{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,20]],"date-time":"2025-11-20T18:19:20Z","timestamp":1763662760125},"reference-count":69,"publisher":"Springer Science and Business Media LLC","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Wirtsch. Inform."],"published-print":{"date-parts":[[2008,4]]},"DOI":"10.1365\/s11576-008-0028-y","type":"journal-article","created":{"date-parts":[[2009,1,29]],"date-time":"2009-01-29T14:26:29Z","timestamp":1233239189000},"page":"88-97","source":"Crossref","is-referenced-by-count":11,"title":["RefModPM: A Conceptual Reference Model for Project Management Information Systems"],"prefix":"10.1007","volume":"50","author":[{"given":"Frederik","family":"Ahlemann","sequence":"first","affiliation":[]},{"given":"Gerold","family":"Riempp","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2008,6,20]]},"reference":[{"key":"28_CR1","unstructured":"Abels, Sven; Ahlemann, Frederik; Hahn, Axel; Hausmann, Kevin; Strickmann, Jan (2006): PROMONT A Project Management Ontology as a Reference for Virtual Project Organizations. In: Lecture Notes in Computer Science (4277), pp. 813\u2013823."},{"key":"28_CR2","unstructured":"Ahlemann, Frederik; Gastl, Heike (2007): Process model for an Empirically Grounded Reference Model Construction. In: Fettke, Peter; Loos, Peter (eds.): Reference Modeling for Business Systems Analysis. Idea Group Publishing, Hershey, USA, pp. 77\u201397."},{"key":"28_CR3","doi-asserted-by":"crossref","unstructured":"Ahlemann, Frederik (2007): Eine neue DIN-Norm zum Projektmanagement: Eine kritische Analyse aus Sicht der Wirtschaftsinformatik. In: HMD \u2013 Praxis der Wirtschaftsinformatik (255), pp. 104\u2013114.","DOI":"10.1007\/BF03340292"},{"key":"28_CR4","unstructured":"Angermeier, G. (2005): Genormtes Datenmodell f\u00fcr Projektmanagement: Katalysator f\u00fcr eine projektorientierte Wirtschaft? In: Projekt Magazin (6) http:\/\/www.projektmagazin.de\/, retrieved 2007\u201310\u201326."},{"key":"28_CR5","unstructured":"Archer, N.; Ghasemzadeh, F. (1999): Project Portfolio Selection Techniques: A Review and a Suggested Integrated Approach. In: Dye, L. D.; Pennypacker, J. S. (eds.): Project Portfolio Management. Selecting and Prioritizing Projects for Competitive Advantage. Center of Business Practices, West Chester, PA, USA, pp. 207\u2013238."},{"key":"28_CR6","unstructured":"Batini, C.; Ceri, Stefano; Navathe, S. B. (1992): Conceptual Database Design \u2013 An Entity-Relationship-Approach. Benjamin Cummings, Redwood City."},{"key":"28_CR7","doi-asserted-by":"crossref","unstructured":"Becker, J\u00f6rg (1991): CIM \u2013 Integrationsmodell. Die EDV-gest\u00fctzte Verbindung betrieblicher Bereiche. Springer, Berlin.","DOI":"10.1007\/978-3-642-76522-3"},{"key":"28_CR8","unstructured":"Becker, J\u00f6rg; Rosemann, Michael; Sch\u00fctte, Reinhard (1995): Grunds\u00e4tze ordnungsm\u00e4ssiger Modellierung. In: WIRTSCHAFTSINFORMATIK 37 (5), pp. 435\u2013445."},{"key":"28_CR9","unstructured":"Becker, J\u00f6rg; Sch\u00fctte, Reinhard (1996): Handelsinformationssysteme. 1. edn, Verlag Moderne Industrie, Landsberg."},{"key":"28_CR10","unstructured":"vom Brocke, J. (2003): Referenzmodellierung \u2013 Gestaltung und Verteilung von Konstruktionsprozessen. Logos, Berlin."},{"key":"28_CR11","unstructured":"Burghardt, M. (2002): Projektmanagement: Leitfaden f\u00fcr die Planung, \u00dcberwachung und Steuerung von Entwicklungsprojekten. 6. edn, Publicis MCD, Erlangen."