{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,11]],"date-time":"2026-11-11T21:56:07Z","timestamp":1794434167537,"version":"4.9.1"},"reference-count":7,"publisher":"CRC Press","isbn-type":[{"value":"9781138000124","type":"print"},{"value":"9780203386040","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012,11,15]]},"DOI":"10.1201\/b13167-28","type":"book-chapter","created":{"date-parts":[[2012,11,28]],"date-time":"2012-11-28T12:06:40Z","timestamp":1354104400000},"page":"177-188","source":"Crossref","is-referenced-by-count":0,"title":["Integrating geophysical and hydrogeological investigations into a three dimensional model of the Sphinx area, Egypt"],"prefix":"10.1201","author":[{"given":"A","family":"Hassan","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"H","family":"Bekhit","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"301","published-online":{"date-parts":[[2012,11,28]]},"reference":[{"key":"p_2","volume-title":"J. (2005). PEST, Model Independent Param-Contract No. EDH-I-00-08-00024-00 Order No. 2. eter Estimation. User Manual","author":"AECOM ECG","edition":"5"},{"key":"p_3","unstructured":"AEEC-CWP, 2008a. Lowering of Groundwater at Wadi mark Numerical Computing, Brisbane, Queensland, Temple and Sphinx Area-Final Technical Report. Australia."},{"key":"p_4","volume-title":"Technical Report for the Drilling Doherty","author":"AEEC-CWP","year":"2009"},{"key":"p_5","volume-title":"Technical Report for the Drilling Griffiths, D.H.","author":"AEEC-CWP","year":"1965"},{"key":"p_6","volume-title":"Operation of Production Wells and Oxford","author":"AEEC-CWP","year":"2008"},{"key":"p_8","volume-title":"U.S Geological Survey Open-File Bank Project. Contract No. 27. Pyramids Area Sewers Report 00-92. and Collectors. Parasins","author":"AMBRIC","year":"1979","edition":"3"},{"key":"p_9","volume-title":"Greater Cairo Wastewater Project. West Capman and Hall","author":"AMBRIC"}],"container-title":["Groundwater Modeling and Management under Uncertainty"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.crcnetbase.com\/doi\/pdf\/10.1201\/b13167-28","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2016,9,6]],"date-time":"2016-09-06T15:54:27Z","timestamp":1473177267000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.crcnetbase.com\/doi\/10.1201\/b13167-28"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,11,15]]},"ISBN":["9781138000124","9780203386040"],"references-count":7,"alternative-id":["10.1201\/b13167-28","10.1201\/b13167"],"URL":"https:\/\/doi.org\/10.1201\/b13167-28","relation":{"is-part-of":[{"id-type":"doi","id":"https:\/\/doi.org\/10.1201\/b13167","asserted-by":"object"}]},"subject":[],"published":{"date-parts":[[2012,11,15]]}}}