annual conference, Orlando, FL, 20\u201324 May. Orlando, FL: Institute of Industrial and Systems Engineers (IISE)."},{"key":"e_1_3_4_162_1","first-page":"1515","volume-title":"Proceedings of the 2007 industrial engineering research conference","author":"Wan HD","year":"2007","unstructured":"Wan HD, Chen F, Riviera L (2007) Leanness score of value stream maps. In: Proceedings of the 2007 industrial engineering research conference, Nashville, TN, 19\u201323 May, p. 1515. Nashville: Institute of Industrial and Systems Engineers (IISE)."},{"key":"e_1_3_4_163_1","volume-title":"The Machine that Changed the World","author":"Womack JP","year":"1991","unstructured":"Womack JP, Jones DT, Roos D (1991) The Machine that Changed the World. New York, NY: Harper Perennial."},{"key":"e_1_3_4_164_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2010.09.013"},{"key":"e_1_3_4_165_1","first-page":"236","volume-title":"2009 6th international conference on service systems and service management","author":"Wu S","year":"2009","unstructured":"Wu S, Wee HM (2009) How lean supply chain effects product cost and quality\u2014a case study of the ford motor company. In: 2009 6th international conference on service systems and service management, Xiamen, China, 8\u201310 June, pp. 236\u2013241. Piscataway, NJ: IEEE."},{"key":"e_1_3_4_166_1","volume-title":"Proceedings of the 2010 international conference on industrial engineering and operations management","author":"Zanjirchi SM","year":"2010","unstructured":"Zanjirchi SM, Tooranloo H, Nejad LZ (2010) Measuring organizational leanness using fuzzy approach. In: Proceedings of the 2010 international conference on industrial engineering and operations management, Dhaka, Bangladesh, 9\u201310 January."}],"container-title":["Concurrent Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.1177\/1063293X19888259","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/full-xml\/10.1177\/1063293X19888259","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.1177\/1063293X19888259","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,28]],"date-time":"2026-04-28T14:49:10Z","timestamp":1777387750000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.1177\/1063293X19888259"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,12,11]]},"references-count":165,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2020,3]]}},"alternative-id":["10.1177\/1063293X19888259"],"URL":"https:\/\/doi.org\/10.1177\/1063293x19888259","relation":{},"ISSN":["1063-293X","1531-2003"],"issn-type":[{"value":"1063-293X","type":"print"},{"value":"1531-2003","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,12,11]]}}}