},{"key":"28_CR12","doi-asserted-by":"crossref","unstructured":"Chang, C. K.; Christensen, M. J.; Zhang, T. (2001): Genetic Algorithms for Project Management. In: Annals of Software Engineering 11 (1), pp. 107\u2013139.","DOI":"10.1023\/A:1012543203763"},{"key":"28_CR13","unstructured":"Caupin, Gilles; Knoepfel, Hans; Koch, Gerrit; Pannenb\u00e4cker, Klaus; P\u00e9rez-Polo, Francisco; Seabury, Chris (eds.) (2006): ICB \u2013 IPMA Competence Baseline, Version 3.0. International Project Management Assocation, Nijkerk, Netherlands."},{"key":"28_CR14","unstructured":"Cleland, D. I.; Ireland, L. R. (2002): Project Management. Strategic Design and Implementation. McGraw-Hill, London et al."},{"key":"28_CR15","doi-asserted-by":"crossref","unstructured":"Cooke-Davies, T. (2002): The \u201creal\u201d success factors on projects. In: International Journal of Project Management 20 (3), pp. 185\u2013195.","DOI":"10.1016\/S0263-7863(01)00067-9"},{"key":"28_CR16","unstructured":"Deutsches Institut f\u00fcr Normung e.V. (1987): DIN 69901 Begriffe der Projektwirtschaft. Beuth, Berlin."},{"key":"28_CR17","doi-asserted-by":"crossref","unstructured":"Dias de Figueiredo, Ant\u00f3nio; Rupino da Cunha, Paulo (2007): Action Research and Design in Information Systems: Two Faces of a Single Coin. In: Kock, N. (ed.) Information Systems Action Research. Springer, New York, pp. 61\u201396.","DOI":"10.1007\/978-0-387-36060-7_4"},{"key":"28_CR18","unstructured":"Dworatschek, S.; Hayek, A. (1992): Marktspiegel Projekt-Management Software \u2013 Kriterienkatalog und Leistungsprofile. 3. edn, Verlag T\u00dcV Rheinland, K\u00f6ln."},{"key":"28_CR19","unstructured":"Ehlers, P. (1997): Integriertes Projekt- und Proze\u00dfmanagement auf Basis innovativer Informations- und Kommunikationstechnologien: Das GroupProject-System. Shaker, Aachen."},{"key":"28_CR20","doi-asserted-by":"crossref","unstructured":"Fettke, Peter; Loos, Peter (2004a): Referenzmodellierungsforschung. In: WIRTSCHAFTSINFORMATIK 46 (5), pp. 331\u2013340.","DOI":"10.1007\/BF03250947"},{"key":"28_CR21","unstructured":"Fettke, Peter; Loos, Peter (2004b): Referenzmodellierungsforschung Langfassung eines Aufsatzes. Working Papers of the Research Group Information Systems & Management, ISYM \u2013 Information Systems & Management, Mainz."},{"key":"28_CR22","unstructured":"Fettke, Peter; Loos, Peter (2004c): Entwicklung eines Bezugsrahmens zur Evaluierung von Referenzmodellen \u2013 Langfassung eines Beitrages. Working Papers of the Research Group Information Systems & Management, No. 20, ISYM \u2013 Information Systems & Management, Mainz."},{"key":"28_CR23","doi-asserted-by":"crossref","unstructured":"Frank, Ulrich (2007): Evaluation of Reference Models. In: Fettke, Peter; Loos, Peter (eds.): Reference Modeling for Business Systems Analysis. Idea Group Publishing, Hershey et al., pp. 118\u2013140.","DOI":"10.4018\/978-1-59904-054-7.ch006"},{"key":"28_CR24","unstructured":"Froese, T. (1992): Integrated Computer-Aided Project Management Through Standard Object-Oriented Models. Center for Integrated Facility Engineering, Stanford."},{"key":"28_CR25","unstructured":"Froese, T. (1994): Developments to the IRMA Model of AEC. In: Computing in Civil Engineering \u2013 Proceedings of the First Congress held in conjunction with A\/E\/C Systems \u201894. New York, pp. 778\u2013785."},{"key":"28_CR26","unstructured":"Froese, T.; Yu, Q. K. (1994): StartPlan: Producing Schedule Templates Using IRMA. In: Computing in Civil Engineering \u2013 Proceedings of the First Congress held in conjunction with A\/E\/C Systems \u201894. New York, pp. 63\u201370."},{"key":"28_CR27","unstructured":"Hansen, Hans Robert; Neumann, Gustaf (2005): Wirtschaftsinformatik 1 \u2013 Grundlagen und Anwendungen. Lucius & Lucius, Stuttgart."