{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,9,24]],"date-time":"2026-09-24T18:11:07Z","timestamp":1790273467859,"version":"4.1.0"},"reference-count":82,"publisher":"Public Library of Science (PLoS)","issue":"9","license":[{"start":{"date-parts":[[2026,9,24]],"date-time":"2026-09-24T00:00:00Z","timestamp":1790208000000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":["www.plosone.org"],"crossmark-restriction":false},"short-container-title":["PLoS One"],"abstract":"<jats:p>Effective project risk management helps to reduce negative outcomes, especially in construction projects. Because project risk management involves many different parts, an integrated approach is needed to cover all phases. This study proposes an integrated framework for risk planning, identification, assessment, and response strategy selection, addressing major weaknesses in traditional risk management methods. The framework systematically identifies risks, their characteristics, and their impact zones. These elements help to evaluate each risk thoroughly. Risk assessment is performed using fuzzy multi-criteria decision-making, fuzzy SWARA (Step-wise Weight Assessment Ratio Analysis) and fuzzy WSM (Weighted Sum Model). The selection of risk response strategies is then formulated as a mixed integer linear programming (MILP) optimization model. This produces an optimal risk response strategy that reduces threats and takes advantage of opportunities. To provide a proof-of-concept illustration of the proposed integrated framework, we present a case study utilizing empirical data from a real\u2011world liquefied petroleum gas (LPG) pipeline construction project. The findings identify 20 distinct risks and 12 viable risk response strategies. The optimization component successfully selects six out of twelve response strategies. This achieves a 38.9% reduction in total risk value while meeting the project\u2019s constraints.<\/jats:p>","DOI":"10.1371\/journal.pone.0357560","type":"journal-article","created":{"date-parts":[[2026,9,24]],"date-time":"2026-09-24T17:39:26Z","timestamp":1790271566000},"page":"e0357560","update-policy":"https:\/\/doi.org\/10.1371\/journal.pone.corrections_policy","source":"Crossref","is-referenced-by-count":0,"title":["An integrated fuzzy multi-criteria decision making and mixed-integer linear programming optimization framework for project risk assessment and response strategy selection: A case study of a liquefied petroleum gas pipeline construction project"],"prefix":"10.1371","volume":"21","author":[{"ORCID":"https:\/\/orcid.org\/0009-0004-1045-1777","authenticated-orcid":true,"given":"Mohammad","family":"Senisel Bachari","sequence":"first","affiliation":[{"name":"Petroleum University of Technology","place":["Tehran, Iran"],"department":["Department of Energy Economics and Management, Tehran Faculty of Petroleum"]}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5846-7250","authenticated-orcid":true,"given":"Asgar","family":"Khademvatani","sequence":"additional","affiliation":[{"name":"Petroleum University of Technology","place":["Tehran, Iran"],"department":["Department of Energy Economics and Management, Tehran Faculty of Petroleum"]}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Mahdi","family":"Iranfar","sequence":"additional","affiliation":[{"name":"Petroleum University of Technology","place":["Tehran, Iran"],"department":["Department of Energy Economics and Management, Tehran Faculty of Petroleum"]}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"340","published-online":{"date-parts":[[2026,9,24]]},"reference":[{"issue":"8","key":"pone.0357560.ref001","doi-asserted-by":"crossref","first-page":"1382","DOI":"10.1016\/j.ijproman.2013.07.006","article-title":"The management of project management: a conceptual framework for project governance","volume":"32","author":"EG Too","year":"2014","journal-title":"International Journal of Project Management"},{"issue":"3","key":"pone.0357560.ref002","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1177\/87569728211001663","article-title":"Why do business organizations participate in projects? toward a typology of project