{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,22]],"date-time":"2026-01-22T16:29:54Z","timestamp":1769099394163,"version":"3.49.0"},"reference-count":27,"publisher":"Public Library of Science (PLoS)","issue":"6","license":[{"start":{"date-parts":[[2018,6,7]],"date-time":"2018-06-07T00:00:00Z","timestamp":1528329600000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"name":"National Nature Science Funding of China","award":["No.51178157"],"award-info":[{"award-number":["No.51178157"]}]},{"name":"The fundamental research funds for The Central Universities (","award":["No. 30916011338"],"award-info":[{"award-number":["No. 30916011338"]}]}],"content-domain":{"domain":["www.plosone.org"],"crossmark-restriction":false},"short-container-title":["PLoS ONE"],"DOI":"10.1371\/journal.pone.0197918","type":"journal-article","created":{"date-parts":[[2018,6,7]],"date-time":"2018-06-07T17:36:51Z","timestamp":1528393011000},"page":"e0197918","update-policy":"https:\/\/doi.org\/10.1371\/journal.pone.corrections_policy","source":"Crossref","is-referenced-by-count":7,"title":["A rough set-based measurement model study on high-speed railway safety operation"],"prefix":"10.1371","volume":"13","author":[{"given":"Qizhou","family":"Hu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1946-6516","authenticated-orcid":true,"given":"Minjia","family":"Tan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Huapu","family":"Lu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yun","family":"Zhu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"340","published-online":{"date-parts":[[2018,6,7]]},"reference":[{"issue":"43","key":"ref1","first-page":"153","article-title":"Analysis on necessity for operation monitoring of high-speed railway","volume":"35","author":"CT Wang","year":"2017","journal-title":"Shanxi Architecture"},{"issue":"39","key":"ref2","first-page":"1","article-title":"Research and practice of safety guarantee system for China high-speed railway","volume":"11","author":"GL Kang","year":"2017","journal-title":"Journal of the China Railway Society"},{"key":"ref3","doi-asserted-by":"crossref","unstructured":"Fernandez-Rodriguez A, Fernandez-Cardador A, Cucala AP. Energy efficiency in high speed railway traffic operation: a real-time ecodriving algorithm. IEEE International Conference on Environment &amp; Electrical Engineering. 2015: 325\u2013330.","DOI":"10.1109\/EEEIC.2015.7165181"},{"key":"ref4","unstructured":"Ma X. Research on the causation of railway accident based on complex network theory. M.Sc. Thesis, Beijing Jiaotong University. 2015."},{"issue":"2","key":"ref5","first-page":"528","article-title":"An internet of things ontology for earthquake emergency evaluation and response","volume":"10","author":"L Spalazzi","year":"2014","journal-title":"Collaboration Technologies and Systems"},{"key":"ref6","first-page":"1","article-title":"Operation safety detection and monitoring technology of high-speed railway","volume":"3","author":"HW He","year":"2013","journal-title":"Chinese Railways"},{"issue":"2","key":"ref7","first-page":"46","article-title":"Comprehensive evaluation for speed target value of high speed railway","volume":"34","author":"YT Peng","year":"2012","journal-title":"Railway Transport and Economy"},{"issue":"3","key":"ref8","first-page":"17","article-title":"Application of attribute mathematics in railway traffic safety integrated assessment","volume":"168","author":"J Ning","year":"2011","journal-title":"Railway Computer Application"},{"issue":"4","key":"ref9","first-page":"121","article-title":"Railway maintenance system safety risks and comprehensive evaluation","volume":"31","author":"YF Tian","year":"2009","journal-title":"Journal of The China Railway Society"},{"issue":"4","key":"ref10","first-page":"23","article-title":"Fuzzy evaluation method for railway operation based on AHP","volume":"15","author":"LJ LI","year":"2009","journal-title":"Railway Operation Technology"},{"key":"ref11","doi-asserted-by":"crossref","unstructured":"Li M, Wen YH. Applying risk assessment technique to electromagnetic compatibility analysis in Chinese High Speed Railway. IEEE, International Symposium on Microwave, Antenna, Propagation, and Emc Technologies. 