},{"key":"28_CR28","doi-asserted-by":"crossref","unstructured":"Hartmann, S. (2002): A Self-Adapting Genetic Algorithm for Project Scheduling under Resource Constraints. In: Naval Research Logistics 49 (5), pp. 433\u2013448.","DOI":"10.1002\/nav.10029"},{"key":"28_CR29","unstructured":"Hayek, A. (1993): Projektmanagement-Software: Anforderungen und Leistungsprofile, Verfahren der Bewertung und Auswahl sowie Nutzungsorganisation von Projekt-Software. Verlag T\u00dcV Rheinland, K\u00f6ln."},{"key":"28_CR30","doi-asserted-by":"crossref","unstructured":"Hevner, Alan R.; March, Salvatore T.; Park, Jinsoo; Ram, Sudha (2004): Design Science in Information Systems Research. In: MIS Quarterly 28 (1), pp. 75\u2013105.","DOI":"10.2307\/25148625"},{"key":"28_CR31","unstructured":"Jantzen-Homp, D. (2000): Projektportfolio-Management \u2013 Multiprojektarbeit im Unternehmungswandel. Deutscher Universit\u00e4tsverlag, Wiesbaden."},{"key":"28_CR32","unstructured":"Jeckle, M. (2004) Unified Modelling Language (UML) Tools. http:\/\/www.jeckle.de\/files\/umltools.pdf, retrieved 2006\u201308\u201301."},{"key":"28_CR33","unstructured":"Karstila, K.; Bj\u00f6rk, B. C.; Hannus, M. (1991): A conceptual framework for design and construction information. In: Proceedings 1st International Symposium on Building Systems Automation-Integration. Madison, Wisconsin."},{"key":"28_CR34","unstructured":"Kerzner, H. (2003): Projekt-Management: Ein systemorientierter Ansatz zur Planung und Steuerung. 8. edn, mitp-Verlag, Bonn."},{"key":"28_CR35","unstructured":"Kolisch, R.; Hempel, K. (1995): Experimentelle Evaluation der methodischen Fundierung von Projektmanagementsoftware. Institut f\u00fcr Betriebswirtschaftslehre, Lehrstuhl f\u00fcr Produktion und Logistik, Universit\u00e4t Kiel."},{"key":"28_CR36","doi-asserted-by":"crossref","unstructured":"Kolisch, Rainer; Meyer, Konrad; Mohr, Roland (2005): Maximizing R&D Portfolio Value. In: Research Technology Management 48 (3), pp. 33\u201339.","DOI":"10.1080\/08956308.2005.11657313"},{"key":"28_CR37","doi-asserted-by":"crossref","unstructured":"Krcmar, Helmut (2003): Informationsmanagement. 3. edn, Springer, Berlin et al.","DOI":"10.1007\/978-3-662-07899-0"},{"key":"28_CR38","doi-asserted-by":"crossref","unstructured":"Kurbel, K. (1994): Groupware extension for a software-project management system. In: International Journal of Project Management 12 (4), pp. 222\u2013229.","DOI":"10.1016\/0263-7863(94)90046-9"},{"key":"28_CR39","unstructured":"Lechler, T. (1997): Erfolgsfaktoren des Projektmanagements. Lang, Frankfurt a.M. et al."},{"key":"28_CR40","unstructured":"Lee, Allen S. (2007): Action is an Artifact: What Action Research and Design Science Offer to Each Other. In: Kock, N. (ed.): Information Systems Action Research. Springer, New York, pp. 43\u201360."},{"key":"28_CR41","unstructured":"Luiten, G.; Froese, T.; Bj\u00f6rk, B. C.; Cooper, G.; Junge, R.; Karstila, K.; Oxman, R. (1993): An Information Reference Model for Architecture, Engineering, and Construction. In: The Proceedings of the First International Conference on the Management of Information Technology for Construction. Singapore, pp. 391\u2013406."},{"key":"28_CR42","doi-asserted-by":"crossref","unstructured":"Lincoln, Y. S.; Guba, E. G. (1985): Naturalistic Inquiry. Sage, Beverly Hills, California.","DOI":"10.1016\/0147-1767(85)90062-8"},{"key":"28_CR43","doi-asserted-by":"crossref","unstructured":"Liesio, Juuso; Mild, Pekka; Salo, Ahti (2007): Robust portfolio modeling with incomplete cost information and project interdependencies. In: European Journal of Operational Research (in Press, Corrected Proof).","DOI":"10.1016\/j.ejor.2007.06.049"},{"key":"28_CR44","unstructured":"Luiten, G. T.; Bakkeren, W. J. C. (1992): A Layered Modelling Methodology applied to the Building and Construction Industry. In: Workshop on Models for Computer Integrated Construction (CIC). Finland."