{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,24]],"date-time":"2026-10-24T00:29:18Z","timestamp":1792801758636,"version":"4.5.0"},"reference-count":51,"publisher":"Public Library of Science (PLoS)","issue":"3","license":[{"start":{"date-parts":[[2023,3,29]],"date-time":"2023-03-29T00:00:00Z","timestamp":1680048000000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/100000140","name":"USDOT","doi-asserted-by":"crossref","id":[{"id":"10.13039\/100000140","id-type":"DOI","asserted-by":"crossref"}]},{"name":"Center for Transportation Equity, Decisions, and Dollars"}],"content-domain":{"domain":["www.plosone.org"],"crossmark-restriction":false},"short-container-title":["PLoS ONE"],"abstract":"<jats:p>This study aimed to develop predictive models that could be used to estimate the cost and schedule performance of reconstruction of transportation infrastructure damaged by hurricanes and to determine the predictors that are robustly connected to the developed models. Stepwise multiple linear regression and extreme bound analysis (EBA) were used to develop the models and determine the robust and fragile predictors, respectively. The results demonstrated that seven cost performance predictors and nine schedule performance predictors accounted for Adjusted<jats:italic>R<\/jats:italic>-Squared of 92.4% and 99.2%, respectively. The results of the EBA revealed that four cost and seven performance predictors were robustly connected to the developed cost and schedule performance predictive models. It was concluded that increases in laborers\u2019 wages, the number of inspections, information and data management, and addressing safety and environmental issues prior to a project\u2019s execution were predictors of both the cost and schedule performance of reconstruction projects. The outcomes of this study provide knowledge and information that will be helpful to decision-makers who are responsible for mitigating delays and cost overruns, and effectively allocating their limited resources available following a disaster.<\/jats:p>","DOI":"10.1371\/journal.pone.0282231","type":"journal-article","created":{"date-parts":[[2023,3,29]],"date-time":"2023-03-29T17:45:21Z","timestamp":1680111921000},"page":"e0282231","update-policy":"https:\/\/doi.org\/10.1371\/journal.pone.corrections_policy","source":"Crossref","is-referenced-by-count":8,"title":["Prediction of cost and schedule performance in post-hurricane reconstruction of transportation infrastructure"],"prefix":"10.1371","volume":"18","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-3577-2719","authenticated-orcid":true,"given":"Elnaz","family":"Safapour","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Sharareh","family":"Kermanshachi","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Behzad","family":"Rouhanizadeh","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"340","published-online":{"date-parts":[[2023,3,29]]},"reference":[{"key":"pone.0282231.ref001","unstructured":"Mallela, J., & Sadasivam, S. (2011). Work zone road user costs\u2014Concepts and applications. Federal Highway Administration, U.S. Dept. of Transportation, Washington, DC, 2011."},{"key":"pone.0282231.ref002","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1007\/s11067-013-9219-1","article-title":"A stochastic optimization model to reduce expected post-disaster response time through pre-disaster investment decisions","volume":"14","author":"L. Du","year":"2014","journal-title":"Networks and spatial economics"},{"key":"pone.0282231.ref003","unstructured":"Hayat, E., & Amaratunga, R. D. G., 2011. Road reconstruction in post-disaster recovery; the challenges and obstacles."},{"key":"pone.0282231.ref004","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1108\/IJDRBE-03-2017-0018","article-title":"A framework for reconstruction of road infrastructure after a disaster","volume":"10","author":"E. Hayat","year":"2019","journal-title":"International Journal of Disaster Resilience in the Built Environment"},{"key":"pone.0282231.ref005","unstructured":"Baek, M. (2018). Quantitative analysis for modeling uncertainty in construction costs of transportation projects with external factors (Doctoral dissertation, Georgia Institute of Technology)."