value domains","volume":"52","author":"V Zerjav","year":"2021","journal-title":"Project Management Journal"},{"key":"pone.0357560.ref003","volume-title":"PMI (Project Management Institute). Guide to the Project Management Body of Knowledge (PMBOK\u00ae Guide)","year":"2017","edition":"6"},{"issue":"1","key":"pone.0357560.ref004","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1002\/pmj.20213","article-title":"A fresh look at the contribution of project management to organizational performance","volume":"42","author":"M Aubry","year":"2011","journal-title":"Project Management Journal"},{"issue":"1","key":"pone.0357560.ref005","doi-asserted-by":"crossref","first-page":"30","DOI":"10.1002\/pmj.21468","article-title":"The relationship between project success and project efficiency","volume":"46","author":"P Serrador","year":"2015","journal-title":"Project Management Journal"},{"issue":"6","key":"pone.0357560.ref006","first-page":"601","article-title":"Understanding the key risks in construction projects in China","volume":"25","author":"PXW Zou","year":"2007","journal-title":"International Journal of Project Management"},{"issue":"1","key":"pone.0357560.ref007","doi-asserted-by":"crossref","first-page":"65","DOI":"10.3846\/20294913.2014.994582","article-title":"Risk management in construction projects","volume":"21","author":"S Iqbal","year":"2015","journal-title":"Technological and Economic Development of Economy"},{"key":"pone.0357560.ref008","doi-asserted-by":"crossref","first-page":"72936","DOI":"10.1109\/ACCESS.2022.3189157","article-title":"Intelligent risk management in construction projects: systematic literature review","volume":"10","author":"C Liao","year":"2022","journal-title":"IEEE Access"},{"key":"pone.0357560.ref009","volume-title":"An anatomy of risk","author":"DW Rowe","year":"1977"},{"key":"pone.0357560.ref010","doi-asserted-by":"crossref","DOI":"10.1680\/tpor.26667","volume-title":"The Philosophy of Risk","author":"J Chicken","year":"1998"},{"key":"pone.0357560.ref011","volume-title":"Project risk management guidelines: managing risk in large projects and complex procurements","author":"DF Cooper","year":"2005"},{"key":"pone.0357560.ref012","volume-title":"PMI (Project Management Institute). A Guide to the Project Management Body of Knowledge (PMBOK\u00ae Guide)","year":"2000"},{"issue":"4","key":"pone.0357560.ref013","doi-asserted-by":"crossref","first-page":"420","DOI":"10.1504\/IJTPM.2008.020167","article-title":"Managing operational risks in small- and medium-sized enterprises (SMEs) engaged in manufacturing: an integrated approach","volume":"8","author":"MA Islam","year":"2008","journal-title":"International Journal of Technology, Policy and Management"},{"issue":"2","key":"pone.0357560.ref014","doi-asserted-by":"crossref","first-page":"33","DOI":"10.3390\/gases2020003","article-title":"Risk management assessment in oil and gas construction projects using structural equation modeling (PLS-SEM)","volume":"2","author":"MA Kassem","year":"2022","journal-title":"Gases"},{"issue":"6","key":"pone.0357560.ref015","doi-asserted-by":"crossref","first-page":"224","DOI":"10.20469\/ijhss.5.20002-6","article-title":"Risk identification and management in construction projects: literature review","volume":"5","author":"S Sharma","year":"2019","journal-title":"Int j humanit arts soc sci"},{"issue":"1","key":"pone.0357560.ref016","doi-asserted-by":"crossref","first-page":"78","DOI":"10.1016\/j.emj.2019.06.005","article-title":"Risk management in SMEs: a systematic literature review and future directions","volume":"38","author":"P Ferreira de Ara\u00fajo Lima","year":"2020","journal-title":"European Management Journal"},{"key":"pone.0357560.ref017","author":"M Modarres","year":"2006","journal-title":"Risk analysis in engineering: techniques, tools, and trends"},{"issue":"6","key":"pone.0357560.ref018","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1016\/j.ress.2010.01.011","article-title":"On how to define, understand and describe risk","volume":"95","author":"T Aven","year":"2010","journal-title":"Reliab Eng Syst