{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,9,24]],"date-time":"2026-09-24T02:38:29Z","timestamp":1790217509072,"version":"4.1.0"},"reference-count":43,"publisher":"Public Library of Science (PLoS)","issue":"12","license":[{"start":{"date-parts":[[2022,12,15]],"date-time":"2022-12-15T00:00:00Z","timestamp":1671062400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":["www.plosone.org"],"crossmark-restriction":false},"short-container-title":["PLoS ONE"],"abstract":"<jats:p>Timely completion is a crucial factor for the success of a construction project, especially in the Sri Lankan context. This study aims to identify the most influential factors that affect the timely completion of construction projects in Sri Lanka. Thirty-nine factors were identified through a comprehensive literature review and experts\u2019 opinions. A questionnaire incorporating the 39 project delay factors was distributed among 163 Civil Engineers, and responses were obtained. Random sampling method was adopted to select the sample. The Relative Importance Index (RII) analysed and ranked the project delay factors. The top ranked significant project delay factors were identified as shortage of skilled subcontractors\/suppliers, shortage of labourers (Skilled, semi-skilled, unskilled), financial difficulties of contractors, delay in delivering materials to the site, and Covid-19 pandemic situation. According to the main three respondent types, i.e., clients\/owners, contractors and consultants, the contractor related factors was the key group among others that delay a construction project. The scientific value of the study includes assisting the Sri Lankan construction industry to identify the factors affecting the timely completion of construction projects, and developing mitigation methods and strategies. Also, the stakeholders could duly schedule the construction work by identifying areas that need more attention. The contribution of this study would assist stakeholders to adopt a proactive approach by identifying mistakes on their part and minimising potential issues that lead to construction project delays in Sri Lanka.<\/jats:p>","DOI":"10.1371\/journal.pone.0278318","type":"journal-article","created":{"date-parts":[[2022,12,15]],"date-time":"2022-12-15T18:44:55Z","timestamp":1671129895000},"page":"e0278318","update-policy":"https:\/\/doi.org\/10.1371\/journal.pone.corrections_policy","source":"Crossref","is-referenced-by-count":18,"title":["Factors influencing the timely completion of construction projects in Sri Lanka"],"prefix":"10.1371","volume":"17","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-2977-4101","authenticated-orcid":true,"given":"Nadeesha","family":"Abeysinghe","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7679-4164","authenticated-orcid":true,"given":"Ruwan","family":"Jayathilaka","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"340","published-online":{"date-parts":[[2022,12,15]]},"reference":[{"key":"pone.0278318.ref001","author":"Central Bank of Sri Lanka","year":"2022"},{"key":"pone.0278318.ref002","first-page":"2020","article-title":"Development of Sri Lanka\u2019s Construction Industry: The Way Forward After COVID 19","volume":"7","author":"Construction Industry Development Authority","journal-title":"Colombo"},{"key":"pone.0278318.ref003","first-page":"43","article-title":"Delays and cost overruns in infrastructure projects: extent, causes and remedies","author":"R Singh","year":"2010","journal-title":"Economic and Political Weekly"},{"issue":"2","key":"pone.0278318.ref004","doi-asserted-by":"crossref","first-page":"05021002","DOI":"10.1061\/(ASCE)IS.1943-555X.0000597","article-title":"The determinants of time overruns in Portuguese public projects","volume":"27","author":"FP Catal\u00e3o","year":"2021","journal-title":"Journal of Infrastructure Systems"},{"issue":"3","key":"pone.0278318.ref005","doi-asserted-by":"crossref","first-page":"531","DOI":"10.1108\/JEDT-05-2019-0130","article-title":"Gallage PGMP. Critical factors affecting the performance of large construction projects in developing countries","volume":"18","author":"DS Santoso","year":"2019","journal-title":"Journal of Engineering, Design and Technology."