},{"key":"pone.0282231.ref006","doi-asserted-by":"crossref","first-page":"349","DOI":"10.1193\/1.2191017","article-title":"Estimating downtime in loss modeling","volume":"22","author":"M. C. Comerio","year":"2006","journal-title":"Earthquake Spectra"},{"key":"pone.0282231.ref007","unstructured":"Hidayat, B., & Egbu, C. (2010). A literature review of the role of project management in post-disaster reconstruction. Paper Presented at 26th Annual ARCOM Conference, Association of Researchers in Construction Management, Leeds."},{"key":"pone.0282231.ref008","doi-asserted-by":"crossref","first-page":"739","DOI":"10.1111\/j.1467-7717.2011.01240.x","article-title":"An integrated approach: managing resources for post-disaster reconstruction","volume":"35","author":"Y. Chang","year":"2011","journal-title":"Disasters"},{"key":"pone.0282231.ref009","doi-asserted-by":"crossref","first-page":"1","DOI":"10.18757\/ejtir.2020.20.1.3919","article-title":"Post-disaster reconstruction of road infrastructure","volume":"20","author":"A. Gajanayake","year":"2020","journal-title":"European Journal of Transport and Infrastructure Research"},{"key":"pone.0282231.ref010","doi-asserted-by":"crossref","first-page":"6","DOI":"10.1061\/(ASCE)1084-0702(2008)13:1(6)","article-title":"Bridge damage and repair costs from Hurricane Katrina","volume":"13","author":"J. Padgett","year":"2008","journal-title":"Journal of Bridge Engineering"},{"key":"pone.0282231.ref011","doi-asserted-by":"crossref","first-page":"821","DOI":"10.1111\/j.1467-7717.2010.01171.x","article-title":"Optimizing hurricane disaster relief goods distribution: model development and application with respect to planning strategies","volume":"34","author":"M.W. Horner","year":"2010","journal-title":"Disasters"},{"key":"pone.0282231.ref012","unstructured":"Safapour, E., Kermanshachi, S., & Jahan Nipa, T. (2020). A Damage-based Analysis of Rework in Reconstruction of Infrastructure Projects Due to Natural Disasters. In Creative Construction e-Conference 2020 (pp. 55\u201362). Budapest University of Technology and Economics."},{"key":"pone.0282231.ref013","doi-asserted-by":"crossref","unstructured":"Charv\u00e9riat, C. (2000). Natural Disasters in Latin America and the Caribbean: An Overview of Risk. Working paper #434. Washington, DC: Inter-American Development Bank.","DOI":"10.2139\/ssrn.1817233"},{"key":"pone.0282231.ref014","unstructured":"Knabb, R. D., Rhome, J. R., & Brown, D. P. (2006a). Tropical cyclone report, Hurricane Katrina, 23\u201330 August 2005. National Hurricane Center, Miami."},{"key":"pone.0282231.ref015","unstructured":"Knabb, R. D., Rhome, J. R., & Brown, D. P. (2006b). Tropical cyclone report, Hurricane Rita, 18\u201326 September 2005. National Hurricane Center, Miami."},{"key":"pone.0282231.ref016","unstructured":"TCLEEF. (2006). Hurricane Katrina: Performance of transportation systems. R. Des Roches, ed., ASCE Technical Council on Lifeline Earthquake Engineering Monograph No. 29, American Society of Civil Engineers, June."},{"key":"pone.0282231.ref017","doi-asserted-by":"crossref","unstructured":"Jha, A. K., & Duyne, J. E. (2010). Safer homes, stronger communities: A handbook for reconstructing after natural disasters. World Bank Publications.","DOI":"10.1596\/978-0-8213-8045-1"},{"key":"pone.0282231.ref018","doi-asserted-by":"crossref","first-page":"171","DOI":"10.3846\/1648-715X.2009.13.171-190","article-title":"Post disaster waste management strategies in developing countries: case of Sri Lanka","volume":"13","author":"G. Karunasena","year":"2009","journal-title":"International Journal of Strategic Property Management"},{"key":"pone.0282231.ref019","first-page":"321","article-title":"Risk Factors in IT Public\u2013Private Partnership Projects. Public Works Management &","volume":"24","author":"S. Ghribi","year":"2019","journal-title":"Policy"},{"key":"pone.0282231.ref020","doi-asserted-by":"crossref","first-page":"527","DOI":"10.1016\/j.ijproman.2006.11.009","article-title":"Commitment, coordination, competence and the iron triangle","volume":"25","author":"k. Jha","year":"2007","journal-title":"International Journal of Project Management"},{"key":"pone.0282231.ref021","unstructured":"Ahmed, S., Azher, Castillo, M., & Kappagantula, P. (2002). Construction delays in Florida; an empirical study, Florida; 2002."