},{"key":"28_CR45","unstructured":"Matthes, G. (2006): Unterlage zum 9. PLANTA-Anwenderforum, 17.-19. Mai 2006. Planta, Karlsruhe."},{"key":"28_CR46","unstructured":"Meise, Volker (2001): Ordnungsrahmen zur prozessorientierten Organisationsgestaltung \u2013 Modelle f\u00fcr das Management komplexer Reorganisationsprojekte. Verlag Dr. Kovac, Hamburg."},{"key":"28_CR47","unstructured":"Meyer, M. M. (2007): Softwareunterst\u00fctzung f\u00fcr das Projektmanagement. Auswahl, Einf\u00fchrung und Einsatz softwaregest\u00fctzter Instrumente, Anforderungen und L\u00f6sungen sowie medialer Transfer. Universit\u00e4t Bremen, Institut f\u00fcr Projektmanagement und Innovation, Bremen."},{"key":"28_CR48","unstructured":"Morris, P. W. G. (1983): Managing Project Interfaces \u2013 Key Points for Project Success. In: Cleland, D. I.; King, W. R. (eds.): Project Management Handbook. Van Nostrand Reinhold Company, New York et al., pp. 3\u201336."},{"key":"28_CR49","doi-asserted-by":"crossref","unstructured":"Moody, D. L.; Shanks, G. G. (1994): What Makes a Good Data Model? Evaluating the Quality of Entity Relationship Models. In: 13th International Conference on the Entity-Relationship Approach. Manchester, pp. 94\u2013111.","DOI":"10.1007\/3-540-58786-1_75"},{"key":"28_CR50","unstructured":"Patton, M. Q. (2002): Qualitative Research & Evaluation Methods. 3. edn, Sage, Thousand Oaks."},{"key":"28_CR51","unstructured":"Project Management Institute (2004): A Guide to the Project Management Body of Knowledge. 3. edn, Project Management Institute, Newton Square, PA, USA."},{"key":"28_CR52","unstructured":"Rabl, W.; Fiedler, S. (1994): Projektmanagement-Software: Markt\u00fcbersicht und Entwicklungstrends. In: Gareis, R. (ed.): Projekte & EDV. Service-Fachverlag, Wien, pp. 37\u201354."},{"key":"28_CR53","unstructured":"Russell, Nick; van der Aalst, Wil M. P.; ter Hofstede, Arthur H. M.; Wohed, Petia (2006): On the suitability of UML 2.0 activity diagrams for business process modelling. In: Third Asia-Pacific Conference on Conceptual Modelling (APCCM2006). Hobart, Australia, pp. 95\u2013104."},{"key":"28_CR54","unstructured":"Rautenstrauch, Claus (1993): Integration Engineering \u2013 Konzeption, Entwicklung und Einsatz integrierter Softwaresysteme. Addison-Wesley, Bonn."},{"key":"28_CR55","unstructured":"Raymond, L. (1987): Information systems design for project management: A data modeling approach. In: Project Management Journal 18 (4), pp. 94\u201399."},{"key":"28_CR57","unstructured":"Schelle, H. (2005a): Projektmanagement und Gesch\u00e4ftsfeldstrategie. In: Schelle, H.; Reschke, H.; Schnopp, R.; Schub, A. (eds.): Projekte erfolgreich managen. 26. edn., T\u00dcV-Verlag, K\u00f6ln, chapter 2.2."},{"key":"28_CR58","unstructured":"Schelle, H. (2005b): Die Lehre vom Projektmanagement: Entwicklung und Stand. In: Schelle, H.; Reschke, H.; Schnopp, R.; Schub, A. (eds.): Projekte erfolgreich managen. 26. edn., T\u00dcV-Verlag, K\u00f6ln, chapter 1.2."},{"key":"28_CR56","unstructured":"Schermann, Michael; B\u00f6hmann, Tilo; Krcmar, Helmut (2007): Fostering the Evaluation of Reference Models: Application and Extension of the Concept of IS Design Theories. In: eOrganisation: Service-, Prozess-, Market-Engineering: 8. Internationale Tagung Wirtschaftsinformatik. W\u00fcrzburg, pp. 181\u2013198."