{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,5,15]],"date-time":"2024-05-15T23:10:18Z","timestamp":1715814618933},"reference-count":11,"publisher":"University of Zielona G\u00f3ra, Poland","issue":"3","license":[{"start":{"date-parts":[[2016,9,1]],"date-time":"2016-09-01T00:00:00Z","timestamp":1472688000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/3.0"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,9,1]]},"abstract":"<jats:title>Abstract<\/jats:title>\n               <jats:p>In this work we consider a problem of scheduling preemptable, independent jobs, characterized by the fact that their processing speeds depend on the amounts of a continuous, renewable resource allocated to jobs at a time. Jobs are scheduled on parallel, identical machines, with the criterion of minimization of the schedule length. Since two categories of resources occur in the problem: discrete (set of machines) and continuous, it is generally called a discrete-continuous scheduling problem. The model studied in this paper allows the total available amount of the continuous resource to vary over time, which is a practically important generalization that has not been considered yet for discrete-continuous scheduling problems. For this model we give some properties of optimal schedules on a basis of which we propose a general methodology for solving the considered class of problems. The methodology uses a two-phase approach in which, firstly, an assignment of machines to jobs is defined and, secondly, for this assignment an optimal continuous resource allocation is found by solving an appropriate mathematical programming problem. In the approach various cases are considered, following from assumptions made on the form of the processing speed functions of jobs. For each case an iterative algorithm is designed, leading to an optimal solution in a finite number of steps.<\/jats:p>","DOI":"10.1515\/amcs-2016-0048","type":"journal-article","created":{"date-parts":[[2016,9,30]],"date-time":"2016-09-30T07:47:30Z","timestamp":1475221650000},"page":"693-706","source":"Crossref","is-referenced-by-count":2,"title":["Scheduling preemptable jobs on identical processors under varying availability of an additional continuous resource"],"prefix":"10.61822","volume":"26","author":[{"given":"Rafa\u0142","family":"R\u00f3\u017cycki","sequence":"first","affiliation":[{"name":"Institute of Computing Science, Pozna\u0144 University of Technology, Piotrowo 2, 60-965 Pozna\u0144, Poland"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Grzegorz","family":"Walig\u00f3ra","sequence":"additional","affiliation":[{"name":"Institute of Computing Science, Pozna\u0144 University of Technology, Piotrowo 2, 60-965 Pozna\u0144, Poland"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jan","family":"W\u0119glarz","sequence":"additional","affiliation":[{"name":"Institute of Computing Science, Pozna\u0144 University of Technology, Piotrowo 2, 60-965 Pozna\u0144, Poland"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"37438","published-online":{"date-parts":[[2016,9,29]]},"reference":[{"key":"2021040706142494326_j_amcs-2016-0048_ref_001_w2aab2b8c15b1b7b1ab1ab1Aa","unstructured":"B\u0142a\u017cewicz, J., Ecker, K., Schmidt, G., Pesch, E. and W\u0119glarz, J. (2007). Handbook of Scheduling: From Theory to Applications, Springer, Berlin."