Saf"},{"issue":"5","key":"pone.0357560.ref019","doi-asserted-by":"crossref","first-page":"819","DOI":"10.1016\/j.ijproman.2016.03.001","article-title":"Selecting risk response strategies considering project risk interdependence","volume":"34","author":"Y Zhang","year":"2016","journal-title":"International Journal of Project Management"},{"issue":"5","key":"pone.0357560.ref020","doi-asserted-by":"crossref","first-page":"519","DOI":"10.1080\/13669877.2010.541562","article-title":"Development paths of risk management: approaches, methods and fields of application","volume":"14","author":"C Verbano","year":"2011","journal-title":"J Risk Res"},{"issue":"4","key":"pone.0357560.ref021","doi-asserted-by":"crossref","first-page":"408","DOI":"10.1016\/j.ijproman.2007.05.012","article-title":"Assessing risk and uncertainty inherent in Chinese highway projects using AHP","volume":"26","author":"T Zayed","year":"2008","journal-title":"International Journal of Project Management"},{"key":"pone.0357560.ref022","volume-title":"Risk management \u2014 Guidelines","author":"ISO (International Organization for Standardization) 31000","year":"2018","edition":"2"},{"issue":"1","key":"pone.0357560.ref023","first-page":"11","article-title":"An index to assess project management competencies in managing design changes","volume":"5","author":"M Taghizadeh","year":"2016","journal-title":"International Journal of Construction Engineering and Management"},{"issue":"1","key":"pone.0357560.ref024","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1108\/IJESM-06-2013-0009","article-title":"Schedule delays in engineering, procurement, and construction petrochemical projects in Vietnam","volume":"8","author":"L Hong Pham","year":"2014","journal-title":"International Journal of Energy Sector Management"},{"issue":"13","key":"pone.0357560.ref025","doi-asserted-by":"crossref","first-page":"7473","DOI":"10.3390\/su13137473","article-title":"Risk analysis and management of construction and operations in offshore wind power project","volume":"13","author":"J-S Chou","year":"2021","journal-title":"Sustainability"},{"issue":"2","key":"pone.0357560.ref026","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1108\/eb021136","article-title":"Information modelling for a construction project risk management system","volume":"7","author":"JHM Tah","year":"2000","journal-title":"Engineering, Construction and Architectural Management"},{"issue":"4","key":"pone.0357560.ref027","first-page":"8","article-title":"Delphi technique theoretical framework in qualitative research","volume":"3","author":"A Habibi","year":"2014","journal-title":"Int J Eng Sci"},{"key":"pone.0357560.ref028","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ssci.2022.105724","article-title":"Risk assessment of fatal accidents due to work at heights activities using fault tree analysis: case study in Malaysia","volume":"151","author":"A Zermane","year":"2022","journal-title":"Saf Sci"},{"key":"pone.0357560.ref029","doi-asserted-by":"crossref","first-page":"116215","DOI":"10.1016\/j.eswa.2021.116215","article-title":"An analytic network process model for risk quantification of mega construction projects","volume":"191","author":"H Erol","year":"2022","journal-title":"Expert Systems with Applications"},{"issue":"1","key":"pone.0357560.ref030","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1108\/14635770710730919","article-title":"A review of techniques for risk management in projects","volume":"14","author":"A Ahmed","year":"2007","journal-title":"Benchmarking: An International Journal"},{"issue":"2","key":"pone.0357560.ref031","doi-asserted-by":"crossref","first-page":"300","DOI":"10.1108\/IJMPB-02-2019-0047","article-title":"A review of artificial intelligence based risk assessment methods for capturing complexity-risk interdependencies","volume":"14","author":"F Afzal","year":"2019","journal-title":"IJMPB"},{"issue":"8","key":"pone.0357560.ref032","doi-asserted-by":"crossref","first-page":"102843","DOI":"10.1016\/j.asej.2024.102843","article-title":"Bibliometric analysis of the literature on risk management in the construction sector: Exploring current and future trends","volume":"15","author":"SMA Al