},{"key":"pone.0282231.ref022","doi-asserted-by":"crossref","first-page":"100194","DOI":"10.1016\/j.pdisas.2021.100194","article-title":"Uncertainty analysis of rework predictors in post-hurricane reconstruction of critical transportation infrastructure","volume":"11","author":"E. Safapour","year":"2021","journal-title":"Progress in Disaster Science"},{"key":"pone.0282231.ref023","unstructured":"Thomsen, C., Darrington, J., Dunne, D. and Lichtig, W., 2010. Managing integrated project delivery, Construction Management Association of America, Mclean, VA, 2010."},{"key":"pone.0282231.ref024","unstructured":"Aggor, K. (2017). Relationship between budget and project success factors in the Ghanaian building construction sector, Walden University, 2017."},{"key":"pone.0282231.ref025","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1080\/01944360208976273","article-title":"Underestimating costs in public works projects, error or lie","volume":"68","author":"B. Flyvbjerg","year":"2009","journal-title":"Journal of the American Planning Association"},{"key":"pone.0282231.ref026","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1061\/(ASCE)0742-597X(2009)25:4(221)","article-title":"Construction project cost escalation factors","volume":"25","author":"J. Shane","year":"2009","journal-title":"Journal of Management in Engineering"},{"key":"pone.0282231.ref027","doi-asserted-by":"crossref","first-page":"1290","DOI":"10.1061\/9780784482865.136","volume-title":"Construction Research Congress 2020: Computer Applications","author":"E. Safapour","year":"2020"},{"key":"pone.0282231.ref028","unstructured":"Brunsdon, D., Hare, J., & Stannard, M. (2012). The impact of the Canterbury earthquake sequence on the engineering profession in New Zealand. Paper presented at the Australian Earthquake Engineering Society 2012 Conference, December 7\u20139, Gold Coast."},{"key":"pone.0282231.ref029","unstructured":"Iwai, T., & Tabuchi, S. (2013). Survey: Housing projects delayed for more than 10,000 evacuees. The Asahi Shimbun."},{"issue":"1","key":"pone.0282231.ref030","doi-asserted-by":"crossref","first-page":"24","DOI":"10.1111\/j.1468-5973.2008.00529.x","article-title":"The Meaning of \u201cBuild Back Better: Evidence from Post-Tsunami Aceh and Sri Lanka","volume":"16","author":"J. Kennedy","year":"2008","journal-title":"Journal of Contingencies and Crisis Management"},{"key":"pone.0282231.ref031","doi-asserted-by":"crossref","first-page":"102666","DOI":"10.1016\/j.ijdrr.2021.102666","article-title":"An investigation of causal relationships among barriers that delay post-hurricane recovery of human communities","volume":"67","author":"B. Rouhanizadeh","year":"2022","journal-title":"International Journal of Disaster Risk Reduction"},{"issue":"1","key":"pone.0282231.ref032","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/j.iatssr.2012.07.001","article-title":"Reconstruction of the Aceh Region following the 2004 Indian Ocean tsunami disaster: A transportation perspective","volume":"36","author":"R. Matsumaru","year":"2012","journal-title":"IATSS Research"},{"issue":"1","key":"pone.0282231.ref033","article-title":"Causes of Success and Failure of Post Disaster Reconstruction Projects\u2013A Case Study of Post 2005 Earthquake in Northern Pakistan","volume":"1","author":"M. A. Choudhary","year":"2013","journal-title":"Planet@Risk"},{"issue":"1","key":"pone.0282231.ref034","doi-asserted-by":"crossref","first-page":"475","DOI":"10.1193\/022813EQS058M","article-title":"Insurance: Its role in recovery from the 2010\u20132011 Canterbury Earthquake Sequence","volume":"30","author":"A. King","year":"2014","journal-title":"Earthquake Spectra"},{"key":"pone.0282231.ref035","author":"A. Chang-Richards","year":"2017","journal-title":"A system dynamics model of post earthquake reconstruction pathways"},{"key":"pone.0282231.ref036","author":"J. E. Taylor","year":"2012","journal-title":"Learning from Christchurch: Technical Decisions and Societal Consequences in Post-Earthquake Recovery"},{"key":"pone.0282231.ref037","doi-asserted-by":"crossref","unstructured":"Marquis, F., Kim, J. J., Elwood, K. J., and Chang, S. E., 2015. Understanding post-earthquake decisions on multi-story concrete buildings in Christchurch, New Zealand. Bulletin of Earthquake Engineering.","DOI":"10.1007\/s10518-015-9772-8"},{"key":"pone.0282231.ref038","unstructured":"Almufti, I., and Willford, M., 2013. REDi\u2122 rating system: Resilience-based earthquake design initiative for the next generation of buildings."