{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,17]],"date-time":"2026-03-17T15:56:42Z","timestamp":1773763002650,"version":"3.50.1"},"reference-count":14,"publisher":"Engineering and Technology Publishing","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["JCM"],"published-print":{"date-parts":[[2016]]},"DOI":"10.12720\/jcm.11.8.779-784","type":"journal-article","created":{"date-parts":[[2016,12,2]],"date-time":"2016-12-02T08:37:45Z","timestamp":1480667865000},"source":"Crossref","is-referenced-by-count":2,"title":["A Close-Loop Conformance Testing System of IEC 61850"],"prefix":"10.12720","author":[{"name":"State Grid Sichuan Electric Power Research Institute, Chengdu, China","sequence":"first","affiliation":[]},{"given":"Yongkang","family":"Zheng","sequence":"first","affiliation":[]},{"given":"Mingliang","family":"Wu","sequence":"additional","affiliation":[]},{"given":"Zhiqiang","family":"Peng","sequence":"additional","affiliation":[]}],"member":"4977","published-online":{"date-parts":[[2016]]},"reference":[{"key":"ref0","unstructured":"[1] TC57, IEC 61850 Communication Networks and Systems in Substations, International Electrotechnical Commission Std. 2003."},{"key":"ref1","doi-asserted-by":"crossref","unstructured":"[2] J. Tan, C. Zhang, and Z. Bo, \"The importance of IEC 61850 interoperability testing,\" in Proc. 43rd International Universities Power Engineering Conference, 2008, pp. 1-5.","DOI":"10.1109\/UPEC.2008.4651594"},{"key":"ref2","unstructured":"[3] H. Cui, X. Tang, Z. Liang, et al., \"Study on IEC 61850 conformance testing,\" Automation of Electric Power Systems, vol. 30, no. 8, pp. 80-83, 2006."},{"key":"ref3","unstructured":"[4] D. Wang, C. Yan, J. Bi, et al., \"Conformance testing of IEC 61850 in substation on-line monitoring system,\" Automation of Electric Power Systems, vol. 2, no. 19, pp. 79-85, 2013."},{"key":"ref4","doi-asserted-by":"crossref","unstructured":"[5] T. H. Yeh, S. C. Hsu, C. K. Chung, et al, \"Conformance test for IEDs based on IEC 61850 communication protocol,\" Journal of Power & Energy Engineering, vol. 3, no. 4, pp. 18-23, 2015.","DOI":"10.4236\/jpee.2015.34039"},{"key":"ref5","unstructured":"[6] Y. Yong-Biao \"Performance testing of merging unit based on the IEC 61850 standard,\" Power System Technology, 2006, S2."},{"key":"ref6","unstructured":"[7] Substation Communication Network and System, DL\/Z 860.1-2004."},{"key":"ref7","unstructured":"[8] H. Shu, Q. Cui, X. Song, et al, \"Study of IEEE 1588 conformance testing in electric power system,\" Power System Technology, vol. 36, no. 6, pp. 89-94, 2012."},{"key":"ref8","unstructured":"[9] J. Liu, J. Zhang, and T. Liu, \"Real-Time closed-loop testing system of digital protection in intelligent substation,\" Electric Power Science & Engineering, vol. 31, no. 12, pp. 22-28, 2015."},{"key":"ref9","unstructured":"[10] G. Li, D. Zhang, Q. Deng, et al., \"Design and implement of conformance test system for sub-station based on IEC 61850-9-2 LE,\" Power System Protection and Control, vol. 38, no. 6, pp. 115-118, 2010."},{"key":"ref10","unstructured":"[11] Y. Pan, D. Shen, and C. Yang, \"Coherence test of IEC 61850-based substation automation system,\" Electric Power Automation Equipment, vol. 29, no. 4, pp. 143-146, 2009."},{"key":"ref11","doi-asserted-by":"crossref","unstructured":"[12] N. H. Lee, B. T. Jang, Y. H. An, et al, \"A study on the development of model based SA client conformance testing system,\" Journal of International Council on Electrical Engineering, vol. 2, no. 1, pp. 1-5, 2014.","DOI":"10.5370\/JICEE.2012.2.1.001"},{"key":"ref12","unstructured":"[13] L. Ma, H. Yang, Y. Ru, et al, \"Implementation of conformance test software based on MMS-EASE for ACSI services of intelligent device,\" Electric Power Automation Equipment, vol. 32, no. 3, pp. 109-112, 2012."},{"key":"ref13","unstructured":"[14] Y. Wang, Y. Yu, D. Zhang, et al., \"Descr iption method of substation communication protocol conformance test model based on EFSM,\" Electric Power Automation Equipment, vol. 28, no. 4, pp. 91-94, 2008."}],"container-title":["Journal of Communications"],"original-title":[],"link":[{"URL":"http:\/\/www.jocm.us\/uploadfile\/2016\/0826\/20160826044755566.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,1,28]],"date-time":"2019-01-28T06:13:31Z","timestamp":1548656011000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.jocm.us\/index.php?m=content&c=index&a=show&catid=165&id=1019"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"references-count":14,"URL":"https:\/\/doi.org\/10.12720\/jcm.11.8.779-784","relation":{},"ISSN":["2374-4367"],"issn-type":[{"value":"2374-4367","type":"print"}],"subject":[],"published":{"date-parts":[[2016]]}}}