},{"key":"2021040706142494326_j_amcs-2016-0048_ref_002_w2aab2b8c15b1b7b1ab1ab2Aa","doi-asserted-by":"crossref","unstructured":"Gorczyca, M. and Janiak, A. (2010). Resource level minimization in the discrete-continuous scheduling, European Journal of Operational Research203(1): 32\u201341.","DOI":"10.1016\/j.ejor.2009.07.021"},{"key":"2021040706142494326_j_amcs-2016-0048_ref_003_w2aab2b8c15b1b7b1ab1ab3Aa","doi-asserted-by":"crossref","unstructured":"Janiak, A. (1991). Single machine scheduling problem with a common deadline and resource dependent release dates, European Journal of Operational Research53(3): 317\u2013325.","DOI":"10.1016\/0377-2217(91)90065-4"},{"key":"2021040706142494326_j_amcs-2016-0048_ref_004_w2aab2b8c15b1b7b1ab1ab4Aa","doi-asserted-by":"crossref","unstructured":"Karmarkar, N.K. (1984). A new polynomial time algorithm for linear programming, Combinatorica4(4): 373\u2013395.","DOI":"10.1007\/BF02579150"},{"key":"2021040706142494326_j_amcs-2016-0048_ref_005_w2aab2b8c15b1b7b1ab1ab5Aa","doi-asserted-by":"crossref","unstructured":"Kis, T. (2005). A branch-and-cut algorithm for scheduling of projects with variable-intensity activities, Mathematical Programming103(3): 515\u2013139.","DOI":"10.1007\/s10107-004-0551-6"},{"key":"2021040706142494326_j_amcs-2016-0048_ref_006_w2aab2b8c15b1b7b1ab1ab6Aa","doi-asserted-by":"crossref","unstructured":"Leachman, R.C. (1983). Multiple resource leveling in construction systems through variation of activity intensities, Naval Research Logistics Quarterly30(3): 187\u2013198.","DOI":"10.1002\/nav.3800300202"},{"key":"2021040706142494326_j_amcs-2016-0048_ref_007_w2aab2b8c15b1b7b1ab1ab7Aa","doi-asserted-by":"crossref","unstructured":"Leachman, R.C., Dincerler, A. and Kim, S. (1990). Resource-constrained scheduling of projects with variable-intensity activities, IIE Transactions22(1): 31\u201339.","DOI":"10.1080\/07408179008964155"},{"key":"2021040706142494326_j_amcs-2016-0048_ref_008_w2aab2b8c15b1b7b1ab1ab8Aa","doi-asserted-by":"crossref","unstructured":"R\u00f3\u017cycki, R. and W\u0119glarz, J. (2012). Power-aware scheduling of preemptable jobs on identical parallel processors to meet deadlines, European Journal of Operational Research218(1): 68\u201375.","DOI":"10.1016\/j.ejor.2011.10.017"},{"key":"2021040706142494326_j_amcs-2016-0048_ref_009_w2aab2b8c15b1b7b1ab1ab9Aa","doi-asserted-by":"crossref","unstructured":"Walig\u00f3ra, G. (2011). Heuristic approaches to discrete-continuous project scheduling problems to minimize the makespan, Computational Optimization and Applications48(2): 399\u2013421.","DOI":"10.1007\/s10589-010-9343-5"},{"key":"2021040706142494326_j_amcs-2016-0048_ref_010_w2aab2b8c15b1b7b1ab1ac10Aa","doi-asserted-by":"crossref","unstructured":"Walig\u00f3ra, G. (2014). Discrete-continuous project scheduling with discounted cash inflows and various payment models\u2014a review of recent results, Annals of Operations Research213(1): 319\u2013340.","DOI":"10.1007\/s10479-011-1014-0"},{"key":"2021040706142494326_j_amcs-2016-0048_ref_011_w2aab2b8c15b1b7b1ab1ac11Aa","doi-asserted-by":"crossref","unstructured":"W\u0119glarz, J. (1976). Time-optimal control of resource allocation in a complex of operations framework, IEEE Transactions on Systems, Man and Cybernetics6(11): 783\u2013788.","DOI":"10.1109\/TSMC.1976.4309456"}],"container-title":["International Journal of Applied Mathematics and Computer Science"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/content.sciendo.com\/view\/journals\/amcs\/26\/3\/article-p693.xml","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.sciendo.com\/article\/10.1515\/amcs-2016-0048","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,5,15]],"date-time":"2024-05-15T22:57:09Z","timestamp":1715813829000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.sciendo.com\/article\/10.1515\/amcs-2016-0048"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,9,1]]},"references-count":11,"journal-issue":{"issue":"3","published-online":{"date-parts":[[2016,9,29]]},"published-print":{"date-parts":[[2016,9,1]]}},"alternative-id":["10.1515\/amcs-2016-0048"],"URL":"https:\/\/doi.org\/10.1515\/amcs-2016-0048","relation":{},"ISSN":["2083-8492"],"issn-type":[{"value":"2083-8492","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,9,1]]}}}