},{"issue":"3","key":"pone.0282231.ref039","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1061\/(ASCE)CO.1943-7862.0000277","article-title":"Estimation of time for Wenchuan Earthquake reconstruction in China","volume":"137","author":"C. Sun","year":"2011","journal-title":"Journal of Construction Engineering and Management"},{"issue":"7080","key":"pone.0282231.ref040","doi-asserted-by":"crossref","first-page":"572","DOI":"10.1136\/bmj.314.7080.572","article-title":"Statistics notes: Cronbach\u2019s alpha","volume":"314","author":"J. M. Bland","year":"1997","journal-title":"BMJ"},{"key":"pone.0282231.ref041","volume-title":"A Procedure for Stepwise Regression Analysis","author":"Hannu V\u00e4liaho","year":"2022"},{"key":"pone.0282231.ref042","volume-title":"Applied Regression Analysis","author":"N. Draper","year":"1981","edition":"2"},{"key":"pone.0282231.ref043","doi-asserted-by":"crossref","unstructured":"Armstrong, J.S., 2011. Illusions in regression analysis. Available at SSRN 1969740.","DOI":"10.2139\/ssrn.1969740"},{"key":"pone.0282231.ref044","volume-title":"Mathematical Methods for Digital Computers","author":"M. A. Efroymson","year":"1960"},{"issue":"1","key":"pone.0282231.ref045","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1186\/s40537-018-0143-6","article-title":"Step away from stepwise","volume":"5","author":"G. Smith","year":"2018","journal-title":"Journal of Big Data"},{"key":"pone.0282231.ref046","first-page":"308","article-title":"Sensitivity analysis would help","volume":"57","author":"E. E. Leamer","year":"1985","journal-title":"American Economic Review"},{"key":"pone.0282231.ref047","doi-asserted-by":"crossref","first-page":"306","DOI":"10.2307\/1924497","article-title":"Reporting the fragility of regression estimates","volume":"65","author":"E. E. Leamer","year":"1983","journal-title":"Review of Economics and Statistics"},{"issue":"4","key":"pone.0282231.ref048","first-page":"942","article-title":"A sensitivity analysis of cross-country growth regressions","volume":"82","author":"R. Levine","year":"1992","journal-title":"American Economic Review"},{"key":"pone.0282231.ref049","first-page":"178","article-title":"I just ran two million regressions","volume":"87","author":"X. Sala-i-Martin","year":"1997","journal-title":"American Economic Review"},{"key":"pone.0282231.ref050","author":"M. Chanegriha","year":"2014","journal-title":"Identifying the robust economic, geographical and political determinants of FDI: an extreme bounds analysis"},{"issue":"2","key":"pone.0282231.ref051","doi-asserted-by":"crossref","first-page":"759","DOI":"10.1007\/s00181-016-1097-1","article-title":"Identifying the robust economic, geographical and political determinants of FDI: an Extreme Bounds Analysis","volume":"52","author":"M. Chanegriha","year":"2017","journal-title":"Empirical Economics"}],"container-title":["PLOS ONE"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/dx.plos.org\/10.1371\/journal.pone.0282231","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,12,9]],"date-time":"2023-12-09T21:57:17Z","timestamp":1702159037000},"score":1,"resource":{"primary":{"URL":"https:\/\/dx.plos.org\/10.1371\/journal.pone.0282231"}},"subtitle":[],"editor":[{"given":"Iman","family":"Aghayan","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"editor"}]}],"short-title":[],"issued":{"date-parts":[[2023,3,29]]},"references-count":51,"journal-issue":{"issue":"3","published-online":{"date-parts":[[2023,3,29]]}},"URL":"https:\/\/doi.org\/10.1371\/journal.pone.0282231","relation":{},"ISSN":["1932-6203"],"issn-type":[{"value":"1932-6203","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,3,29]]}}}