},{"key":"pone.0278318.ref006","doi-asserted-by":"crossref","first-page":"196","DOI":"10.1016\/j.proeng.2014.07.022","article-title":"Time Extension Factors in Construction Industry of Pakistan","volume":"77","author":"SSS Gardezi","year":"2014","journal-title":"Procedia Engineering"},{"issue":"2","key":"pone.0278318.ref007","doi-asserted-by":"crossref","first-page":"346","DOI":"10.1108\/ECAM-05-2015-0072","article-title":"Profiling causative factors leading to construction project delays in the United Arab Emirates","volume":"24","author":"B Mpofu","year":"2017","journal-title":"Engineering, Construction and Architectural Management"},{"issue":"1","key":"pone.0278318.ref008","doi-asserted-by":"crossref","DOI":"10.1080\/23311916.2017.1291117","article-title":"Causes of delay in residential construction projects in Cambodia","volume":"4","author":"S Durdyev","year":"2017","journal-title":"Cogent Engineering"},{"issue":"2","key":"pone.0278318.ref009","doi-asserted-by":"crossref","first-page":"1515","DOI":"10.1016\/j.aej.2016.03.006","article-title":"Exploring delay causes of road construction projects in Egypt.","volume":"55","author":"RF Aziz","year":"2016","journal-title":"Alexandria Engineering Journal"},{"key":"pone.0278318.ref010","article-title":"Analysis of construction delay for delivering quality project in Bangladesh","author":"MI Hoque","year":"2021","journal-title":"International Journal of Building Pathology and Adaptation"},{"issue":"2","key":"pone.0278318.ref011","doi-asserted-by":"crossref","first-page":"192","DOI":"10.1108\/09699980710731308","article-title":"The significant factors causing delay of building construction projects in Malaysia","volume":"14","author":"Alaghbari We","year":"2007","journal-title":"Engineering, Construction and Architectural Management"},{"issue":"3","key":"pone.0278318.ref012","doi-asserted-by":"crossref","first-page":"346","DOI":"10.1108\/JSTPM-12-2015-0041","article-title":"The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance","volume":"7","author":"S Zailani","year":"2016","journal-title":"Journal of Science and Technology Policy Management"},{"issue":"1","key":"pone.0278318.ref013","doi-asserted-by":"crossref","first-page":"1717","DOI":"10.1016\/j.aej.2020.11.021","article-title":"Revisiting critical delay factors for construction: Analysing projects in Malaysia.","volume":"60","author":"JBH Yap","year":"2021","journal-title":"Alexandria Engineering Journal"},{"issue":"2","key":"pone.0278318.ref014","doi-asserted-by":"crossref","first-page":"126","DOI":"10.1108\/13664380910977592","article-title":"Delays and cost overruns in the construction projects in the Gaza Strip","volume":"14","author":"A Enshassi","year":"2009","journal-title":"Journal of Financial Management of Property and Construction"},{"issue":"6","key":"pone.0278318.ref015","doi-asserted-by":"crossref","first-page":"609","DOI":"10.1108\/09699981111180917","article-title":"Risk matrix for factors affecting time delay in road construction projects: owners\u2019 perspective.","volume":"18","author":"I. Mahamid","year":"2011","journal-title":"Engineering, Construction and Architectural Management"},{"key":"pone.0278318.ref016","doi-asserted-by":"crossref","first-page":"1402","DOI":"10.1016\/j.proeng.2016.04.176","article-title":"Perspective of Factors Contributing to Project Delay: Case Studies of Road and Bridge Projects in Saudi Arabia","volume":"145","author":"GSA Elawi","year":"2016","journal-title":"Procedia Engineering"},{"issue":"2","key":"pone.0278318.ref017","doi-asserted-by":"crossref","first-page":"801","DOI":"10.1016\/j.aej.2019.07.002","article-title":"Causes of delay in Saudi public construction projects","volume":"58","author":"JA Alsuliman","year":"2019","journal-title":"Alexandria Engineering Journal"},{"issue":"5","key":"pone.0278318.ref018","doi-asserted-by":"crossref","first-page":"597","DOI":"10.1108\/BEPAM-09-2018-0113","article-title":"Significant causes of claims and disputes in construction projects in Saudi Arabia.","volume":"9","author":"S Assaf","year":"2019","journal-title":"Built Environment Project and Asset Management"},{"key":"pone.0278318.ref019","doi-asserted-by":"crossref","first-page":"18","DOI":"10.1016\/j.proeng.2017.03.105","article-title":"Delay