Qudah","year":"2024","journal-title":"Ain Shams Engineering Journal"},{"issue":"1","key":"pone.0357560.ref033","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1177\/8756972819866577","article-title":"A method for risk response planning in project portfolio management","volume":"51","author":"A Ahmadi-Javid","year":"2019","journal-title":"Project Management Journal"},{"issue":"4","key":"pone.0357560.ref034","doi-asserted-by":"crossref","first-page":"100052","DOI":"10.1016\/j.iintel.2023.100052","article-title":"Risk analysis of onshore oil and gas pipelines: literature review and bibliometric analysis","volume":"2","author":"H Woldesellasse","year":"2023","journal-title":"Journal of Infrastructure Intelligence and Resilience"},{"issue":"5","key":"pone.0357560.ref035","doi-asserted-by":"crossref","first-page":"701","DOI":"10.1016\/j.ijproman.2018.03.006","article-title":"Towards integrating construction risk management and stakeholder management: a systematic literature review and future research agendas","volume":"36","author":"N Xia","year":"2018","journal-title":"International Journal of Project Management"},{"issue":"11","key":"pone.0357560.ref036","article-title":"External stakeholder risk response strategies selection in project portfolio","volume":"10","author":"L Bai","year":"2024","journal-title":"Heliyon"},{"issue":"3","key":"pone.0357560.ref037","doi-asserted-by":"crossref","first-page":"412","DOI":"10.1016\/j.ijproman.2013.06.006","article-title":"An optimization method for selecting project risk response strategies","volume":"32","author":"Y Zhang","year":"2014","journal-title":"International Journal of Project Management"},{"issue":"4","key":"pone.0357560.ref038","doi-asserted-by":"crossref","first-page":"433","DOI":"10.1016\/j.ress.2005.12.009","article-title":"A decision framework for risk management, with application to the offshore oil and gas industry","volume":"92","author":"T Aven","year":"2007","journal-title":"Reliab Eng & Syst Saf"},{"issue":"4","key":"pone.0357560.ref039","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1016\/S0263-7863(02)00017-0","article-title":"Modelling global risk factors affecting construction cost performance","volume":"21","author":"D Baloi","year":"2003","journal-title":"International Journal of Project Management"},{"issue":"1","key":"pone.0357560.ref040","doi-asserted-by":"crossref","first-page":"32","DOI":"10.1109\/52.62930","article-title":"Software risk management: principles and practices","volume":"8","author":"BW Boehm","year":"1991","journal-title":"IEEE Softw"},{"key":"pone.0357560.ref041","doi-asserted-by":"crossref","first-page":"306","DOI":"10.1016\/j.cie.2019.03.045","article-title":"A hybrid approach for quantitative assessment of construction projects risks: the case study of poor-quality concrete","volume":"131","author":"F Nasirzadeh","year":"2019","journal-title":"Comput & Ind Eng"},{"issue":"3","key":"pone.0357560.ref042","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1016\/j.tust.2008.09.004","article-title":"Quantitative risk evaluation based on event tree analysis technique: application to the design of shield TBM","volume":"24","author":"ES Hong","year":"2009","journal-title":"Tunnelling and Underground Space Technology"},{"issue":"6","key":"pone.0357560.ref043","first-page":"703","article-title":"Facilitate risk management in construction process by using hierarchical risk breakdown structure","volume":"7","author":"C Zid","year":"2016","journal-title":"International Journal of Scientific & Technology Research Publications"},{"issue":"11","key":"pone.0357560.ref044","doi-asserted-by":"crossref","first-page":"7839","DOI":"10.1007\/s00500-019-03917-4","article-title":"Design of building construction safety prediction model based on optimized BP neural network algorithm","volume":"24","author":"T Shen","year":"2019","journal-title":"Soft Comput"},{"key":"pone.0357560.ref045","doi-asserted-by":"crossref","first-page":"105947","DOI":"10.1016\/j.asoc.2019.105947","article-title":"A novel learning cloud Bayesian network for risk measurement","volume":"87","author":"C Chen","year":"2020","journal-title":"Applied Soft