{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,23]],"date-time":"2026-06-23T21:52:21Z","timestamp":1782251541077,"version":"3.54.5"},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2021,5,4]],"date-time":"2021-05-04T00:00:00Z","timestamp":1620086400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2021,5,4]],"date-time":"2021-05-04T00:00:00Z","timestamp":1620086400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Wireless Com Network"],"published-print":{"date-parts":[[2021,12]]},"abstract":"<jats:title>Abstract<\/jats:title><jats:p>The primary goal of material management is to arrange the use of materials reasonably, which is particularly important for the construction industry. Wireless communication can transmit a lot of information in time in production, which can promote the management and arrangement of building materials. In order to explore the management method of prefabricated materials, this paper compares the prefabricated building materials management based on BIM with the traditional method and the management method combining BIM and wireless communication through sampling survey and sand table simulation. This paper compares the material procurement, storage and quality in the construction stage and analyzes the material management differences of different technical methods in different stages. The results show that the average inventory turnover rate of BIM-based management method is 6 times, and that of conventional method is 4 times. However, in the construction stage, the gap between the two methods is narrowed. The combination of wireless communication and BIM leads the whole process in inventory turnover rate. The turnover times of prefabricated building materials management method based on BIM Technology is reduced to 3 times, and that of conventional method is reduced to 2 times. However, the turnover times of BIM combined with wireless communication is more than 4 times. Therefore, BIM-based prefabricated building materials management can reduce the use of funds and the occupation of warehouse, and control the quality of materials better than the traditional methods. However, the combination of BIM and wireless communication can achieve better results.<\/jats:p>","DOI":"10.1186\/s13638-021-01955-x","type":"journal-article","created":{"date-parts":[[2021,5,4]],"date-time":"2021-05-04T20:03:06Z","timestamp":1620158586000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":12,"title":["Wireless management system of prefabricated construction materials based on BIM technology"],"prefix":"10.1186","volume":"2021","author":[{"given":"Xinhua","family":"Wu","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2021,5,4]]},"reference":[{"issue":"3","key":"1955_CR1","doi-asserted-by":"publisher","first-page":"00","DOI":"10.1108\/ECAM-09-2016-0210","volume":"25","author":"Q Wang","year":"2018","unstructured":"Q. Wang, Z. Guo, T. Mei et al., Labor crew workspace analysis for prefabricated assemblies\u2019 installation: a 4D-BIM-based approach. Eng. Constr. Archit. Manag. 25(3), 00\u201300 (2018)","journal-title":"Eng. Constr. Archit. Manag."},{"issue":"1","key":"1955_CR2","first-page":"542","volume":"28","author":"Y Yan","year":"2017","unstructured":"Y. Yan, W. Xianzhong, Research and application of BIM technology in the design of prefabricated and assembled concrete structures. Agro Food Ind. Hi Tech. 28(1), 542\u2013546 (2017)","journal-title":"Agro Food Ind. Hi Tech."},{"issue":"1","key":"1955_CR3","doi-asserted-by":"publisher","first-page":"012139","DOI":"10.1088\/1755-1315\/81\/1\/012139","volume":"81","author":"G Zhanglin","year":"2017","unstructured":"G. Zhanglin, G. Si, L. Jun-E, Application of BIM technology in prefabricated buildings. IOP Conf. Ser. Earth Environ. 81(1), 012139 (2017)","journal-title":"IOP Conf. Ser. Earth Environ."},{"issue":"4","key":"1955_CR4","first-page":"165","volume":"12","author":"YF Shi","year":"2016","unstructured":"Y.F. Shi, S. Kang, P.P. Song, Research on development countermeasures of prefabricated building in china based on SWOT analysis. Constr. Econ. 12(4), 165\u2013172 (2016)","journal-title":"Constr. Econ."},{"issue":"3","key":"1955_CR5","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s13198-017-0619-3","volume":"9","author":"H Li","year":"2018","unstructured":"H. Li, A. Zhao, D. Zhang et al., Research on building software usage model based on UML model. Int. J. Syst Assur. Eng. Manag. 