and Cost Overrun in Infrastructure Projects in Jordan","volume":"182","author":"N Al-Hazim","year":"2017","journal-title":"Procedia Engineering"},{"issue":"1","key":"pone.0278318.ref020","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1108\/BEPAM-03-2019-0026","article-title":"Causes of delay to public infrastructure projects according to engineers representing different contract parties","volume":"10","author":"HS Ahmad","year":"2019","journal-title":"Built Environment Project and Asset Management"},{"issue":"4","key":"pone.0278318.ref021","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1108\/ECAM-02-2016-0056","article-title":"A hybrid SD-DEMATEL approach to develop a delay model for construction projects.","volume":"24","author":"M Parchami Jalal","year":"2017","journal-title":"Engineering, Construction and Architectural Management"},{"issue":"4","key":"pone.0278318.ref022","doi-asserted-by":"crossref","first-page":"497","DOI":"10.1108\/ECAM-10-2016-0220","article-title":"Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol","volume":"25","author":"P Shahsavand","year":"2018","journal-title":"Engineering, Construction and Architectural Management"},{"issue":"2","key":"pone.0278318.ref023","doi-asserted-by":"crossref","first-page":"412","DOI":"10.1108\/IJMPB-01-2019-0020","article-title":"Analysing causal relationships between delay factors in construction projects","volume":"14","author":"M Jahangoshai Rezaee","year":"2019","journal-title":"International Journal of Managing Projects in Business"},{"issue":"11","key":"pone.0278318.ref024","doi-asserted-by":"crossref","first-page":"1534","DOI":"10.1108\/ECAM-10-2016-0227","article-title":"Causes of delays in the construction phase of Chinese building projects","volume":"25","author":"T-K Wang","year":"2018","journal-title":"Engineering, Construction and Architectural Management."},{"issue":"1","key":"pone.0278318.ref025","doi-asserted-by":"crossref","first-page":"58","DOI":"10.1108\/JFMPC-04-2018-0020","article-title":"Analysis of causes of delay in Indian construction projects and mitigation measures","volume":"24","author":"KV Prasad","year":"2019","journal-title":"Journal of Financial Management of Property and Construction"},{"issue":"1","key":"pone.0278318.ref026","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1016\/j.jare.2012.11.005","article-title":"Analyzing delay causes in Egyptian construction projects","volume":"5","author":"MM Marzouk","year":"2014","journal-title":"Journal of Advanced Research"},{"issue":"2","key":"pone.0278318.ref027","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1108\/JFMPC-04-2019-0031","article-title":"Fuzzy model for assessing delays in Egyptian residential projects","volume":"25","author":"T El-Rasas","year":"2020","journal-title":"Journal of Financial Management of Property and Construction"},{"issue":"2","key":"pone.0278318.ref028","doi-asserted-by":"crossref","first-page":"1501","DOI":"10.1016\/j.asej.2020.10.016","article-title":"Systematic processing framework for analyzing the factors of construction projects\u2019 delays","volume":"12","author":"HO Elhusseiny","year":"2021","journal-title":"Egypt. Ain Shams Engineering Journal"},{"issue":"1","key":"pone.0278318.ref029","doi-asserted-by":"crossref","first-page":"198","DOI":"10.1108\/IJMPB-04-2014-0035","article-title":"Analysing delay causes and effects in Ghanaian state housing construction projects","volume":"8","author":"CT Amoatey","year":"2015","journal-title":"International Journal of Managing Projects in Business"},{"issue":"2","key":"pone.0278318.ref030","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1108\/JEDT-11-2015-0075","article-title":"Major causes of construction time and cost overruns","volume":"15","author":"S Famiyeh","year":"2017","journal-title":"Journal of Engineering, Design and Technology"},{"key":"pone.0278318.ref031","doi-asserted-by":"crossref","first-page":"1690","DOI":"10.1016\/j.promfg.2015.07.989","article-title":"Effects of Construction Projects Schedule Overruns: A Case of the Gauteng Province, South Africa","volume":"3","author":"M Mukuka","year":"2015","journal-title":"Procedia