Computing"},{"issue":"20","key":"pone.0357560.ref046","doi-asserted-by":"crossref","first-page":"1","DOI":"10.3390\/su132011277","article-title":"A TOPSIS\u2014risk matrix and monte carlo expert system for risk assessment in engineering projects","volume":"13","author":"GK Koulinas","year":"2021","journal-title":"Sustainability"},{"key":"pone.0357560.ref047","doi-asserted-by":"crossref","first-page":"116","DOI":"10.1016\/j.petrol.2017.01.035","article-title":"Risk management in petroleum development projects: Technical and economic indicators to define a robust production strategy","volume":"151","author":"SMG Santos","year":"2017","journal-title":"J Pet Sci & Eng"},{"issue":"1","key":"pone.0357560.ref048","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1007\/s10018-018-0222-0","article-title":"Improving the risk\u2013risk trade-off method for use in safety project appraisal responses","volume":"21","author":"JS Nielsen","year":"2018","journal-title":"Environ Econ Policy Stud"},{"key":"pone.0357560.ref049","doi-asserted-by":"crossref","first-page":"622","DOI":"10.1016\/j.cie.2019.01.012","article-title":"Developing the R-TOPSIS methodology for risk-based preventive maintenance planning: a case study in rolling mill company","volume":"128","author":"H Seiti","year":"2019","journal-title":"Comput & Ind Eng"},{"key":"pone.0357560.ref050","first-page":"407","article-title":"Proposed risk management decision support methodology for oil and gas construction projects","author":"MK. Al Mhdawi","year":"2020","journal-title":"The 10th International Conference on Engineering, Project, and Production Management"},{"issue":"19","key":"pone.0357560.ref051","doi-asserted-by":"crossref","first-page":"4091","DOI":"10.3390\/math11194091","article-title":"Modeling of project portfolio risk evolution and response under the influence of interactions","volume":"11","author":"Y Zhang","year":"2023","journal-title":"Mathematics"},{"issue":"3","key":"pone.0357560.ref052","first-page":"1","article-title":"An efficient scenario reduction method for problems with higher moment coherent risk measures","volume":"37","author":"X He","year":"2024","journal-title":"INFORMS J Comput"},{"key":"pone.0357560.ref053","doi-asserted-by":"crossref","first-page":"835","DOI":"10.1016\/S0965-9978(01)00035-7","article-title":"Towards a framework for project risk knowledge management in the construction supply chain","volume":"32","author":"JHM Tah","year":"2001","journal-title":"Advances in Engineering Software"},{"issue":"8","key":"pone.0357560.ref054","doi-asserted-by":"crossref","first-page":"437","DOI":"10.1016\/S0263-7863(01)00045-X","article-title":"Understanding and managing risks in large engineering projects","volume":"19","author":"R Miller","year":"2001","journal-title":"International Journal of Project Management"},{"issue":"8","key":"pone.0357560.ref055","doi-asserted-by":"crossref","first-page":"999","DOI":"10.1080\/13669877.2019.1588912","article-title":"Aggregating risk matrices under a normative framework","volume":"24","author":"C Bao","year":"2019","journal-title":"Journal of Risk Research"},{"issue":"3","key":"pone.0357560.ref056","doi-asserted-by":"crossref","first-page":"194","DOI":"10.1002\/sys.10025","article-title":"Selection of technical risk responses for efficient contingencies","volume":"5","author":"E Kujawski","year":"2002","journal-title":"Systems Engineering"},{"issue":"5","key":"pone.0357560.ref057","doi-asserted-by":"crossref","first-page":"752","DOI":"10.1111\/j.1539-6924.2008.01187.x","article-title":"An integrated methodology for assessment and selection of the project risk response actions","volume":"29","author":"SM Seyedhoseini","year":"2009","journal-title":"Risk Anal"},{"issue":"1","key":"pone.0357560.ref058","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1057\/palgrave.jors.2601029","article-title":"An integrated approach for risk response development in project planning","volume":"52","author":"I Ben-David","year":"2001","journal-title":"Journal of the Operational Research Society"},{"issue":"4","key":"pone.0357560.ref059","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1108\/GS-10-2019-0043","article-title":"Research