},{"key":"28_CR59","doi-asserted-by":"crossref","unstructured":"Schlagheck, Bernhard (2000): Objektorientierte Referenzmodelle f\u00fcr das Prozess- und Projektcontrolling: Grundlagen \u2013 Konstruktion \u2013 Anwendungsm\u00f6glichkeiten. Gabler, Wiesbaden.","DOI":"10.1007\/978-3-663-07993-4"},{"key":"28_CR64","doi-asserted-by":"crossref","unstructured":"Schmidt, R.; Schor, G. (1987): Modell und Erkl\u00e4rung in den Wirtschaftswissenschaften. In: Schmidt, R.; Schor, G. (eds.): Modelle in der Betriebswirtschaft. Gabler, Wiesbaden, pp. 9\u201336.","DOI":"10.1007\/978-3-322-91691-4_1"},{"key":"28_CR60","doi-asserted-by":"crossref","unstructured":"Sch\u00fctte, Reinhard (1998): Grunds\u00e4tze ordnungsm\u00e4ssiger Referenzmodellierung: Konstruktion konfigurations- und anpassungsorientierter Modelle. Gabler, Wiesbaden.","DOI":"10.1007\/978-3-663-10233-5"},{"key":"28_CR61","doi-asserted-by":"crossref","unstructured":"Sch\u00fctte, R. (1999): Basispositionen in der Wirtschaftsinformatik \u2013 ein gem\u00e4\u00dfigt-konstruktivistisches Programm. In: Becker, J.; K\u00f6nig, W.; Sch\u00fctte, R.; Wendt, O.; Zelewski, S. (eds.): Wirtschaftsinformatik und Wissenschaftstheorie. Gabler, Wiesbaden, pp. 211\u2013241.","DOI":"10.1007\/978-3-322-82411-0_7"},{"key":"28_CR62","doi-asserted-by":"crossref","unstructured":"Schwegmann, Ansgar (1999): Objektorientierte Referenzmodellierung: Theoretische Grundlagen und praktische Anwendung. Deutscher Universit\u00e4ts-Verlag, Wiesbaden.","DOI":"10.1007\/978-3-322-99774-6_4"},{"key":"28_CR63","unstructured":"Schulz, R.; Malzahn, U.; von Schoultz, F. (1996): An Integrated Project Management Information System. University Leipzig."},{"key":"28_CR65","unstructured":"Thomas, Oliver (2005): Understanding the Term Reference Model in Information Systems Research: History, Literature Analysis and Explanation. In: Proceedings of the Workshop on Business Process Reference Models (BPRM 2005), Satellite workshop of the Third International Conference on Business Process Management (BPM). Nancy, France, pp. 16\u201329."},{"key":"28_CR66","unstructured":"Turner, J. R. (1999): The handbook of project-based management. McGraw-Hill, London et al."},{"key":"28_CR67","unstructured":"Waschek, Gernot (2007): Es geht voran mit der DIN-Norm! In: Projektmanagement Aktuell 18 (2), pp. 70\u201371."},{"key":"28_CR68","doi-asserted-by":"crossref","unstructured":"Winter, Robert; Schelp, Joachim (2006): Reference modeling and method construction: a design science perspective. In: Symposium on Applied Computing. Dijon, France, pp. 1561\u20131562.","DOI":"10.1145\/1141277.1141638"},{"key":"28_CR69","unstructured":"Wollmann, P. (2002): Multiprojektmanagement im Kontext der strategischen Planung. In: Hirzel, M.; K\u00fchn, F.; Wollmann, P. (eds.): Multiprojektmanagement. Strategische und operative Steuerung von Projektportfolios. Frankfurter Allgemeine Buch, Frankfurt, pp. 22\u201336."}],"container-title":["WIRTSCHAFTSINFORMATIK"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.springerlink.com\/index\/pdf\/10.1365\/s11576-008-0028-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,11,4]],"date-time":"2019-11-04T13:04:21Z","timestamp":1572872661000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1365\/s11576-008-0028-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,4]]},"references-count":69,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2008,4]]}},"alternative-id":["28"],"URL":"https:\/\/doi.org\/10.1365\/s11576-008-0028-y","relation":{},"ISSN":["0937-6429","1861-8936"],"issn-type":[{"value":"0937-6429","type":"print"},{"value":"1861-8936","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,4]]}}}