2016:441\u2013445.","DOI":"10.1109\/MAPE.2015.7510353"},{"issue":"3","key":"ref12","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1007\/s12544-017-0253-9","article-title":"An evaluation of train control information systems for sustainable railway using the analytic hierarchy process (AHP) model","volume":"9","author":"E Krmac","year":"2017","journal-title":"European Transport Research Review"},{"key":"ref13","doi-asserted-by":"crossref","first-page":"889","DOI":"10.1016\/j.proenv.2013.02.107","article-title":"Examining inter-organizational network during emergency response of west java earthquake 2009, Indonesia","volume":"17","author":"MBF Bisri","year":"2013","journal-title":"Procedia Environmental Sciences"},{"issue":"6","key":"ref14","doi-asserted-by":"crossref","first-page":"625","DOI":"10.1016\/j.trb.2009.01.004","article-title":"Multi-period transportation network design under demand uncertainty","volume":"43","author":"SV Ukkusuri","year":"2009","journal-title":"Transportation Research Part B: Methodological"},{"issue":"3","key":"ref15","first-page":"1","article-title":"Service station evaluation problem in catering service of high-speed railway: a fuzzy QFD approach based on evidence theory","volume":"2015","author":"X Wu","year":"2015","journal-title":"Mathematical Problems in Engineering"},{"key":"ref16","doi-asserted-by":"crossref","unstructured":"Bai Z, Zhou L, Guo B, Wang J and Shao J. Study on the evaluation index system of high-speed railway train Operation Plan. International Conference on Transportation Information &amp; Safety. 2015:1870\u20131876.","DOI":"10.1061\/9780784413036.251"},{"key":"ref17","doi-asserted-by":"crossref","first-page":"997","DOI":"10.4028\/www.scientific.net\/AMM.744-746.997","article-title":"The study on safety management of drilling-blasting metro station construction based on OWA operator and gray theory","volume":"744\u2013746","author":"J X Zhao","year":"2015","journal-title":"Applied Mechanics & Materials"},{"issue":"2","key":"ref18","first-page":"91","article-title":"Safety evaluation of rail transit based on comprehensive fuzzy evaluation model","volume":"27","author":"J Li","year":"2011","journal-title":"Journal of Transport Science and Engineering"},{"issue":"6","key":"ref19","first-page":"45","article-title":"The measuring model of urban road traffic safety based on value function","volume":"20","author":"QZ Hu","year":"2010","journal-title":"China Safety Science Journal"},{"issue":"02","key":"ref20","first-page":"272","article-title":"The comprehensive measure model for urban traffic congestion based on value function","volume":"31","author":"QZ Hu","year":"2015","journal-title":"Journal of Southeast University"},{"issue":"1","key":"ref21","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/j.ins.2006.06.003","article-title":"Rudiments of rough sets","volume":"177","author":"Z Pawlak","year":"2006","journal-title":"Information Sciences"},{"issue":"1","key":"ref22","doi-asserted-by":"crossref","first-page":"e0164803","DOI":"10.1371\/journal.pone.0164803","article-title":"An empirical analysis of rough set categorical clustering techniques","volume":"12","author":"J Uddin","year":"2017","journal-title":"PLOS ONE"},{"key":"ref23","first-page":"3","article-title":"Typical non-smooth elements in vehicle systems, nonsmooth problems in vehicle system dynamics","author":"H True","year":"2009"},{"issue":"4","key":"ref24","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1016\/S0263-7863(00)00055-7","article-title":"Non-structural fuzzy decision support system for evaluation of construction safety management system","volume":"20","author":"CM Tam","year":"2002","journal-title":"International Journal of Project Management"},{"key":"ref25","doi-asserted-by":"crossref","unstructured":"Jiang BL, Zhang YMi, Li Y, Muqile T. Dynamic plotting system of earthquake emergency response in Wisdom city. 2014 Sixth International Conference on Measuring Technology and Mechatronics Automation (ICMTMA). 2014: 271\u2013274.","DOI":"10.1109\/ICMTMA.2014.68"},{"key":"ref26","doi-asserted-by":"crossref","unstructured":"Avvenuti M, Cresci S, Polla MNL, Marchetti A, Tesconi M. Earthquake emergency management by social sensing. IEEE International Conferece on Pervasive Computing and Communications Workshops. 2014; 17(3): 587\u2013592.","DOI":"10.1109\/PerComW.2014.6815272"},{"issue":"2","key":"ref27","doi-asserted-by":"crossref","first-page":"190","DOI":"10.1016\/j.euromechsol.2009.10.001","article-title":"Self-exciting vibrations and Hopf\u2019s bifurcation in non-linear stability analysis of rail vehicles in a curved track","volume":"29","author":"K Zboinski","year":"2010","journal-title":"European Journal of Mechanics\/A-Solid"}],"container-title":["PLOS ONE"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/dx.plos.org\/10.1371\/journal.pone.0197918","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,5]],"date-time":"2025-07-05T01:11:45Z","timestamp":1751677905000},"score":1,"resource":{"primary":{"URL":"https:\/\/dx.plos.org\/10.1371\/journal.pone.0197918"}},"subtitle":[],"editor":[{"given":"Yong","family":"Deng","sequence":"first","affiliation":[],"role":[{"role":"editor","vocabulary":"crossref"}]}],"short-title":[],"issued":{"date-parts":[[2018,6,7]]},"references-count":27,"journal-issue":{"issue":"6","published-online":{"date-parts":[[2018,6,7]]}},"URL":"https:\/\/doi.org\/10.1371\/journal.pone.0197918","relation":{},"ISSN":["1932-6203"],"issn-type":[{"value":"1932-6203","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,6,7]]}}}