on project risk response strategy selection based on grey K-shell algorithm","volume":"10","author":"Y Chu","year":"2020","journal-title":"GS"},{"issue":"6","key":"pone.0357560.ref060","doi-asserted-by":"crossref","first-page":"2870","DOI":"10.1016\/j.eswa.2014.11.034","article-title":"Generating project risk response strategies based on CBR: A case study","volume":"42","author":"Z-P Fan","year":"2015","journal-title":"Expert Systems with Applications"},{"key":"pone.0357560.ref061","doi-asserted-by":"crossref","first-page":"609","DOI":"10.1016\/j.procs.2017.11.080","article-title":"A mathematical Model to select the risk response strategies of the construction projects: case study of saba tower","volume":"121","author":"E Cheraghi","year":"2017","journal-title":"Procedia Computer Science"},{"key":"pone.0357560.ref062","doi-asserted-by":"crossref","first-page":"120120","DOI":"10.1016\/j.eswa.2023.120120","article-title":"Selecting risk response strategies to minimize human errors in a design project for factories of the future","volume":"225","author":"G Jin","year":"2023","journal-title":"Expert Systems with Applications"},{"key":"pone.0357560.ref063","doi-asserted-by":"crossref","first-page":"100313","DOI":"10.1016\/j.pdisas.2024.100313","article-title":"An optimization-based risk management framework with risk interdependence for effective disaster risk reduction","volume":"21","author":"M Safaeian","year":"2024","journal-title":"Progress in Disaster Science"},{"key":"pone.0357560.ref064","first-page":"1","article-title":"Dynamic selection of risk response strategies with resource allocation for construction project portfolios","volume":"191","author":"L Bai","year":"2024","journal-title":"Comput Ind Eng"},{"key":"pone.0357560.ref065","doi-asserted-by":"crossref","first-page":"333","DOI":"10.1016\/j.jbusres.2019.07.039","article-title":"Literature review as a research methodology: an overview and guidelines","volume":"104","author":"H Snyder","year":"2019","journal-title":"J Bus Res"},{"issue":"7","key":"pone.0357560.ref066","doi-asserted-by":"crossref","first-page":"1463","DOI":"10.1108\/IMDS-10-2017-0467","article-title":"A fuzzy-based House of Risk assessment method for manufacturers in global supply chains","volume":"118","author":"H-L Ma","year":"2018","journal-title":"Industrial Management & Data Systems"},{"key":"pone.0357560.ref067","doi-asserted-by":"crossref","first-page":"308","DOI":"10.1016\/j.psep.2019.12.001","article-title":"Supporting risk management decision making by converting linguistic graded qualitative risk matrices through interval type-2 fuzzy sets","volume":"134","author":"Y Hong","year":"2020","journal-title":"Process Safety and Environmental Protection"},{"issue":"2","key":"pone.0357560.ref068","doi-asserted-by":"crossref","first-page":"172","DOI":"10.1287\/opre.2.2.172","article-title":"An approximate measure of value","volume":"2","author":"CW Churchman","year":"1954","journal-title":"OR"},{"issue":"6","key":"pone.0357560.ref069","doi-asserted-by":"crossref","first-page":"3","DOI":"10.5755\/j01.eee.122.6.1810","article-title":"Optimization of weighted aggregated sum product assessment","volume":"122","author":"EK Zavadskas","year":"2012","journal-title":"Elektron Elektrotech"},{"key":"pone.0357560.ref070","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1016\/j.jclepro.2016.07.031","article-title":"Multi-criteria evaluation of green suppliers using an extended WASPAS method with interval type-2 fuzzy sets","volume":"137","author":"M Keshavarz Ghorabaee","year":"2016","journal-title":"J Clean Prod"},{"issue":"2","key":"pone.0357560.ref071","doi-asserted-by":"crossref","first-page":"243","DOI":"10.3846\/jbem.2010.12","article-title":"Selection of rational dispute resolution method by applying new step\u2010wise weight assessment ratio analysis (SWARA)","volume":"11","author":"V Ker\u0161ulien\u0117","year":"2010","journal-title":"Journal of Business Economics and Management"},{"issue":"5","key":"pone.0357560.ref072","doi-asserted-by":"crossref","DOI":"10.1002\/ep.13837","article-title":"Combining life