{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T00:46:50Z","timestamp":1740098810219,"version":"3.37.3"},"publisher-location":"CRC Press\/Balkema P.O. Box 11320, 2301 EH Leiden, The Netherlands","reference-count":7,"publisher":"CRC Press\/Balkema","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,3,20]]},"DOI":"10.1201\/9781315164809-69","type":"proceedings-article","created":{"date-parts":[[2017,4,19]],"date-time":"2017-04-19T09:11:52Z","timestamp":1492593112000},"page":"375-380","source":"Crossref","is-referenced-by-count":0,"title":["Total Productive Maintenance implementation. A way to improve working conditions"],"prefix":"10.1201","author":[{"given":"M","family":"Val\u00e9rio","sequence":"first","affiliation":[{"name":"Faculdade de Ci\u00eancias e Tecnologia, Universidade Nova de Lisboa, Portugal"}]},{"given":"I","family":"Nunes","sequence":"additional","affiliation":[{"name":"Faculdade de Ci\u00eancias e Tecnologia, UNIDEMI, Universidade Nova de Lisboa, Lisboa, Portugal"}]}],"member":"301","published-online":{"date-parts":[[2017,4,19]]},"reference":[{"first-page":"965","volume-title":"Seguran\u00e7a e Fiakeep equipment runnig at peak efficciency, Mc-Graw- bilidade) C. Guedes Soares, A.P. Teixeira, C. Jacinto Hill Companies","author":"Borris S.","key":"p_3"},{"volume-title":"Uptime: Nunes, I.L., Costa, A.F., Baptista, A.F. & Val\u00e9rio, M.F., Strategies for Excellence in Maintenance Management","year":"2016","author":"Campbell J.D.","key":"p_4"},{"key":"p_5","unstructured":"Digalwar, A. & Nayagam, P., 2014. Implementation of A.P. Teixeira, P. Ant\u00e3o (Ed.) Riscos P\u00fablicos e Indus-Total Productive Maintenance in Manufacturing triais, 2, pp.951-968. Industries: A Literature-Based Metadata Analysis. IUP Pinto, H.P.2013. TPM e desenvolvimento de perten\u00e7a Journal of Operations Management, 13(1), pp. 39-53. psicol\u00f3gica: an\u00e1lise de um caso.Relat\u00f3rio de Projeto"},{"key":"p_6","first-page":"980","volume":"47","author":"Fern\u00e1ndez-Mu\u00f1iz B.","year":"2009","journal-title":"Universidade de Science"},{"key":"p_7","first-page":"4383","volume-title":"Baptista J.S., Barroso M.P., Carneiro P., Equipment Efficiency. International Journal of Mod-Cordeiro P., Costa N., Melo R., Miguel AS. (Ed.) ern Engineering Research, 2(6)","author":"Freitas D.","year":"1994"},{"key":"p_8","unstructured":"Goetsch, D.L., 2011. Occupational Safety and Health Total Productive Maintenance (TPM) implementafor Technologists, Engineers and Managers, 7th Ed., tion in a machine shop: A case study.Procedia Engi-Prentice Hall. neering, 51, pp.592-599. http:\/\/dx.doi.org\/10.1016\/j."},{"volume-title":"proeng.2013.01.084","year":"2014","author":"Jafari M.M.","key":"p_9"}],"event":{"name":"Selected Contributions From the International Symposium Occupational Safety and Hygiene (Sho 2017)","location":"Guimar\u00e3es, Portugal"},"container-title":["Occupational Safety and Hygiene V"],"original-title":[],"link":[{"URL":"http:\/\/www.crcnetbase.com\/doi\/pdf\/10.1201\/9781315164809-69","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,4,19]],"date-time":"2017-04-19T09:18:14Z","timestamp":1492593494000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.crcnetbase.com\/doi\/10.1201\/9781315164809-69"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,3,20]]},"references-count":7,"alternative-id":["10.1201\/9781315164809-69","10.1201\/9781315164809"],"URL":"https:\/\/doi.org\/10.1201\/9781315164809-69","relation":{},"subject":[],"published":{"date-parts":[[2017,3,20]]}}}