9(3), 1\u20139 (2018)","journal-title":"Int. J. Syst Assur. Eng. Manag."},{"issue":"2","key":"1955_CR6","first-page":"146","volume":"20","author":"S Mostafa","year":"2020","unstructured":"S. Mostafa, K.P. Kim, V.W.Y. Tam et al., Exploring the status, benefits, barriers and opportunities of using BIM for advancing prefabrication practice. Int. J. Constr. Manag. 20(2), 146\u2013156 (2020)","journal-title":"Int. J. Constr. Manag."},{"key":"1955_CR7","doi-asserted-by":"crossref","unstructured":"R. Bortolini, C.T. Formoso, D.D. Viana, Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling. Autom. Constr. 98, 248\u2013264 (2019)","DOI":"10.1016\/j.autcon.2018.11.031"},{"issue":"1","key":"1955_CR8","first-page":"15","volume":"19","author":"MM Singh","year":"2019","unstructured":"M.M. Singh, A. Sawhney, A. Borrmann, Integrating rules of modular coordination to improve model authoring in BIM. Int. J. Constr. Manag. 19(1), 15\u201331 (2019)","journal-title":"Int. J. Constr. Manag."},{"key":"1955_CR9","doi-asserted-by":"crossref","unstructured":"O.O. Akinade, L.O. Oyedele, S.O. Ajayi, et al. Designing out construction waste using BIM technology: stakeholders' expectations for industry deployment. J. Clean Prod. 180, 375\u2013385 (2018)","DOI":"10.1016\/j.jclepro.2018.01.022"},{"issue":"3","key":"1955_CR10","doi-asserted-by":"publisher","first-page":"154","DOI":"10.7763\/IJET.2019.V11.1139","volume":"11","author":"F Lindblad","year":"2019","unstructured":"F. Lindblad, K. Lehman, E. Aggerstam, A comparative study of the environmental impact from transportation of prefabricated building elements using wood or concrete. Int. J. Eng. Technol. 11(3), 154\u2013161 (2019)","journal-title":"Int. J. Eng. Technol."},{"issue":"7","key":"1955_CR11","doi-asserted-by":"publisher","first-page":"599","DOI":"10.3846\/jcem.2020.12917","volume":"26","author":"XJ Li","year":"2020","unstructured":"X.J. Li, Research on investment risk influence factors of prefabricated building projects. J. Civ. Eng. Manag. 26(7), 599\u2013613 (2020)","journal-title":"J. Civ. Eng. Manag."},{"issue":"2","key":"1955_CR12","doi-asserted-by":"publisher","first-page":"721","DOI":"10.46488\/NEPT.2020.v19i02.027","volume":"19","author":"C Nan","year":"2020","unstructured":"C. Nan, Z. Jie, Estimation of environmental damages of cement building and environmental benefits of prefabricated building: a case study based on a residential project in Henan province, China. Nat. Environ. Pollut. Technol. 19(2), 721\u2013728 (2020)","journal-title":"Nat. Environ. Pollut. Technol."},{"issue":"1","key":"1955_CR13","doi-asserted-by":"publisher","first-page":"269","DOI":"10.18280\/ijht.380129","volume":"38","author":"D Zou","year":"2020","unstructured":"D. Zou, C. Sun, Analysis for thermal performance and energy-efficient technology of prefabricated building walls. Int. J. Heat Technol. 38(1), 269\u2013273 (2020)","journal-title":"Int. J. Heat Technol."},{"issue":"5","key":"1955_CR14","first-page":"881","volume":"34","author":"Y Sun","year":"2018","unstructured":"Y. Sun, J. Liu, B. Xia et al., Study on carbon emission evaluation of prefabricated building at materialization. Stage Shenyang Jianzhu Daxue Xuebao (Ziran Kexue Ban). J. Shenyang Jianzhu Univ. (Nat. Sci.) 34(5), 881\u2013888 (2018)","journal-title":"J. Shenyang Jianzhu Univ. (Nat. Sci.)"},{"issue":"9","key":"1955_CR15","doi-asserted-by":"publisher","first-page":"2103","DOI":"10.30638\/eemj.2018.209","volume":"17","author":"JP Couto","year":"2018","unstructured":"J.P. Couto, P. Mendonca, A.P. Reis, Prefabricated building systems: evaluation of the construction practitioners\u2019 perception on the environmental and economic benefits. Environ. Eng. Manag. J. 17(9), 2103\u20132115 (2018)","journal-title":"Environ. Eng. Manag. J."},{"key":"1955_CR16","doi-asserted-by":"crossref","unstructured":"K.T. Wan, H. Zhu, T.Y.P. Yuen, et al. Development of low drying shrinkage foamed concrete and hygro-mechanical finite element model for prefabricated building fasade applications. Constr. Build. Mater. 165, 939\u2013957 (2018)","DOI":"10.1016\/j.conbuildmat.2018.01.024"},{"issue":"2","key":"1955_CR17","doi-asserted-by":"publisher","first-page":"134","DOI":"10.1108\/ECAM-02-2016-0045","volume":"25","author":"JGB Wesz","year":"2018","unstructured":"J.G.B. Wesz, C.T. Formoso, P. Tzortzopoulos, Planning and controlling design in engineered-to-order prefabricated building systems. Eng. Constr. Archit. Manag. 