Manufacturing"},{"key":"pone.0278318.ref032","doi-asserted-by":"crossref","first-page":"366","DOI":"10.1016\/j.proeng.2017.07.212","article-title":"Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study","volume":"196","author":"T Gebrehiwet","year":"2017","journal-title":"Procedia Engineering"},{"key":"pone.0278318.ref033","first-page":"8","article-title":"Investigation of significant industrial project delay factors and development of conceptual framework","author":"M Abebe","year":"2021","journal-title":"Cogent Engineering"},{"key":"pone.0278318.ref034","article-title":"Extraction of underlying factors causing construction projects delay in Nigeria","author":"CN Egwim","year":"2021","journal-title":"Journal of Engineering, Design and Technology"},{"issue":"4","key":"pone.0278318.ref035","doi-asserted-by":"crossref","first-page":"e06826","DOI":"10.1016\/j.heliyon.2021.e06826","article-title":"Exploring the significant factors that influence delays in construction projects in Hargeisa","volume":"7","author":"AA Fashina","year":"2021","journal-title":"Heliyon"},{"key":"pone.0278318.ref036","article-title":"Causes of road projects\u2019 delays: a case of Blantyre, Malawi","author":"HDJ Mwamvani","year":"2021","journal-title":"Built Environment Project and Asset Management."},{"issue":"5","key":"pone.0278318.ref037","doi-asserted-by":"crossref","first-page":"828","DOI":"10.1108\/ECAM-03-2016-0085","article-title":"The professionals\u2019 perspective on the causes of project delay in the construction industr","volume":"24","author":"G Agyekum-Mensah","year":"2017","journal-title":"Engineering, Construction and Architectural Management"},{"issue":"3","key":"pone.0278318.ref038","doi-asserted-by":"crossref","first-page":"650","DOI":"10.1108\/IJMPB-05-2017-0052","article-title":"The top 10 universal delay factors in construction projects","volume":"11","author":"YJT Zidane","year":"2018","journal-title":"International Journal of Managing Projects in Business"},{"issue":"2","key":"pone.0278318.ref039","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1108\/JFMPC-03-2019-0029","article-title":"Ferreira LMDF. Underlying causes and mitigation measures of delays in construction projects","volume":"25","author":"A Arantes","year":"2020","journal-title":"Journal of Financial Management of Property and Construction"},{"key":"pone.0278318.ref040","first-page":"1","article-title":"Ranking and comparing key factors causing time-overruns in on-site construction","author":"SM Lindhard","year":"2020","journal-title":"International Journal of Construction Management"},{"issue":"5","key":"pone.0278318.ref041","doi-asserted-by":"crossref","first-page":"433","DOI":"10.1080\/01446199400000053","article-title":"Attributes of UK construction clients influencing project consultants\u2019 performance","volume":"12","author":"ST Kometa","year":"1994","journal-title":"Journal of Construction Management and Economics"},{"key":"pone.0278318.ref042","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1007\/BF02310555","article-title":"Coefficient alpha and the internal structure of tests","volume":"16","author":"LJ Cronbach","year":"1951","journal-title":"Psychometrika"},{"key":"pone.0278318.ref043","article-title":"Calculating, interpreting, and reporting Cronbach\u2019s alpha reliability coefficient for likert type scales","author":"JA Gliem","year":"2003","journal-title":"Proceedings for MMidwest Research to Practice Conference in Adult, Continuing, and Community Education"}],"container-title":["PLOS ONE"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/dx.plos.org\/10.1371\/journal.pone.0278318","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,12,15]],"date-time":"2022-12-15T18:45:32Z","timestamp":1671129932000},"score":1,"resource":{"primary":{"URL":"https:\/\/dx.plos.org\/10.1371\/journal.pone.0278318"}},"subtitle":[],"editor":[{"given":"Anu","family":"Sayal","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"editor"}]}],"short-title":[],"issued":{"date-parts":[[2022,12,15]]},"references-count":43,"journal-issue":{"issue":"12","published-online":{"date-parts":[[2022,12,15]]}},"URL":"https:\/\/doi.org\/10.1371\/journal.pone.0278318","relation":{},"ISSN":["1932-6203"],"issn-type":[{"value":"1932-6203","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,12,15]]}}}