cycle sustainability assessment and fuzzy multicriteria decision making method for prioritizing the flare technologies in the oil, gas, and chemical plants","volume":"41","author":"A Fetanat","year":"2022","journal-title":"Env Prog and Sustain Energy"},{"issue":"1","key":"pone.0357560.ref073","first-page":"379","article-title":"Hybrid MCDM method on pythagorean fuzzy set and its application","volume":"6","author":"R Chaurasiya","year":"2023","journal-title":"Decision Making: Applications in Management and Engineering"},{"key":"pone.0357560.ref074","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1016\/j.omega.2014.11.009","article-title":"Best-worst multi-criteria decision-making method","volume":"53","author":"J Rezaei","year":"2015","journal-title":"Omega"},{"issue":"2","key":"pone.0357560.ref075","first-page":"126","article-title":"New model for determining criteria weights: Level based weight assessment (lbwa) model","volume":"2","author":"M \u017di\u017eovic","year":"2019","journal-title":"Decision Making: Applications in Management and Engineering"},{"key":"pone.0357560.ref076","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1016\/j.asoc.2018.01.023","article-title":"Sustainable third-party reverse logistics provider evaluation and selection using fuzzy SWARA and developed fuzzy COPRAS in the presence of risk criteria","volume":"65","author":"N Zarbakhshnia","year":"2018","journal-title":"Applied Soft Computing"},{"key":"pone.0357560.ref077","doi-asserted-by":"crossref","first-page":"1287","DOI":"10.1016\/j.renene.2020.08.131","article-title":"SWARA\/WASPAS methods for a marine current energy plant location selection problem","volume":"163","author":"GN Y\u00fccenur","year":"2021","journal-title":"Renewable Energy"},{"issue":"2","key":"pone.0357560.ref078","doi-asserted-by":"crossref","first-page":"243","DOI":"10.1108\/MBE-07-2018-0041","article-title":"Supplier selection using SWARA and WASPAS \u2013 a case study of Indian cement industry","volume":"24","author":"RK Singh","year":"2020","journal-title":"MBE"},{"issue":"3","key":"pone.0357560.ref079","first-page":"455","article-title":"Comparison of three fuzzy mcdm methods for solving the supplier selection problem. Facta Universitatis, Series:","volume":"17","author":"G Petrovi\u0107","year":"Nov. 2019","journal-title":"Mechanical Engineering"},{"issue":"1","key":"pone.0357560.ref080","doi-asserted-by":"crossref","first-page":"77","DOI":"10.3390\/encyclopedia3010006","article-title":"Multi-Criteria Decision Making (MCDM) Methods and Concepts","volume":"3","author":"H Taherdoost","year":"2023","journal-title":"Encyclopedia"},{"issue":"1","key":"pone.0357560.ref081","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1007\/s00477-006-0042-9","article-title":"Risk-based environmental decision-making using fuzzy analytic hierarchy process (F-AHP)","volume":"21","author":"S Tesfamariam","year":"2006","journal-title":"Stoch Environ Res Ris Assess"},{"issue":"2","key":"pone.0357560.ref082","doi-asserted-by":"crossref","first-page":"1235","DOI":"10.1016\/j.asoc.2012.09.021","article-title":"Intuitionistic fuzzy geometric Heronian mean aggregation operators","volume":"13","author":"D Yu","year":"2013","journal-title":"Applied Soft Computing"}],"container-title":["PLOS One"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/dx.plos.org\/10.1371\/journal.pone.0357560","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,9,24]],"date-time":"2026-09-24T17:39:39Z","timestamp":1790271579000},"score":1,"resource":{"primary":{"URL":"https:\/\/dx.plos.org\/10.1371\/journal.pone.0357560"}},"subtitle":[],"editor":[{"given":"Issa","family":"Atoum","sequence":"first","affiliation":[{"name":"Philadelphia University","place":["JORDAN"]}],"role":[{"vocabulary":"crossref","role":"editor"}]}],"short-title":[],"issued":{"date-parts":[[2026,9,24]]},"references-count":82,"journal-issue":{"issue":"9","published-online":{"date-parts":[[2026,9,24]]}},"URL":"https:\/\/doi.org\/10.1371\/journal.pone.0357560","relation":{},"ISSN":["1932-6203"],"issn-type":[{"value":"1932-6203","type":"electronic"}],"subject":[],"published":{"date-parts":[[2026,9,24]]}}}