25(2), 134\u2013152 (2018)","journal-title":"Eng. Constr. Archit. Manag."},{"issue":"3","key":"1955_CR18","first-page":"50","volume":"62","author":"R Griffith","year":"2018","unstructured":"R. Griffith, Implementing offsite construction and prefabricated building systems. Des. Cost Data 62(3), 50\u201350 (2018)","journal-title":"Des. Cost Data"},{"issue":"05","key":"1955_CR19","first-page":"87","volume":"10","author":"S Qianqian","year":"2018","unstructured":"S. Qianqian, Design of prefabricated old-age building based on modularization: a case study of institutional elderly houses design in Taigou village, Xi\u2019an City. J. Landsc. Res. 10(05), 87\u201390 (2018)","journal-title":"J. Landsc. Res."},{"issue":"1","key":"1955_CR20","first-page":"012061","volume":"399","author":"K Zhang","year":"2018","unstructured":"K. Zhang, S. Tong, J. Zhao et al., Control method of shaft and hole mating based on convolution neural network in assembly building prefabricated components. IOP Conf. Ser. Mater. Sci. Eng. 399(1), 012061 (2018)","journal-title":"IOP Conf. Ser. Mater. Sci. Eng."},{"issue":"5","key":"1955_CR21","first-page":"012054","volume":"186","author":"Q Tang","year":"2018","unstructured":"Q. Tang, Z. Liu, W. Chen et al., The application of BIM in small and medium-sized smart substation\u2014a case study of prefabricated building design. IOP Conf. Ser. Earth Environ. Sci. 186(5), 012054 (2018)","journal-title":"IOP Conf. Ser. Earth Environ. Sci."},{"key":"1955_CR22","doi-asserted-by":"crossref","unstructured":"Y. Teng, K. Li, W. Pan, et al. Reducing building life cycle carbon emissions through prefabrication: evidence from and gaps in empirical studies. Build. Environ. 132, 125\u2013136 (2018)","DOI":"10.1016\/j.buildenv.2018.01.026"},{"key":"1955_CR23","doi-asserted-by":"crossref","unstructured":"Z. Yuan, C. Sun, Y. Wang, Design for manufacture and assembly-oriented parametric design of prefabricated buildings. Autom. Constr. 88, 13\u201322 (2018)","DOI":"10.1016\/j.autcon.2017.12.021"},{"issue":"4","key":"1955_CR24","first-page":"1","volume":"79","author":"I Garc\u00eda-Pereira","year":"2019","unstructured":"I. Garc\u00eda-Pereira, C. Portal\u00e9s, J. Gimeno et al., A collaborative augmented reality annotation tool for the inspection of prefabricated buildings. Multimedia Tools Appl. 79(4), 1\u201319 (2019)","journal-title":"Multimedia Tools Appl."},{"key":"1955_CR25","doi-asserted-by":"crossref","unstructured":"W. Ferdous, Y. Bai, T.D. Ngo, et al. New advancements, challenges and opportunities of multi-storey modular buildings\u2014a state-of-the-art review. Eng. Struct. 183, 883\u2013893 (2019)","DOI":"10.1016\/j.engstruct.2019.01.061"}],"container-title":["EURASIP Journal on Wireless Communications and Networking"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1186\/s13638-021-01955-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1186\/s13638-021-01955-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1186\/s13638-021-01955-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,5]],"date-time":"2021-05-05T07:06:19Z","timestamp":1620198379000},"score":1,"resource":{"primary":{"URL":"https:\/\/jwcn-eurasipjournals.springeropen.com\/articles\/10.1186\/s13638-021-01955-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,5,4]]},"references-count":25,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2021,12]]}},"alternative-id":["1955"],"URL":"https:\/\/doi.org\/10.1186\/s13638-021-01955-x","relation":{},"ISSN":["1687-1499"],"issn-type":[{"value":"1687-1499","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,5,4]]},"assertion":[{"value":"3 September 2020","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"22 March 2021","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"4 May 2021","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"Approved.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Consent for publication"}},{"value":"There is no potential competitive advantage in our paper. All the authors have reviewed the manuscript and agreed to submit it to your magazine. We confirm that the contents of the manuscript have not been published or submitted for publication elsewhere.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Competing interests"}}],"article-number":"116"}}